D.J. Dowling, Inc. Gen. Contr.
- Based in
- Redwood City
- On San Francisco permits
- Sep 2004 to Aug 2013
- Last 24 months
- 0 permits filed
12 permits since 2000: 10 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 8, 2013 | Expired or cancelled expired Jun 2017 | 2 Garcia Av | remove & install new tub @same location, new shower upgrade drain to 2" reinstall sink (same location), new wall mount toilet, new finishes, add new bath fan vent thru roof. work on 2nd floor only.Details
remove & install new tub @same location, new shower upgrade drain to 2" reinstall sink (same location), new wall mount toilet, new finishes, add new bath fan vent thru roof. work on 2nd floor only. | $20,000 |
| Mar 23, 2012 | Expired or cancelled expired Jun 2017 | 2 Garcia Av | bathroom remodel-remove (e) tub & replace with new shower. re-use (e) cabinets & sink. replace (e) toilet with new lo-flow toilet. replace (e) door in bathroom. patch (e) plaster as needed. no change on walls & openingsDetails
bathroom remodel-remove (e) tub & replace with new shower. re-use (e) cabinets & sink. replace (e) toilet with new lo-flow toilet. replace (e) door in bathroom. patch (e) plaster as needed. no change on walls & openings | $15,000 |
| Apr 24, 2009 | Completed final sign-off Oct 2012 | 231 10th Av | new fixtures, finishes, tile ,tubs and finishes for 2nd floor bathroom #1, existing stairwell bathroom,3rd floor master bathroom. same scope of work for 3rd floor laundry room. repair first floor shower pan.Details
new fixtures, finishes, tile ,tubs and finishes for 2nd floor bathroom #1, existing stairwell bathroom,3rd floor master bathroom. same scope of work for 3rd floor laundry room. repair first floor shower pan. | $100,000 |
| Jan 7, 2009 | Completed final sign-off Mar 2009 | 2940 Jackson St | to obtain final inspection for work approved under app #200703226893 all work is completeDetails
to obtain final inspection for work approved under app #200703226893 all work is complete | |
| Dec 15, 2008 | Completed final sign-off Mar 2009 | 2940 Jackson St | voluntary structural upgrades in entry and crawlspace to improve visible framing deficiencies.Details
voluntary structural upgrades in entry and crawlspace to improve visible framing deficiencies. | $20,000 |
| Dec 11, 2008 | Completed final sign-off Dec 2008 | 2940 Jackson St | revision to application #200808149114. alter layout of permitted spiral staircase into 184 sq ft. attic storage space.Details
revision to application #200808149114. alter layout of permitted spiral staircase into 184 sq ft. attic storage space. | |
| Nov 4, 2008 | Completed final sign-off Dec 2008 | 2940 Jackson St | repair rotted pony wall in crawlspace at rear of house.Details
repair rotted pony wall in crawlspace at rear of house. | $5,000 |
| Aug 14, 2008 | Completed final sign-off Dec 2008 | 2940 Jackson St | demolish existing sub-standard stairs to attic, reconstruct new stairs to meet building code/safety standards. stairs to be wood finished with paint.Details
demolish existing sub-standard stairs to attic, reconstruct new stairs to meet building code/safety standards. stairs to be wood finished with paint. | $20,000 |
| Sep 26, 2005 | Completed final sign-off May 2006 | 2 Garcia Av | install 1 window to match in style & size.Details
install 1 window to match in style & size. | $1,800 |
| Sep 14, 2005 | Completed final sign-off Nov 2005 | 475 Alvarado St | voluntary stru upgrade.no calculations, no special insp, no wall removal.Details
voluntary stru upgrade.no calculations, no special insp, no wall removal. | $60,000 |
| Aug 16, 2005 | Completed final sign-off May 2006 | 2 Garcia Av | storage & workshop improvements in (e) space (1st floor only)Details
storage & workshop improvements in (e) space (1st floor only) | $50,000 |
| Sep 8, 2004 | Completed final sign-off Jan 2005 | 182 Commonwealth Av | replace fixures in 2nd floor bathroom, new drywall at wallas and ceiling, new tileDetails
replace fixures in 2nd floor bathroom, new drywall at wallas and ceiling, new tile | $20,000 |