Green Metro Inc
- Based in
- Burlingame
- On San Francisco permits
- Dec 2005 to Dec 2023
- Last 24 months
- 0 permits filed
55 permits since 2000: 49 completed, 1 never finaled, 5 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
7 stairs permits: 7 completed. Typically 0 days from filing to permit and 139 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 6, 2021 | Completed final sign-off Feb 2021 | 1677 Dolores St | repair front stair & railing. less than 50%.Details
repair front stair & railing. less than 50%. | $10,000 |
| Sep 24, 2019 | Completed final sign-off Sep 2023 | 1529 Dolores St | revision to app#201712015277 ground floor 1)relocate interior staircase 2)swap family and bedroom location. 3)relocate 3 fixtures bathroom. 2nd floor: 4)swap dining and kitchen location. 3rd floor: 5) reconfigure interior layout per plan.Details
revision to app#201712015277 ground floor 1)relocate interior staircase 2)swap family and bedroom location. 3)relocate 3 fixtures bathroom. 2nd floor: 4)swap dining and kitchen location. 3rd floor: 5) reconfigure interior layout per plan. | $30,000 |
| Dec 1, 2017 | Completed final sign-off Mar 2021 | 1529 Dolores St | add 1 family room, bedroom, mudroom, bathroom, laundry at ground floor.remove(e) deck add (n) deck and patio at rear. new interior stair from ground to 2nd floor. remodel kitchen & powder at 2nd floor. add 1 master bathroom, remodel (e) bathroom at 3rd floor.Details
add 1 family room, bedroom, mudroom, bathroom, laundry at ground floor.remove(e) deck add (n) deck and patio at rear. new interior stair from ground to 2nd floor. remodel kitchen & powder at 2nd floor. add 1 master bathroom, remodel (e) bathroom at 3rd floor. | $250,000 |
| Aug 6, 2014 | Completed final sign-off Dec 2015 | 110 Santa Clara Av | repair the rear stair and upper bedroom balcony. in includes wood dryrot and tile and railing - less than 50% replacementDetails
repair the rear stair and upper bedroom balcony. in includes wood dryrot and tile and railing - less than 50% replacement | $1,000 |
| Dec 20, 2011 | Completed final sign-off Jan 2012 | 1118 Naples St | repair deck & stair in the rear, less than 50% in-kind. repair section of the rotted posts and repair some threads and risers. replace existing railing with same style at 4" o.c.Details
repair deck & stair in the rear, less than 50% in-kind. repair section of the rotted posts and repair some threads and risers. replace existing railing with same style at 4" o.c. | $3,000 |
| May 27, 2009 | Completed final sign-off Oct 2009 | 1459 45th Av | replace rear stairs and landing in kind, modify railing spacing to comply with codeDetails
replace rear stairs and landing in kind, modify railing spacing to comply with code | $10,500 |
| Jan 18, 2008 | Completed final sign-off Feb 2008 | 4238 23rd St | repair stairs that has beetle damages. inside stairs going from living area to ground flr. less than 50%.Details
repair stairs that has beetle damages. inside stairs going from living area to ground flr. less than 50%. | $3,000 |