Gray Industries Inc
- Based in
- San Anselmo
- On San Francisco permits
- Mar 2000 to Apr 2023
- Last 24 months
- 0 permits filed
320 permits since 2000: 267 completed, 23 never finaled, 30 expired or cancelled.
Of the 23 never-finaled permits, 5 are 5 to 10 years old, 18 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
4 roof deck permits: 3 completed, 1 never finaled. Typically 176 days from filing to permit and 232 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 15, 2017 | Never finaled issued Apr 2018, no final | 2426 Pine St | new 130 sq.ft. dormer to enlarge 3rd floor exercise room & provide new storage closet for roof deck. new 545 sq.ft. roof deck.Details
new 130 sq.ft. dormer to enlarge 3rd floor exercise room & provide new storage closet for roof deck. new 545 sq.ft. roof deck. | $90,000 |
| Dec 26, 2012 | Completed final sign-off Jan 2013 | 1818 Broadway | replace existing rotted roof deck surfaze with new azec decking common area no structural work, not visible from the street.Details
replace existing rotted roof deck surfaze with new azec decking common area no structural work, not visible from the street. | $16,000 |
| Feb 19, 2008 | Completed final sign-off Oct 2008 | 1930 California St | renovation on lower unit: kitchen, bathroom, add stair to ground floor, add bedroom and full bathroom to ground floor. upper unit: renovation of kitchen & 2 bathrooms, add stairs to new roof deck & add 2 new skylights.Details
renovation on lower unit: kitchen, bathroom, add stair to ground floor, add bedroom and full bathroom to ground floor. upper unit: renovation of kitchen & 2 bathrooms, add stairs to new roof deck & add 2 new skylights. | $75,000 |
| Jul 2, 2004 | Completed final sign-off Feb 2007 | 3555 Divisadero St | re-construct of a rooftop deck 400 sq ft in area. access being a pre existing re-built staircase add railings being "clear view" cable rails with 4 x 4 posts 8' on center repair of first two stories of stairs will also be addressed.Details
re-construct of a rooftop deck 400 sq ft in area. access being a pre existing re-built staircase add railings being "clear view" cable rails with 4 x 4 posts 8' on center repair of first two stories of stairs will also be addressed. | $2,000 |