Block 1159, lot 001
747 Lyon St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
16 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 10, 2015 | Completed final sign-off Mar 2015 | 747 Lyon St | Gray Industries Inc | #6: bathroom remodel - new tub/shower tile, new tub, new toilet, new vanity, new floor tile, existing fan to remain. prime & paint. no walls moved, removed or added. all layouts as remain unchanged.Details
#6: bathroom remodel - new tub/shower tile, new tub, new toilet, new vanity, new floor tile, existing fan to remain. prime & paint. no walls moved, removed or added. all layouts as remain unchanged. | $16,000 |
| Nov 4, 2014 | Completed final sign-off Jan 2015 | 747 Lyon St | Gray Industries Inc | unit 3: remove tub and surrounding tile, install new tub and tile surround, install fan, install 2 recessed lights.Details
unit 3: remove tub and surrounding tile, install new tub and tile surround, install fan, install 2 recessed lights. | $13,000 |
| Oct 3, 2014 | Completed final sign-off Jan 2015 | 747 Lyon St | Gray Industries Inc | unit 5: remove and replace bath tub, remove and replace tub surround tile and floor tile, install heat mat. prime and paint bath unit 5 onlyDetails
unit 5: remove and replace bath tub, remove and replace tub surround tile and floor tile, install heat mat. prime and paint bath unit 5 only | $11,000 |
| Sep 18, 2014 | Completed final sign-off Nov 2014 | 747 Lyon St | Jjj & K Inc./Dba: Alexander Company | replace 9 windows with marvin wood clad windows (visible from the street) and 2 windows(not visible from the street). 11 total replacementDetails
replace 9 windows with marvin wood clad windows (visible from the street) and 2 windows(not visible from the street). 11 total replacement | $12,000 |
| Mar 25, 2014 | Completed final sign-off Apr 2014 | 747 Lyon St | Gray Industries Inc | to comply with physical inspection report #cc-7440Details
to comply with physical inspection report #cc-7440 | $4,000 |
| Aug 14, 2013 | Never finaled issued Aug 2013, no final | 747 Lyon St | street spaceDetails
street space | ||
| May 10, 2011 | Completed final sign-off May 2011 | 747 Lyon St | Goodman Construction & Design Co | change 18 windows in front, change 6 windows in rear, front windows are aluminum clad wood hung with ogee lags. rear will be vinyl. u=0.40.Details
change 18 windows in front, change 6 windows in rear, front windows are aluminum clad wood hung with ogee lags. rear will be vinyl. u=0.40. | $18,000 |
| May 21, 2007 | Completed final sign-off Jun 2007 | 747 Lyon St | Busler Construction Inc. | unit #1 & #5- add gas central heat units, 45,000 btu.Details
unit #1 & #5- add gas central heat units, 45,000 btu. | $4,000 |
| May 21, 2007 | Completed final sign-off Jun 2007 | 747 Lyon St | Busler Construction Inc. | unit #1, #5 & #6- remodel 3 kitchens, 3 baths. bring plumbing & electrical to code.Details
unit #1, #5 & #6- remodel 3 kitchens, 3 baths. bring plumbing & electrical to code. | $45,000 |
| Apr 3, 2007 | Never finaled issued Apr 2007, no final | 747 Lyon St | street spaceDetails
street space | ||
| Mar 8, 2007 | Completed final sign-off Jun 2007 | 747 Lyon St | Busler Construction Inc. | replace siding because of rought replace (6) leaking aluminum windows with new vinyly windows side to match existing at rear.Details
replace siding because of rought replace (6) leaking aluminum windows with new vinyly windows side to match existing at rear. | $3,000 |
| Oct 2, 2006 | Completed final sign-off Jul 2007 | 747 Lyon St | Busler Construction Inc. | remodel 2 kitchens & 2 baths. bring plumbing & electrical to code thru out unit# 3 & unit# 4.Details
remodel 2 kitchens & 2 baths. bring plumbing & electrical to code thru out unit# 3 & unit# 4. | $30,000 |
| Apr 11, 2006 | Completed final sign-off Jul 2007 | 747 Lyon St | replace kitchen cabinets, bring electric & plumbing to code, new hood vent, replace bathroom tile and install new vanity.Details
replace kitchen cabinets, bring electric & plumbing to code, new hood vent, replace bathroom tile and install new vanity. | $10,000 | |
| Apr 21, 2004 | Never finaled issued Apr 2004, no final | 747 Lyon St | sidewalk onlyDetails
sidewalk only | ||
| Jun 19, 2001 | Expired or cancelled expired Dec 2001 | 747 Lyon St | street spaceDetails
street space | ||
| Apr 23, 2001 | Completed final sign-off Jun 2001 | 747 Lyon St | R H Nisthal Paint Company | back stairs steps replace about 8 steps.Details
back stairs steps replace about 8 steps. | $800 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Busler Construction Inc. (4), Gray Industries Inc (4), Goodman Construction & Design Co, Jjj & K Inc./Dba: Alexander Company, R H Nisthal Paint Company
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.