Block 1423, lot 009
233 10th Av
- City’s use
- Multi-Family Residential
- Built
- 1900
- Stories
- 2
- Units
- 2
- Rooms
- 6 bedrooms, 5 bathrooms
- Building
- 3,500 sq ft
- Lot
- 3,000 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
19 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 2, 2017 | Never finaled issued Feb 2017, no final | 233 10th Av | street spaceDetails
street space | ||
| Jul 15, 2009 | Completed final sign-off Jul 2009 | 231 10th Av | Grace Roofing & Construction | reroofing.Details
reroofing. | $18,000 |
| Jun 30, 2009 | Completed final sign-off Oct 2012 | 231 10th Av | Fahey Building/Remodeling | demo (e)2/fl bathrm&adjacent interior partitions.open(n) pass-through in 2/fl kitchen.replace (e)ridge beam in roof. remove (e) wall between (e) 2/fl study & living rm.reconfigure fenestration on 2/fl of rear facade. change (e) wood burning fireplace w/ (n) gas fireplace. bid 200905303.Details
demo (e)2/fl bathrm&adjacent interior partitions.open(n) pass-through in 2/fl kitchen.replace (e)ridge beam in roof. remove (e) wall between (e) 2/fl study & living rm.reconfigure fenestration on 2/fl of rear facade. change (e) wood burning fireplace w/ (n) gas fireplace. bid 200905303. | $21,000 |
| May 19, 2009 | Never finaled filed May 2009, never issued | 231 10th Av | Fahey Building/Remodeling | remove wall between main level study & family room and remove main level rear bathrrom, install beams & change windows on rear of the house. change from wood fireplace to gas @ main level living room. to comply with nov 200905303.Details
remove wall between main level study & family room and remove main level rear bathrrom, install beams & change windows on rear of the house. change from wood fireplace to gas @ main level living room. to comply with nov 200905303. | $10,000 |
| Apr 24, 2009 | Completed final sign-off Oct 2012 | 231 10th Av | D.J. Dowling, Inc. Gen. Contr. | new fixtures, finishes, tile ,tubs and finishes for 2nd floor bathroom #1, existing stairwell bathroom,3rd floor master bathroom. same scope of work for 3rd floor laundry room. repair first floor shower pan.Details
new fixtures, finishes, tile ,tubs and finishes for 2nd floor bathroom #1, existing stairwell bathroom,3rd floor master bathroom. same scope of work for 3rd floor laundry room. repair first floor shower pan. | $100,000 |
| Apr 21, 2009 | Completed final sign-off Apr 2009 | 231 10th Av | Fahey Building/Remodeling | light demoliton open interior drywall to determine how electrical is run and to check gas lines, other exploration.Details
light demoliton open interior drywall to determine how electrical is run and to check gas lines, other exploration. | $2,500 |
| Jul 21, 2008 | Never finaled issued Jul 2008, no final | 231 10th Av | verify/add address (#231 10th ave lower unit)(#233 10th ave upper unit)Details
verify/add address (#231 10th ave lower unit)(#233 10th ave upper unit) | ||
| Feb 1, 2008 | Never finaled issued Feb 2008, no final | 233 10th Av | street space & sidewalk permit.Details
street space & sidewalk permit. | ||
| Mar 27, 2007 | Completed final sign-off Jul 2007 | 233 10th Av | Gray Industries Inc | install old deck and (e) spiral staircase to rear of home. replace in kind.Details
install old deck and (e) spiral staircase to rear of home. replace in kind. | $15,000 |
| Mar 13, 2007 | Never finaled issued Mar 2007, no final | 233 10th Av | street space permitDetails
street space permit | ||
| Jan 2, 2007 | Never finaled issued Jan 2007, no final | 233 10th Av | street space permit only.Details
street space permit only. | ||
| Nov 14, 2006 | Completed final sign-off Jul 2007 | 233 10th Av | Gray Industries Inc | remove & replace shower pan & tile. remove & replace vanity & toilet. complete paint of bathroom (1 bathroom only) no change in lighting plan.Details
remove & replace shower pan & tile. remove & replace vanity & toilet. complete paint of bathroom (1 bathroom only) no change in lighting plan. | $7,000 |
| Nov 14, 2006 | Completed final sign-off Jul 2007 | 233 10th Av | Gray Industries Inc | add $7,500 to renew pa# 2005/02/08/5090. add $4,500 to renew pa# 2005/09/21/3444.Details
add $7,500 to renew pa# 2005/02/08/5090. add $4,500 to renew pa# 2005/09/21/3444. | $12,000 |
| Nov 14, 2006 | Completed final sign-off Jul 2007 | 233 10th Av | Gray Industries Inc | renew 200509213444, 200502085090Details
renew 200509213444, 200502085090 | |
| Oct 25, 2006 | Never finaled issued Oct 2006, no final | 233 10th Av | street space permitDetails
street space permit | ||
| Oct 2, 2006 | Completed final sign-off Jul 2007 | 233 10th Av | replace brick w/ concrete foundation. replace wood floor with concrete slab on grade.Details
replace brick w/ concrete foundation. replace wood floor with concrete slab on grade. | $32,000 | |
| Aug 31, 2006 | Completed final sign-off Jul 2007 | 233 10th Av | Gray Industries Inc | non structural remodel of legal basement unit, new kitchen and bathrooms and partition walls.Details
non structural remodel of legal basement unit, new kitchen and bathrooms and partition walls. | $80,000 |
| Sep 21, 2005 | Expired or cancelled expired Jul 2007 | 233 10th Av | renovate bathroom-retile entire.Details
renovate bathroom-retile entire. | $500 | |
| Feb 8, 2005 | Expired or cancelled expired Jul 2007 | 233 10th Av | retile kchn floor/replace cabinetsDetails
retile kchn floor/replace cabinets | $1,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Gray Industries Inc (5), Fahey Building/Remodeling (3), D.J. Dowling, Inc. Gen. Contr., Grace Roofing & Construction
- Architects
- A. Gordon Atkinson
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.