Back to bathroom remodel contractors
Gray Industries Inc
- Based in
- San Anselmo
- On San Francisco permits
- Mar 2000 to Apr 2023
- Last 24 months
- 0 permits filed
320 permits since 2000: 267 completed, 23 never finaled, 30 expired or cancelled.
Of the 23 never-finaled permits, 5 are 5 to 10 years old, 18 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
64 bathroom remodel permits: 56 completed, 2 never finaled, 6 expired or cancelled. Typically 0 days from filing to permit and 125 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 3, 2022 | Completed final sign-off Dec 2023 | 70 Clifford Tr | small one bathroom remodel, like for like. shower, toilet, vanity.non structuralDetails
small one bathroom remodel, like for like. shower, toilet, vanity.non structural | $17,500 |
| Dec 6, 2021 | Completed final sign-off Jun 2022 | 70 Clifford Tr | kitchen and bathroom renovation. no moving walls.Details
kitchen and bathroom renovation. no moving walls. | $60,000 |
| Aug 10, 2021 | Completed final sign-off Feb 2022 | 2522 Chestnut St | 2nd fl bathroom alteration.Details
2nd fl bathroom alteration. | $15,000 |
| Mar 2, 2020 | Completed final sign-off Oct 2020 | 2772 Greenwich St | remove and replace kitchen cabinets, install new plumbing plumbing fixtures, install new appliances, install new bathroom vanity, refinish hardwood floors, paint entire unitDetails
remove and replace kitchen cabinets, install new plumbing plumbing fixtures, install new appliances, install new bathroom vanity, refinish hardwood floors, paint entire unit | $40,000 |
| Jun 24, 2019 | Completed final sign-off Oct 2019 | 34 Rico Wy | obtain permit for existing kitchena and bathroom remodel. existing gas fireplace in living room, direct vent. revise pa# 201905090259 cost.Details
obtain permit for existing kitchena and bathroom remodel. existing gas fireplace in living room, direct vent. revise pa# 201905090259 cost. | $49,000 |
| May 14, 2019 | Completed final sign-off Jun 2019 | 1921 Jefferson St | #101: install new floor heat mats under new engineered flooring in living room and 2 bedrooms, tile kitchen floor, remove and replace master bath vanity and fixture. retile kitchen backsplash, remove old wall heaters and patch walls, remove & replace baseboards.Details
#101: install new floor heat mats under new engineered flooring in living room and 2 bedrooms, tile kitchen floor, remove and replace master bath vanity and fixture. retile kitchen backsplash, remove old wall heaters and patch walls, remove & replace baseboards. | $23,000 |
| Feb 15, 2019 | Completed final sign-off Jun 2019 | 2100 Pacific Av | remove non structural portions of 4 walls, install laundry rm. replace tile fls. in master & guest bathrooms, install new lighting througout unit remodel powder room, install double pane like for like windows in 3 bedrooms.Details
remove non structural portions of 4 walls, install laundry rm. replace tile fls. in master & guest bathrooms, install new lighting througout unit remodel powder room, install double pane like for like windows in 3 bedrooms. | $135,000 |
| Dec 27, 2018 | Completed final sign-off May 2019 | 818 Fell St | guest bathroom remodel, remove & replace tuv, vanity, tile & plumbing fictures. change window in bathroom to same size insulated (not visible from st - in lightell) change ceiling lights in kitchen. no structural work.Details
guest bathroom remodel, remove & replace tuv, vanity, tile & plumbing fictures. change window in bathroom to same size insulated (not visible from st - in lightell) change ceiling lights in kitchen. no structural work. | $38,000 |
| Sep 5, 2018 | Completed final sign-off Mar 2019 | 3367 Washington St | 201809119637project proposes the renovation of (e) bath on 4th fl, vaulting on (e) attic ceiling, and 1 (n) skylight along with minor cosmetic updates throughoutDetails
