Gregory Loughran Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2016 to Feb 2024
- Last 24 months
- 0 permits filed
34 permits since 2000: 31 completed, 3 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
1 roof deck permit: 1 completed. Typically 40 days from filing to permit and 261 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 17, 2021 | Completed final sign-off Apr 2022 | 118 28th Av | 1) enlarge (e) powder room at main floor. 2) enlarge (e) bathroom at upper floor. 3) add roof 153sf roof deck along rear of upper flr. 4) remodel (e) master bathroom wi new fixtures, cabinets, floor tile and wall paint. 5) add 16"x36" attic pull down ladder w/ roof hatch access.Details
1) enlarge (e) powder room at main floor. 2) enlarge (e) bathroom at upper floor. 3) add roof 153sf roof deck along rear of upper flr. 4) remodel (e) master bathroom wi new fixtures, cabinets, floor tile and wall paint. 5) add 16"x36" attic pull down ladder w/ roof hatch access. | $120,000 |