Back to kitchen remodel contractors
Green Metro Inc
- Based in
- Burlingame
- On San Francisco permits
- Dec 2005 to Dec 2023
- Last 24 months
- 0 permits filed
55 permits since 2000: 49 completed, 1 never finaled, 5 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
19 kitchen remodel permits: 17 completed, 2 expired or cancelled. Typically 0 days from filing to permit and 84 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 24, 2019 | Completed final sign-off Sep 2023 | 1529 Dolores St | revision to app#201712015277 ground floor 1)relocate interior staircase 2)swap family and bedroom location. 3)relocate 3 fixtures bathroom. 2nd floor: 4)swap dining and kitchen location. 3rd floor: 5) reconfigure interior layout per plan.Details
revision to app#201712015277 ground floor 1)relocate interior staircase 2)swap family and bedroom location. 3)relocate 3 fixtures bathroom. 2nd floor: 4)swap dining and kitchen location. 3rd floor: 5) reconfigure interior layout per plan. | $30,000 |
| Jan 31, 2018 | Completed final sign-off May 2018 | 1995 Turk St | demo non load bearing wall btw kitchen/dining. modifu load bearing wall at kitchen, new kitchen cabinets. elec outlets for kit., living rm, bedrooms. (sep ele permit) close (e) dooreway to turn (e) living tn to bedroom 2. close (e) doorway btw bath & closet- bldg has no fire alarms orDetails
demo non load bearing wall btw kitchen/dining. modifu load bearing wall at kitchen, new kitchen cabinets. elec outlets for kit., living rm, bedrooms. (sep ele permit) close (e) dooreway to turn (e) living tn to bedroom 2. close (e) doorway btw bath & closet- bldg has no fire alarms or | $50,000 |
| Dec 1, 2017 | Completed final sign-off Mar 2021 | 1529 Dolores St | add 1 family room, bedroom, mudroom, bathroom, laundry at ground floor.remove(e) deck add (n) deck and patio at rear. new interior stair from ground to 2nd floor. remodel kitchen & powder at 2nd floor. add 1 master bathroom, remodel (e) bathroom at 3rd floor.Details
add 1 family room, bedroom, mudroom, bathroom, laundry at ground floor.remove(e) deck add (n) deck and patio at rear. new interior stair from ground to 2nd floor. remodel kitchen & powder at 2nd floor. add 1 master bathroom, remodel (e) bathroom at 3rd floor. | $250,000 |
| Jun 24, 2014 | Completed final sign-off Aug 2014 | 158 Beverly St | full remodel kitchen, install lighting/without changing wall and fixture locations. dryrot replace the window casing, exterior siding; repair the dryrot around sliding door in light well, not street visible. repair rear wall in kind.Details
full remodel kitchen, install lighting/without changing wall and fixture locations. dryrot replace the window casing, exterior siding; repair the dryrot around sliding door in light well, not street visible. repair rear wall in kind. | $14,240 |
| Dec 30, 2013 | Completed final sign-off Apr 2016 | 110 Santa Clara Av | 1)add a entertainment area, a half bathroom with laundry area and wet bar at basement level. 2)remodel extg bathrooms and kitchen area at 1st , 2nd level. 3) replace all the windows in kind with wood frame material windows.Details
1)add a entertainment area, a half bathroom with laundry area and wet bar at basement level. 2)remodel extg bathrooms and kitchen area at 1st , 2nd level. 3) replace all the windows in kind with wood frame material windows. | $70,000 |
| Jan 3, 2013 | Completed final sign-off Feb 2013 | 2245 Beach St | kitchen-full remodel, no wall hanges (replace in-kind, same location), half bath - replace wall tile, vanity, toilet, faucets, vanity lights and exhaust fan, aster bath: replace vanity light & exhaust fan, dry rot repair, repair dry rot in iving room windows 9around windows)Details
kitchen-full remodel, no wall hanges (replace in-kind, same location), half bath - replace wall tile, vanity, toilet, faucets, vanity lights and exhaust fan, aster bath: replace vanity light & exhaust fan, dry rot repair, repair dry rot in iving room windows 9around windows) | $18,000 |
| Aug 29, 2012 | Completed final sign-off Oct 2012 | 2225 15th St | partial kitchen remodel, full bath remodel at lower level. install kitchen lights. no change in partitionsDetails
partial kitchen remodel, full bath remodel at lower level. install kitchen lights. no change in partitions | $25,000 |
| Feb 15, 2012 | Completed final sign-off May 2012 | 33 Sadowa St | full kitchen remodel, partial bath update, update outlets and lights, no wall change, laundry plumbing @ ground level garage, lighting to comply with cec150(k)Details