201809119637project proposes the renovation of (e) bath on 4th fl, vaulting on (e) attic ceiling, and 1 (n) skylight along with minor cosmetic updates throughout | $55,000 |
| Sep 4, 2018 | Completed final sign-off Oct 2018 | 1173 Filbert St | increase scope of work on application #201808167609 to include new tile in guest & floor, new vanity in guest bathroom, new arrowood in kitchen, construction closets in front room, new tile floor in master bath.Details
increase scope of work on application #201808167609 to include new tile in guest & floor, new vanity in guest bathroom, new arrowood in kitchen, construction closets in front room, new tile floor in master bath. | $22,000 |
| Aug 16, 2018 | Completed final sign-off Oct 2018 | 1173 Filbert St | remove and replace master bath vanityDetails
remove and replace master bath vanity | $2,400 |
| Jul 24, 2018 | Completed final sign-off Nov 2018 | 2165 Beach St | paint kitchen cabinets, remove and replace countertops in kitchen and guest baht, remove and replace bathtub, vanity, toilet, medicine cabinet, retile tub/shower surroud, new shower and vanity fixtures. no structural work. (1 kitchen, 2 bath remodel)Details
paint kitchen cabinets, remove and replace countertops in kitchen and guest baht, remove and replace bathtub, vanity, toilet, medicine cabinet, retile tub/shower surroud, new shower and vanity fixtures. no structural work. (1 kitchen, 2 bath remodel) | $41,000 |
| Nov 28, 2017 | Completed final sign-off Feb 2019 | 654 33rd Av | 3rd flr: add bathroom, move washer/dryer. 2nd flr: reconfigure (e) bathrrom garage: no work. remodel 2 kitchens no structural workDetails
3rd flr: add bathroom, move washer/dryer. 2nd flr: reconfigure (e) bathrrom garage: no work. remodel 2 kitchens no structural work | $68,000 |
| Mar 13, 2017 | Completed final sign-off Aug 2017 | 2426 Pine St | remodel (e) bathroom, change entry to bedroom. no structural workDetails
remodel (e) bathroom, change entry to bedroom. no structural work | $35,000 |
| Sep 28, 2016 | Completed final sign-off Dec 2016 | 1242 Francisco St | install washer dryer in bathroom, new shower valve and tile, new sink, new tile floor, install new engineered floor in unit, paint entire unitDetails
install washer dryer in bathroom, new shower valve and tile, new sink, new tile floor, install new engineered floor in unit, paint entire unit | $16,000 |
| Aug 9, 2016 | Completed final sign-off Oct 2016 | 1309 Francisco St | remove & replace kitchen cabinets, install new counter tops, prime & paint entire kitchen. remove & replace tub/shower tile, install new vanity and toilet, prime & paint entire bathroom.Details
remove & replace kitchen cabinets, install new counter tops, prime & paint entire kitchen. remove & replace tub/shower tile, install new vanity and toilet, prime & paint entire bathroom. | $25,000 |
| Apr 19, 2016 | Completed final sign-off Dec 2017 | 3254 Clay St | remove & replace kitchen & bathroom ceiling for elelctrical work. prime & paint to match existing.Details
remove & replace kitchen & bathroom ceiling for elelctrical work. prime & paint to match existing. | $2,300 |
| Aug 10, 2015 | Completed final sign-off Oct 2015 | 747 Lyon St | remove and replace tub and tiel around tub. repaint bathroom, in kind.Details
remove and replace tub and tiel around tub. repaint bathroom, in kind. | $9,000 |
| Feb 10, 2015 | Completed final sign-off Mar 2015 | 747 Lyon St | #6: bathroom remodel - new tub/shower tile, new tub, new toilet, new vanity, new floor tile, existing fan to remain. prime & paint. no walls moved, removed or added. all layouts as remain unchanged.Details
#6: bathroom remodel - new tub/shower tile, new tub, new toilet, new vanity, new floor tile, existing fan to remain. prime & paint. no walls moved, removed or added. all layouts as remain unchanged. | $16,000 |
