Back to kitchen remodel contractors
Gregory Loughran Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2016 to Feb 2024
- Last 24 months
- 0 permits filed
34 permits since 2000: 31 completed, 3 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
6 kitchen remodel permits: 5 completed, 1 expired or cancelled. Typically 6 days from filing to permit and 162 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 18, 2022 | Completed final sign-off Dec 2023 | 440 36th Av | remodel of sfd. new windows, doors, lighting, plumbing fixures, finishes. infill deck stair, new laundry room, new entry gate. bathroom and kitchen remodel.Details
remodel of sfd. new windows, doors, lighting, plumbing fixures, finishes. infill deck stair, new laundry room, new entry gate. bathroom and kitchen remodel. | $250,000 |
| May 17, 2018 | Expired or cancelled suspend Jun 2018 | 145 Missouri St | to comply with nov #201858781 dated 4/27/18, 2nd floor kitchen & rear deck remodel. replace front fence & gate. maher naDetails
to comply with nov #201858781 dated 4/27/18, 2nd floor kitchen & rear deck remodel. replace front fence & gate. maher na | $15,000 |
| May 4, 2018 | Completed final sign-off Aug 2018 | 175 Russ St | remove and replace (e) kitchen cabinet and countertop. remove (e) woo t floor entry - kitchen and replace with tile. 1 half bathroom at entry - remove and replace sink, toilet and tile.Details
remove and replace (e) kitchen cabinet and countertop. remove (e) woo t floor entry - kitchen and replace with tile. 1 half bathroom at entry - remove and replace sink, toilet and tile. | $30,000 |
| Sep 12, 2017 | Completed final sign-off Aug 2018 | 114 Virginia Av | 1st fl: remove (e) stairs, add (n) stairs, add bedroom, remodel family rm, add (2) bathrooms. 2nd fl: remodel (e) two bathrooms, bedrooms, enclose lightwell to add (n) office, remodel kitchen. new windows. repair deck.Details
1st fl: remove (e) stairs, add (n) stairs, add bedroom, remodel family rm, add (2) bathrooms. 2nd fl: remodel (e) two bathrooms, bedrooms, enclose lightwell to add (n) office, remodel kitchen. new windows. repair deck. | $100,000 |
| Jun 30, 2017 | Completed final sign-off Nov 2017 | 1520 06th Av | interior remodel of (e) 2nd floor to include (n) partitions, cabinetry, plumbing, fixtures and lighting in (e) bathroom and kitchen. add bathroom in 2nd floor, convert (e) light court to enclosed habitable space.Details
interior remodel of (e) 2nd floor to include (n) partitions, cabinetry, plumbing, fixtures and lighting in (e) bathroom and kitchen. add bathroom in 2nd floor, convert (e) light court to enclosed habitable space. | $60,000 |
| Oct 19, 2016 | Completed final sign-off Mar 2017 | 1034 Jackson St | bathroom and kitchen remodel. new plumbing, new electrical, cabinets and countertops. 1 bathroom and 1 kitchen, same area. no walls to be removed. no change to egress, occupancy or increase. no work in common area.Details
bathroom and kitchen remodel. new plumbing, new electrical, cabinets and countertops. 1 bathroom and 1 kitchen, same area. no walls to be removed. no change to egress, occupancy or increase. no work in common area. |