Block 1378, lot 023
160 19th Ave
- City’s use
- Multi-Family Residential
- Built
- 1916
- Stories
- 2
- Units
- 3
- Rooms
- 6 bedrooms, 3 bathrooms
- Building
- 3,190 sq ft
- Lot
- 3,105 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 31, 2019 | Completed final sign-off Nov 2019 | 160 19th Av | Lingruen Associates | termite control. install additional 5/8" bolts with 3" x 3" washer set in epoxy aluminum of 8" into existing foundation set 3'-4' o.c. install simpson connectors at 5 post/beam & post/pier connetions.Details
termite control. install additional 5/8" bolts with 3" x 3" washer set in epoxy aluminum of 8" into existing foundation set 3'-4' o.c. install simpson connectors at 5 post/beam & post/pier connetions. | $5,600 |
| Oct 18, 2017 | Completed final sign-off Dec 2017 | 164 19th Av | Gregory Loughran Construction | remodel existing bathroom, replace tub, vanity, tile, new wiring and plumbing.Details
remodel existing bathroom, replace tub, vanity, tile, new wiring and plumbing. | $15,000 |
| Jul 17, 2017 | Completed final sign-off Sep 2017 | 164 19th Av | London Chimney Services Inc | repair of fireplace flue to improve safety. conversion from wood-burning to gas-fired: installation of gas line and log set.Details
repair of fireplace flue to improve safety. conversion from wood-burning to gas-fired: installation of gas line and log set. | $7,500 |
| Aug 16, 2016 | Completed final sign-off Aug 2016 | 160 19th Av | to obtain final inspection for work approved under pa#201211264802. all work is complete.Details
to obtain final inspection for work approved under pa#201211264802. all work is complete. | ||
| Apr 29, 2015 | Completed final sign-off Oct 2015 | 162 19th Av | Tom Lee Roofing Inc. | reroofingDetails
reroofing | $14,650 |
| Nov 26, 2012 | Completed final sign-off Aug 2016 | 160 19th Av | replace plaster/bath with 5/8 drywall in unit 160 only. upgrade electrical in unit 16019th rear unit. remodel one kitchen and one bathroom(new fixtures/cabinets) insulate non habitable attic space with r30, insulate wall cavities and r19 insulation.Details
replace plaster/bath with 5/8 drywall in unit 160 only. upgrade electrical in unit 16019th rear unit. remodel one kitchen and one bathroom(new fixtures/cabinets) insulate non habitable attic space with r30, insulate wall cavities and r19 insulation. | $28,000 | |
| Nov 5, 2012 | Never finaled issued Nov 2012, no final | 160 19th Av | add address to top floor rear unit. at 160 19th ave. blk 1378, lot 023.Details
add address to top floor rear unit. at 160 19th ave. blk 1378, lot 023. | ||
| Oct 10, 2012 | Completed final sign-off Oct 2012 | 162 19th Av | for adminstrative purposes to document that the bldg is a 3 story 3 unit residential bldg. this is based on pa# 152666 which converted (e) 2 unit bldg to 3 residential units. a site visit verified that 3 units exist. no work to be done on this permitDetails
for adminstrative purposes to document that the bldg is a 3 story 3 unit residential bldg. this is based on pa# 152666 which converted (e) 2 unit bldg to 3 residential units. a site visit verified that 3 units exist. no work to be done on this permit |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Gregory Loughran Construction, Lingruen Associates, London Chimney Services Inc, Tom Lee Roofing Inc.
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.