| Oct 3, 2014 | Completed final sign-off Jan 2015 | 747 Lyon St | unit 5: remove and replace bath tub, remove and replace tub surround tile and floor tile, install heat mat. prime and paint bath unit 5 onlyDetails
unit 5: remove and replace bath tub, remove and replace tub surround tile and floor tile, install heat mat. prime and paint bath unit 5 only | $11,000 |
| Jul 2, 2014 | Completed final sign-off May 2017 | 1340 Mcallister St | comply with physical inspection report #cc7478 remove sink and shower @ basement level (1st floor) remove bathroom and kitchen @ top level (4th floor)Details
comply with physical inspection report #cc7478 remove sink and shower @ basement level (1st floor) remove bathroom and kitchen @ top level (4th floor) | $30,000 |
| Jun 20, 2014 | Completed final sign-off Dec 2014 | 879 Alabama St | remodel studio area to include new bathroom, open non structural wall.Details
remodel studio area to include new bathroom, open non structural wall. | $14,000 |
| May 28, 2014 | Never finaled issued Dec 2014, no final | 655 Ellis St | convert business office former guest room) back to guest room. add bathroom and partitions on 2nd floor. n/a for the maher ordinance #155-13. total number of guest rooms are 100.Details
convert business office former guest room) back to guest room. add bathroom and partitions on 2nd floor. n/a for the maher ordinance #155-13. total number of guest rooms are 100. | $5,000 |
| Feb 3, 2014 | Completed final sign-off Feb 2015 | 1506 Jackson St | revision to app#201208177637. relocate kitchen and bath on 1st, second and third floors. add bath on 2nd floor. second floor new storageDetails
revision to app#201208177637. relocate kitchen and bath on 1st, second and third floors. add bath on 2nd floor. second floor new storage | $5,000 |
| Aug 8, 2013 | Completed final sign-off Nov 2013 | 2367 Bush St | master bath & guest bath: remove & replace shower tile, valve & drain line, floor tile, vanity, sinks & faucets, install new fan. w.c.: remvoe & replace floor tile, prime & paint all 3 rooms, no structure.Details
master bath & guest bath: remove & replace shower tile, valve & drain line, floor tile, vanity, sinks & faucets, install new fan. w.c.: remvoe & replace floor tile, prime & paint all 3 rooms, no structure. | $67,000 |
| Jul 22, 2013 | Completed final sign-off Sep 2013 | 1201 06th Av | remove and replace kitchen counter top, repair cabinets, rmeove and replace bath vanity. instal new bathroom linoleum, patch and paint entire apt. refinish all hardwood floors.Details
remove and replace kitchen counter top, repair cabinets, rmeove and replace bath vanity. instal new bathroom linoleum, patch and paint entire apt. refinish all hardwood floors. | $9,000 |
| Feb 13, 2013 | Completed final sign-off Jun 2013 | 2554 Sacramento St | unit #4: remove & repl bathroom tub, tub/shower valve, toilet, vanity, faucet, install heated tile floor, install new furnace; install new tankless water heater, prime & paint bathrm, 1 bathrm & 1 unitDetails
unit #4: remove & repl bathroom tub, tub/shower valve, toilet, vanity, faucet, install heated tile floor, install new furnace; install new tankless water heater, prime & paint bathrm, 1 bathrm & 1 unit | $28,000 |
| Dec 26, 2012 | Completed final sign-off Mar 2013 | 1201 06th Av | unit #1:bathroom remodel:remove and replace toilet, vanity and tub/shower tile surround, new linoleum. patch walls throughout unit and paint entire unit. refinish hardwood floors. no new lightwell under this permit.Details
unit #1:bathroom remodel:remove and replace toilet, vanity and tub/shower tile surround, new linoleum. patch walls throughout unit and paint entire unit. refinish hardwood floors. no new lightwell under this permit. | $14,500 |
| Dec 19, 2012 | Completed final sign-off Mar 2014 | 542 Moraga St | convert (e) ground floor living space to dwelling unit. add kitchen, relocate bath, replace 2 windows at rear yard at 2nd floor, renovate (e) bath, replace 2 windows, place washer/dryer in closet. add window in light well.Details
