Block 0918, lot 007
2245 Beach St
- City’s use
- Multi-Family Residential
- Built
- 1928
- Stories
- 3
- Units
- 6
- Rooms
- 12 bathrooms
- Building
- 9,900 sq ft
- Lot
- 4,726 sq ft
- Zoning
- RM2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
12 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 22, 2026 | In progress issued Sep 2026 | 2245 Beach St | Brighter Bay Builders Inc | unit #1 - rehabilitate (e) kitchen in kind. rehabilitate (e) 2 bathrooms in kind, keep tub. install one new washer/dryers, electric, no structural wall demoDetails
unit #1 - rehabilitate (e) kitchen in kind. rehabilitate (e) 2 bathrooms in kind, keep tub. install one new washer/dryers, electric, no structural wall demo | $35,000 |
| Apr 13, 2022 | Never finaled filed Apr 2022, never issued | 2245 Beach St | Robert Hauser Construction | remove & replace (e) balcony railing w/ code compliant railing. (n) deck surface w/ ipe decking material. includes structural enhancements to the (e) structure & waterproofing work.Details
remove & replace (e) balcony railing w/ code compliant railing. (n) deck surface w/ ipe decking material. includes structural enhancements to the (e) structure & waterproofing work. | $5,000 |
| Feb 25, 2022 | Never finaled issued Feb 2022, no final | 2245 Beach St | Star Waterproofing And Roofing | reroofingDetails
reroofing | $3,000 |
| Feb 10, 2022 | Completed final sign-off Mar 2022 | 2245 Beach St | Malagic Construction | unit #2. to comply with nov 202183846. install sheetrock on the residential office ceiling (approx. 180 sqft).Details
unit #2. to comply with nov 202183846. install sheetrock on the residential office ceiling (approx. 180 sqft). | $4,500 |
| Nov 14, 2018 | Never finaled issued Nov 2018, no final | 2245 Beach St | street spaceDetails
street space | ||
| May 23, 2017 | Never finaled issued May 2017, no final | 2245 Beach St | street spaceDetails
street space | ||
| Apr 24, 2017 | Completed final sign-off Jan 2019 | 2245 Beach St | Old Sod Construction Inc | soft story retrofit under sf soft story ordinance.asce 41-13. n/a for maher ordinance no.155-13Details
soft story retrofit under sf soft story ordinance.asce 41-13. n/a for maher ordinance no.155-13 | $40,000 |
| May 20, 2014 | Completed final sign-off Jun 2014 | 2245 Beach St | Green Metro Inc | unit #6:hall bath: replace tub faucet, tub tile, reinstall pedestal and toilet, replace vanity light. no change to tub and walls. master bath:replace pedestal at same location. new vanity light. no change to shower.Details
unit #6:hall bath: replace tub faucet, tub tile, reinstall pedestal and toilet, replace vanity light. no change to tub and walls. master bath:replace pedestal at same location. new vanity light. no change to shower. | $15,000 |
| Jul 17, 2013 | Never finaled issued Jul 2013, no final | 2245 Beach St | street spaceDetails
street space | ||
| Jan 3, 2013 | Completed final sign-off Feb 2013 | 2245 Beach St | Green Metro Inc | kitchen-full remodel, no wall hanges (replace in-kind, same location), half bath - replace wall tile, vanity, toilet, faucets, vanity lights and exhaust fan, aster bath: replace vanity light & exhaust fan, dry rot repair, repair dry rot in iving room windows 9around windows)Details
kitchen-full remodel, no wall hanges (replace in-kind, same location), half bath - replace wall tile, vanity, toilet, faucets, vanity lights and exhaust fan, aster bath: replace vanity light & exhaust fan, dry rot repair, repair dry rot in iving room windows 9around windows) | $18,000 |
| Jan 30, 2012 | Completed final sign-off Mar 2012 | 2245 Beach St | Green Metro Inc | unit #2: full kitchen remodel, partial bath update, update outlets and lights, new laundry plumbing;no wall changeDetails
unit #2: full kitchen remodel, partial bath update, update outlets and lights, new laundry plumbing;no wall change | $35,000 |
| Sep 17, 2010 | Completed final sign-off Nov 2010 | 2245 Beach St | Green Metro Inc | #3 - remodel (e) kitchen, replace five ceiling light in bedroom, replace 2-pedestal in existing, 2-bath.Details
#3 - remodel (e) kitchen, replace five ceiling light in bedroom, replace 2-pedestal in existing, 2-bath. | $20,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.