12 permits since 2000: 10 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 2 completed, 2 expired or cancelled. Typically 0 days from filing to permit and 692 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 8, 2013 | Expired or cancelled expired Jun 2017 | 2 Garcia Av | remove & install new tub @same location, new shower upgrade drain to 2" reinstall sink (same location), new wall mount toilet, new finishes, add new bath fan vent thru roof. work on 2nd floor only.Details
remove & install new tub @same location, new shower upgrade drain to 2" reinstall sink (same location), new wall mount toilet, new finishes, add new bath fan vent thru roof. work on 2nd floor only. | $20,000 |
| Mar 23, 2012 | Expired or cancelled expired Jun 2017 | 2 Garcia Av | bathroom remodel-remove (e) tub & replace with new shower. re-use (e) cabinets & sink. replace (e) toilet with new lo-flow toilet. replace (e) door in bathroom. patch (e) plaster as needed. no change on walls & openingsDetails
bathroom remodel-remove (e) tub & replace with new shower. re-use (e) cabinets & sink. replace (e) toilet with new lo-flow toilet. replace (e) door in bathroom. patch (e) plaster as needed. no change on walls & openings | $15,000 |
| Apr 24, 2009 | Completed final sign-off Oct 2012 | 231 10th Av | new fixtures, finishes, tile ,tubs and finishes for 2nd floor bathroom #1, existing stairwell bathroom,3rd floor master bathroom. same scope of work for 3rd floor laundry room. repair first floor shower pan.Details
new fixtures, finishes, tile ,tubs and finishes for 2nd floor bathroom #1, existing stairwell bathroom,3rd floor master bathroom. same scope of work for 3rd floor laundry room. repair first floor shower pan. | $100,000 |
| Sep 8, 2004 | Completed final sign-off Jan 2005 | 182 Commonwealth Av | replace fixures in 2nd floor bathroom, new drywall at wallas and ceiling, new tileDetails
replace fixures in 2nd floor bathroom, new drywall at wallas and ceiling, new tile | $20,000 |