convert (e) ground floor living space to dwelling unit. add kitchen, relocate bath, replace 2 windows at rear yard at 2nd floor, renovate (e) bath, replace 2 windows, place washer/dryer in closet. add window in light well. | $62,000 |
| Nov 29, 2012 | Completed final sign-off Jan 2013 | 2542 Sacramento St | remove & repair shower valve, tile & door, install new vanity & faucet, new vent fan, accessories & prime. paint entire bathroom.Details
remove & repair shower valve, tile & door, install new vanity & faucet, new vent fan, accessories & prime. paint entire bathroom. | $12,000 |
| Oct 18, 2012 | Completed final sign-off Jul 2013 | 1753 Greenwich St | remove an replace kitchen cabinets & appliances, install new kitchen floor, remove and replace shower tile & door in bathroom, remove & replace vanity & toilet,(loflo) in bathroomDetails
remove an replace kitchen cabinets & appliances, install new kitchen floor, remove and replace shower tile & door in bathroom, remove & replace vanity & toilet,(loflo) in bathroom | $25,000 |
| Mar 3, 2009 | Completed final sign-off Apr 2009 | 21 Wright St | create office/bathroom in garage area.Details
create office/bathroom in garage area. | $23,000 |
| Dec 5, 2008 | Completed final sign-off Jan 2009 | 3553 Scott St | reconfigure master bathroom, change entrance to guest bedroom & master bedroom. no structural, work on 2nd floor.Details
reconfigure master bathroom, change entrance to guest bedroom & master bedroom. no structural, work on 2nd floor. | $25,000 |
| Aug 28, 2008 | Completed final sign-off Oct 2009 | 34 Varennes St | relocate and remove kitchen and bathDetails
relocate and remove kitchen and bath | $42,000 |
| Aug 28, 2008 | Expired or cancelled expired Jan 2010 | 32 Varennes St | relocate and remodel kitchen and bathroom on 1/fDetails
relocate and remodel kitchen and bathroom on 1/f | $42,000 |
| Aug 28, 2008 | Completed final sign-off Oct 2009 | 40 Varennes St | #40a- remodel kitchen, bathroom relocation & remodel on 3rd floorDetails
#40a- remodel kitchen, bathroom relocation & remodel on 3rd floor | $42,000 |
| Jul 31, 2008 | Completed final sign-off Nov 2008 | 64 Cervantes Bl | work @ unit# 66 only. remove & replace shower pan & tile in shower. remove & replace toilet. remove & replace vanity bathroom # 1. remove & replace tub / shower, tub & tile, vanity & toilet bathroom# 2. remove & replace kitchen cabinets & appliances.Details
work @ unit# 66 only. remove & replace shower pan & tile in shower. remove & replace toilet. remove & replace vanity bathroom # 1. remove & replace tub / shower, tub & tile, vanity & toilet bathroom# 2. remove & replace kitchen cabinets & appliances. | $65,000 |
| Feb 19, 2008 | Completed final sign-off Oct 2008 | 1930 California St | renovation on lower unit: kitchen, bathroom, add stair to ground floor, add bedroom and full bathroom to ground floor. upper unit: renovation of kitchen & 2 bathrooms, add stairs to new roof deck & add 2 new skylights.Details
renovation on lower unit: kitchen, bathroom, add stair to ground floor, add bedroom and full bathroom to ground floor. upper unit: renovation of kitchen & 2 bathrooms, add stairs to new roof deck & add 2 new skylights. | $75,000 |
| Feb 1, 2008 | Completed final sign-off Mar 2008 | 1310 Fillmore St | work @ unit# 901 only: remove tub-tile in bathroom, replace valve level install new pan & tile, change switch type for lights.Details
work @ unit# 901 only: remove tub-tile in bathroom, replace valve level install new pan & tile, change switch type for lights. | $2,300 |
| Jan 16, 2008 | Completed final sign-off May 2008 | 818 Fell St | remove and replace kitchen cabinets, appliances, replace existing in kind door to deck, remove pocket doors between dining room and living room, repair roof at bathroom, new shower stall and vanity,50 % of wattage of kitchen lighting to be fluorescent. bathroom lighting to be fluorescent or on occuDetails
