Gray Industries Inc
- Based in
- San Anselmo
- On San Francisco permits
- Mar 2000 to Apr 2023
- Last 24 months
- 0 permits filed
320 permits since 2000: 267 completed, 23 never finaled, 30 expired or cancelled.
Of the 23 never-finaled permits, 5 are 5 to 10 years old, 18 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
22 deck permits: 18 completed, 1 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 72 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 29, 2019 | Completed final sign-off Aug 2019 | 636 Presidio Av | remove & replace 2 partition walls at deck. remove & replace cantilivered joists due to dryrot at ends like for like. less than 10%Details
remove & replace 2 partition walls at deck. remove & replace cantilivered joists due to dryrot at ends like for like. less than 10% | $25,000 |
| May 9, 2019 | Completed final sign-off Oct 2019 | 34 Rico Wy | expand kitchen and dining room openings and to comply with complaint #201928455. replace rotted deck boards, lower hearth. n/a for maherDetails
expand kitchen and dining room openings and to comply with complaint #201928455. replace rotted deck boards, lower hearth. n/a for maher | $9,500 |
| Jan 25, 2019 | Completed final sign-off Jun 2019 | 2532 Sutter St | apt a: to comply with nov #201814741 and nov #201918712. fix hardwood flooring. fix heater, fix vent screen, fix stair threads & handrails. fix deck board, fix vent, fix electrical conduit.Details
apt a: to comply with nov #201814741 and nov #201918712. fix hardwood flooring. fix heater, fix vent screen, fix stair threads & handrails. fix deck board, fix vent, fix electrical conduit. | $9,000 |
| Nov 16, 2018 | Completed final sign-off Jan 2019 | 935 Pine St | revision 201810032124 change rear deckDetails
revision 201810032124 change rear deck | |
| Oct 3, 2018 | Completed final sign-off Jan 2019 | 935 Pine St | comply w/ n.o.v 201888181. remove and replace deck, to use all heart redwoodDetails
comply w/ n.o.v 201888181. remove and replace deck, to use all heart redwood | $12,500 |
| Oct 27, 2017 | Expired or cancelled cancelled Aug 2021 | 508 Clayton St | construct upper deck and staircase to backyardDetails
construct upper deck and staircase to backyard | $32,000 |
| Mar 30, 2015 | Completed final sign-off Aug 2015 | 510 Clayton St | remove & replace rotted deck and support structure - like for likeDetails
remove & replace rotted deck and support structure - like for like | $95,000 |
| Jul 22, 2013 | Completed final sign-off Sep 2013 | 1160 Greenwich St | repair existing and replace with code complaint railing at living room, repair deck at 4" h & max 3.75 inches on center. this is a repair of less than 50%l. comply with cbc 1013 guard requirements.Details
repair existing and replace with code complaint railing at living room, repair deck at 4" h & max 3.75 inches on center. this is a repair of less than 50%l. comply with cbc 1013 guard requirements. | $10,890 |
| Jan 20, 2012 | Completed final sign-off Mar 2012 | 428 Gold Mine Dr | remove portion of wall in kitchen to open view. replace deck railing, change electrical service panel, change entire tiles, install skylights in master bedroom.Details
remove portion of wall in kitchen to open view. replace deck railing, change electrical service panel, change entire tiles, install skylights in master bedroom. | $25,000 |
| Dec 16, 2008 | Completed final sign-off Dec 2008 | 1279 03rd Av | remove & replace 2 deck ledgers w/space for water flow. replace 2 stairs posts, install handrail replace 2 rotted support posts, repair railing all work less than 50% repair in kind.Details
remove & replace 2 deck ledgers w/space for water flow. replace 2 stairs posts, install handrail replace 2 rotted support posts, repair railing all work less than 50% repair in kind. | $3,200 |
| Jan 16, 2008 | Completed final sign-off May 2008 | 818 Fell St | remove and replace kitchen cabinets, appliances, replace existing in kind door to deck, remove pocket doors between dining room and living room, repair roof at bathroom, new shower stall and vanity,50 % of wattage of kitchen lighting to be fluorescent. bathroom lighting to be fluorescent or on occuDetails
remove and replace kitchen cabinets, appliances, replace existing in kind door to deck, remove pocket doors between dining room and living room, repair roof at bathroom, new shower stall and vanity,50 % of wattage of kitchen lighting to be fluorescent. bathroom lighting to be fluorescent or on occu | $67,000 |
| Mar 27, 2007 | Completed final sign-off Jul 2007 | 233 10th Av | install old deck and (e) spiral staircase to rear of home. replace in kind.Details
install old deck and (e) spiral staircase to rear of home. replace in kind. | $15,000 |
| Mar 13, 2007 | Completed final sign-off Mar 2007 | 1325 Greenwich St | install new deck membrane over lowest unit, replace dry rotted plywoodDetails
install new deck membrane over lowest unit, replace dry rotted plywood | $10,000 |
| Oct 25, 2006 | Completed final sign-off Dec 2006 | 500 09th Av | repair stringer support to top floor stair tread to intermediate landing leading to top floor and decking at top floor landing to comply with nov #200676731-#3Details
repair stringer support to top floor stair tread to intermediate landing leading to top floor and decking at top floor landing to comply with nov #200676731-#3 | $1,000 |
| Oct 19, 2006 | Completed final sign-off Nov 2006 | 101 Prospect Av | construct solid railing 36" at open deck at center front of building on both deck. in place of metal rail. 3 ft section.Details
construct solid railing 36" at open deck at center front of building on both deck. in place of metal rail. 3 ft section. | $200 |
| Jun 19, 2006 | Completed final sign-off Aug 2006 | 1624 Vallejo St | remove and replace rotted stringers, treads and risers on lower portion of staircase, replace rim joists at 1st landing, replace same deck boards at 1st landing.Details
remove and replace rotted stringers, treads and risers on lower portion of staircase, replace rim joists at 1st landing, replace same deck boards at 1st landing. | $12,000 |
| Feb 15, 2006 | Completed final sign-off Apr 2007 | 1735 41st Av | add a room to back of house with a deck above.Details
add a room to back of house with a deck above. | $30,000 |
| Nov 2, 2005 | Expired or cancelled expired May 2006 | 1967 Pine St | revision to 200510266554 to rebuild rear deck joists and repair shear wallDetails
revision to 200510266554 to rebuild rear deck joists and repair shear wall | $4,000 |
| Oct 26, 2005 | Expired or cancelled expired May 2006 | 1967 Pine St | remove and replace siding on back of bldg with hardi siding/repair deck at 1st level less than 50% at deckDetails
remove and replace siding on back of bldg with hardi siding/repair deck at 1st level less than 50% at deck | $25,000 |
| Aug 5, 2005 | Completed final sign-off Sep 2005 | 4818 25th St | remove replace deck membrane & hard siding inside parapet wallDetails
remove replace deck membrane & hard siding inside parapet wall | $9,000 |
| Nov 5, 2003 | Completed final sign-off Mar 2004 | 370 Fair Oaks St | remove/replace cedar shingles on north & east side of garage/entry.install new deck railing toDetails
remove/replace cedar shingles on north & east side of garage/entry.install new deck railing to | $7,500 |
| Aug 15, 2003 | Never finaled issued Aug 2003, no final | 272 Douglass St | deck and stair repair/remove & replaceDetails
deck and stair repair/remove & replace | $5,790 |