Back to bathroom remodel contractors
Gregory Loughran Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2016 to Feb 2024
- Last 24 months
- 0 permits filed
34 permits since 2000: 31 completed, 3 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
13 bathroom remodel permits: 13 completed. Typically 6 days from filing to permit and 162 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 1, 2024 | Completed final sign-off May 2024 | 1567 Francisco St | bathroom remodel - add plumbing and electric for wetbar on 4/f. no walls moved.Details
bathroom remodel - add plumbing and electric for wetbar on 4/f. no walls moved. | $25,000 |
| Feb 1, 2023 | Completed final sign-off Apr 2023 | 3898 Washington St | replace plumbing fixtures in bathroom, remove and replace shower tile. new shower pan. no walls moved. all replacement to be in kind.Details
replace plumbing fixtures in bathroom, remove and replace shower tile. new shower pan. no walls moved. all replacement to be in kind. | $10,000 |
| Oct 18, 2022 | Completed final sign-off Dec 2023 | 440 36th Av | remodel of sfd. new windows, doors, lighting, plumbing fixures, finishes. infill deck stair, new laundry room, new entry gate. bathroom and kitchen remodel.Details
remodel of sfd. new windows, doors, lighting, plumbing fixures, finishes. infill deck stair, new laundry room, new entry gate. bathroom and kitchen remodel. | $250,000 |
| May 26, 2022 | Completed final sign-off Nov 2023 | 269 29th Av | (n) deck @ rear. 1st/f: infill light well to creatr bigger power rm, infill an alcove @ north side of the bldg. recofigure 1st/f space to create mew dinning, family rm. 2nd/f: add an entry btw kid room #2 & kids playroom. recofigure master bath and common bath. infill light wells 2nd fl.Details
(n) deck @ rear. 1st/f: infill light well to creatr bigger power rm, infill an alcove @ north side of the bldg. recofigure 1st/f space to create mew dinning, family rm. 2nd/f: add an entry btw kid room #2 & kids playroom. recofigure master bath and common bath. infill light wells 2nd fl. | $220,000 |
| Nov 15, 2021 | Completed final sign-off Apr 2022 | 682 12th Av | construction of new primary bathroom(2nd floor) off of primary bedroom in the space that is currently a walk in closet.Details
construction of new primary bathroom(2nd floor) off of primary bedroom in the space that is currently a walk in closet. | $15,000 |
| Jun 17, 2021 | Completed final sign-off Apr 2022 | 118 28th Av | 1) enlarge (e) powder room at main floor. 2) enlarge (e) bathroom at upper floor. 3) add roof 153sf roof deck along rear of upper flr. 4) remodel (e) master bathroom wi new fixtures, cabinets, floor tile and wall paint. 5) add 16"x36" attic pull down ladder w/ roof hatch access.Details
1) enlarge (e) powder room at main floor. 2) enlarge (e) bathroom at upper floor. 3) add roof 153sf roof deck along rear of upper flr. 4) remodel (e) master bathroom wi new fixtures, cabinets, floor tile and wall paint. 5) add 16"x36" attic pull down ladder w/ roof hatch access. | $120,000 |
| Jan 9, 2020 | Completed final sign-off Jul 2021 | 1520 06th Av | convert 584 sf of storage space to habitable area with bedroom, playrm and 2 baths and laundry in the lower fl. add new stairs from upper to lower floor, convert (e) bath to pwder rm, add 6' concrete patio at rear of `Details
convert 584 sf of storage space to habitable area with bedroom, playrm and 2 baths and laundry in the lower fl. add new stairs from upper to lower floor, convert (e) bath to pwder rm, add 6' concrete patio at rear of ` | $300,000 |
| May 4, 2018 | Completed final sign-off Aug 2018 | 175 Russ St | remove and replace (e) kitchen cabinet and countertop. remove (e) woo t floor entry - kitchen and replace with tile. 1 half bathroom at entry - remove and replace sink, toilet and tile.Details
remove and replace (e) kitchen cabinet and countertop. remove (e) woo t floor entry - kitchen and replace with tile. 1 half bathroom at entry - remove and replace sink, toilet and tile. | $30,000 |
| Oct 18, 2017 | Completed final sign-off Dec 2017 | 164 19th Av | remodel existing bathroom, replace tub, vanity, tile, new wiring and plumbing.Details
remodel existing bathroom, replace tub, vanity, tile, new wiring and plumbing. | $15,000 |
| Sep 12, 2017 | Completed final sign-off Aug 2018 | 114 Virginia Av | 1st fl: remove (e) stairs, add (n) stairs, add bedroom, remodel family rm, add (2) bathrooms. 2nd fl: remodel (e) two bathrooms, bedrooms, enclose lightwell to add (n) office, remodel kitchen. new windows. repair deck.Details
1st fl: remove (e) stairs, add (n) stairs, add bedroom, remodel family rm, add (2) bathrooms. 2nd fl: remodel (e) two bathrooms, bedrooms, enclose lightwell to add (n) office, remodel kitchen. new windows. repair deck. | $100,000 |
| Jun 30, 2017 | Completed final sign-off Nov 2017 | 1520 06th Av | interior remodel of (e) 2nd floor to include (n) partitions, cabinetry, plumbing, fixtures and lighting in (e) bathroom and kitchen. add bathroom in 2nd floor, convert (e) light court to enclosed habitable space.Details
interior remodel of (e) 2nd floor to include (n) partitions, cabinetry, plumbing, fixtures and lighting in (e) bathroom and kitchen. add bathroom in 2nd floor, convert (e) light court to enclosed habitable space. | $60,000 |
| Nov 3, 2016 | Completed final sign-off Sep 2018 | 41 Landers St | small bath remodel, new fixtures, shower, plumbing, electrical, no walls moved. no structural work, no wall modificatoin.Details
small bath remodel, new fixtures, shower, plumbing, electrical, no walls moved. no structural work, no wall modificatoin. | $8,000 |
| Oct 19, 2016 | Completed final sign-off Mar 2017 | 1034 Jackson St | bathroom and kitchen remodel. new plumbing, new electrical, cabinets and countertops. 1 bathroom and 1 kitchen, same area. no walls to be removed. no change to egress, occupancy or increase. no work in common area.Details
bathroom and kitchen remodel. new plumbing, new electrical, cabinets and countertops. 1 bathroom and 1 kitchen, same area. no walls to be removed. no change to egress, occupancy or increase. no work in common area. |