remove and replace kitchen cabinets, appliances, replace existing in kind door to deck, remove pocket doors between dining room and living room, repair roof at bathroom, new shower stall and vanity,50 % of wattage of kitchen lighting to be fluorescent. bathroom lighting to be fluorescent or on occu | $67,000 |
| Jun 25, 2007 | Completed final sign-off Jul 2007 | 1246 Fell St | remodel bathroom & kitchen for both units. no structural changes. lighting 50% flourescent.Details
remodel bathroom & kitchen for both units. no structural changes. lighting 50% flourescent. | $50,000 |
| Feb 26, 2007 | Completed final sign-off Jun 2007 | 2101 Baker St | work @ unit# 1 only. 1 bath. remove & replace tub / shower tile, tub, vanity toilet & lights prime & paint. tile floor, install pocket door. no structural work.Details
work @ unit# 1 only. 1 bath. remove & replace tub / shower tile, tub, vanity toilet & lights prime & paint. tile floor, install pocket door. no structural work. | $10,500 |
| Feb 16, 2007 | Expired or cancelled cancelled Aug 2021 | 1558 24th Av | remodel basement area, new bedroom, new bath,m new laundry room and garage (22' x 17') @ utility, new storageDetails
remodel basement area, new bedroom, new bath,m new laundry room and garage (22' x 17') @ utility, new storage | $35,000 |
| Nov 14, 2006 | Completed final sign-off Jul 2007 | 233 10th Av | remove & replace shower pan & tile. remove & replace vanity & toilet. complete paint of bathroom (1 bathroom only) no change in lighting plan.Details
remove & replace shower pan & tile. remove & replace vanity & toilet. complete paint of bathroom (1 bathroom only) no change in lighting plan. | $7,000 |
| Nov 14, 2006 | Completed final sign-off Sep 2007 | 943 Stanyan St | remodel bathrooms and kitchens in 943 #1 & 2 and 945 # 2 & 4. complete repaint of entire units and new flooring per plans. no change of windows or egress doorsDetails
remodel bathrooms and kitchens in 943 #1 & 2 and 945 # 2 & 4. complete repaint of entire units and new flooring per plans. no change of windows or egress doors | $160,000 |
| Nov 7, 2006 | Completed final sign-off May 2007 | 286 30th Av | remove & replace kitchen cabinets, apliances, flooring and complete repaint, remove and replace (3) bathroom vanities, (3) toilets, (2) tile shower stalls and tile 2 floors, completly repaints (3) bathrooms. no structural work.Details
remove & replace kitchen cabinets, apliances, flooring and complete repaint, remove and replace (3) bathroom vanities, (3) toilets, (2) tile shower stalls and tile 2 floors, completly repaints (3) bathrooms. no structural work. | $73,000 |
| Aug 31, 2006 | Completed final sign-off Jul 2007 | 233 10th Av | non structural remodel of legal basement unit, new kitchen and bathrooms and partition walls.Details
non structural remodel of legal basement unit, new kitchen and bathrooms and partition walls. | $80,000 |
| Aug 1, 2006 | Expired or cancelled expired Jan 2008 | 559 Fell St | install sheetrock and new 1/2 bathroom to area under main house in basement areaDetails
install sheetrock and new 1/2 bathroom to area under main house in basement area | $20,000 |
| Mar 16, 2006 | Expired or cancelled expired Jun 2014 | 2201 Sacramento St | remove and replace vanity, toilet and tub/shower tile, new value in shower-guess bathroom remove and replace vanity toilet and shower tile and value in master bathroom. no structural work.Details
remove and replace vanity, toilet and tub/shower tile, new value in shower-guess bathroom remove and replace vanity toilet and shower tile and value in master bathroom. no structural work. | $21,000 |