full kitchen remodel, partial bath update, update outlets and lights, no wall change, laundry plumbing @ ground level garage, lighting to comply with cec150(k) | $40,000 |
| Jan 30, 2012 | Completed final sign-off Mar 2012 | 2245 Beach St | unit #2: full kitchen remodel, partial bath update, update outlets and lights, new laundry plumbing;no wall changeDetails
unit #2: full kitchen remodel, partial bath update, update outlets and lights, new laundry plumbing;no wall change | $35,000 |
| Dec 23, 2011 | Completed final sign-off Feb 2012 | 615 Burnett Av | remove illegal kitchen at first floor to comply w/ nov#201152128.Details
remove illegal kitchen at first floor to comply w/ nov#201152128. | $12,000 |
| Feb 8, 2011 | Completed final sign-off May 2011 | 57 Parker Av | kitchen remodel, replace appliances, range, microwave, hood, sink, sink faucet, garage disposal, dishwasher, replace 9 lights, replace cabinets, tiling floorDetails
kitchen remodel, replace appliances, range, microwave, hood, sink, sink faucet, garage disposal, dishwasher, replace 9 lights, replace cabinets, tiling floor | $5,000 |
| Jan 18, 2011 | Completed final sign-off Jun 2011 | 866 48th Av | remodeling of sfd; install (n) gas fireplace, remodel (e) kitchen & bath on 2nd. flr. add a (n) bedroom on 1st. flr. legalize & remodel (e) bath on 1st. flr. replace (e) furnace & w/h on 1st.flr. remove (e) plastic cover @ lightwell.Details
remodeling of sfd; install (n) gas fireplace, remodel (e) kitchen & bath on 2nd. flr. add a (n) bedroom on 1st. flr. legalize & remodel (e) bath on 1st. flr. replace (e) furnace & w/h on 1st.flr. remove (e) plastic cover @ lightwell. | $30,000 |
| Jan 7, 2011 | Completed final sign-off Feb 2011 | 20 Dorado Tr | kitchen remodel: replacing countertom and appliances only. no new cabinets. bathroom remodel: new faucet, sink, toulet, wall and floor tiling only. non structural remodel.Details
kitchen remodel: replacing countertom and appliances only. no new cabinets. bathroom remodel: new faucet, sink, toulet, wall and floor tiling only. non structural remodel. | $12,500 |
| Sep 17, 2010 | Completed final sign-off Nov 2010 | 2245 Beach St | #3 - remodel (e) kitchen, replace five ceiling light in bedroom, replace 2-pedestal in existing, 2-bath.Details
#3 - remodel (e) kitchen, replace five ceiling light in bedroom, replace 2-pedestal in existing, 2-bath. | $20,000 |
| Dec 15, 2009 | Completed final sign-off Aug 2010 | 2728 Kirkham St | ground floor: add 3 bedrooms, 2 full baths, add 2 windows side property line. 2nd fl, remodel kitchen, bath, add full bath.Details
ground floor: add 3 bedrooms, 2 full baths, add 2 windows side property line. 2nd fl, remodel kitchen, bath, add full bath. | $50,000 |
| Mar 27, 2008 | Expired or cancelled expired Aug 2017 | 351 29th Av | remodel (e) kitchen & baths. 50% of kitchen watt be of high efficiancy, fluorescent light or o.s. in bath. kitchen: new cabinets, countertops, sink appliances, repair floor or replace with tile. no structural. bath: replace vanity, sink, toilet, repair floor or replace with tile. repair or replaceDetails
remodel (e) kitchen & baths. 50% of kitchen watt be of high efficiancy, fluorescent light or o.s. in bath. kitchen: new cabinets, countertops, sink appliances, repair floor or replace with tile. no structural. bath: replace vanity, sink, toilet, repair floor or replace with tile. repair or replace | $40,000 |
| Nov 14, 2007 | Expired or cancelled cancelled Jan 2010 | 150 Highland Av | 1 kitchen remodel. replace cabinet. no sink. new appliances, sink in seperate room. not part of scope of work.Details
1 kitchen remodel. replace cabinet. no sink. new appliances, sink in seperate room. not part of scope of work. | $3,000 |
| Sep 21, 2007 | Completed final sign-off Nov 2007 | 150 Highland Av | remove illegal kitchen, legalize full bath & storage on ground floor. convert living room to bedroom on second floor per plan.Details
remove illegal kitchen, legalize full bath & storage on ground floor. convert living room to bedroom on second floor per plan. | $9,000 |
| Aug 15, 2007 | Completed final sign-off Nov 2013 | 793 Arguello Bl | major remodel ofmapt#2. kitchen, bathroom, furnace, water heater, sub-panel, window replacement.Details
major remodel ofmapt#2. kitchen, bathroom, furnace, water heater, sub-panel, window replacement. | $120,000 |