| Mar 1, 2006 | Completed final sign-off Jul 2006 | 2260 North Point St | remove & replace kchn cbnts & appliances, new granite counter tops/remove and replace guest bath room shower tile and valve, remove and replace toilet and vanity/remove & replace master bath shower tile & valve/remove and replace toilet & vanity/paint entire unit/refinish floors/no structural workDetails
remove & replace kchn cbnts & appliances, new granite counter tops/remove and replace guest bath room shower tile and valve, remove and replace toilet and vanity/remove & replace master bath shower tile & valve/remove and replace toilet & vanity/paint entire unit/refinish floors/no structural work | $94,500 |
| Feb 13, 2006 | Expired or cancelled expired May 2007 | 1306 06th Av | final inspection for bathroom remodel, per 3r report no. 3999 ap 1306 item no. 9 onlyDetails
final inspection for bathroom remodel, per 3r report no. 3999 ap 1306 item no. 9 only | |
| Jan 19, 2006 | Completed final sign-off Apr 2006 | 2383 Greenwich St | remove &replace bathtub tile, vanity and lights in bathroom. 1 bath remodel non structural.(interior work only)Details
remove &replace bathtub tile, vanity and lights in bathroom. 1 bath remodel non structural.(interior work only) | $11,800 |
| Mar 16, 2005 | Completed final sign-off Oct 2005 | 359 Moultrie St | remodel bathroom on 2nd floor.Details
remodel bathroom on 2nd floor. | $17,000 |
| Dec 14, 2004 | Expired or cancelled expired Mar 2006 | 2829 Steiner St | unit #3 - remodel 2 bathrooms, no structural workDetails
unit #3 - remodel 2 bathrooms, no structural work | $21,000 |
| Dec 14, 2004 | Completed final sign-off May 2005 | 2200 Sacramento St | unit #202 - remodel kitchen and 2 bathrooms. no structural workDetails
unit #202 - remodel kitchen and 2 bathrooms. no structural work | $97,000 |
| Mar 31, 2004 | Completed final sign-off Jun 2004 | 3889 25th St | install new toilet,shower,vanity & pocket door in bath,install lighting,pocket door in non bearingDetails
install new toilet,shower,vanity & pocket door in bath,install lighting,pocket door in non bearing | $8,300 |
| Dec 9, 2003 | Completed final sign-off Mar 2004 | 2341 North Point St | work only in 2343- remove & replace tile around tub in bathroom. install new toilet & sinkDetails
work only in 2343- remove & replace tile around tub in bathroom. install new toilet & sink | $35,000 |
| Sep 3, 2003 | Completed final sign-off Oct 2004 | 1624 Vallejo St | remodel kitchen (new cabinets & appliances)remodel bathrm (new shower stall,new vanity,steam bath &Details
remodel kitchen (new cabinets & appliances)remodel bathrm (new shower stall,new vanity,steam bath & | $40,000 |
| Aug 14, 2003 | Completed final sign-off Sep 2003 | 846 26th Av | remove & replace tile,shower valve & shower pan in bathroom.Details
remove & replace tile,shower valve & shower pan in bathroom. | $3,800 |
| Apr 28, 2003 | Completed final sign-off Jul 2003 | 2423 Buchanan St | bathroom install new shower pan & stall. new pedital sink and new toilet. expand size of bedroomDetails
bathroom install new shower pan & stall. new pedital sink and new toilet. expand size of bedroom | $11,000 |
| Jan 7, 2003 | Completed final sign-off May 2003 | 2944 Baker St | remodel kitchen bathroom and laundry room move window in kitchen to corner on sink installDetails
remodel kitchen bathroom and laundry room move window in kitchen to corner on sink install | $55,000 |
| Aug 13, 2002 | Completed final sign-off Jan 2003 | 400 38th Av | remodel bathroomDetails
remodel bathroom | $8,000 |
| Jun 14, 2002 | Never finaled issued Jun 2002, no final | 3838 Divisadero St | demo bathrooms and kitchen for remodel, open ceilings for engineer,open walls < 25% total surface fiDetails
demo bathrooms and kitchen for remodel, open ceilings for engineer,open walls < 25% total surface fi | $8,000 |
| May 4, 2000 | Completed final sign-off Oct 2000 | 2243 Bay St | remove & replace kitichen cabinets & floor, tile in bathroomDetails
remove & replace kitichen cabinets & floor, tile in bathroom | $25,000 |