Block 1744, lot 001
1201 06th Av
17 permits filed for this property since 2000.
CompletedIn progressNever finaledExpired or cancelled
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 27, 2025 | In progress | 1201 06th Av | Kmk Construction And Design | remove non bearing wall at kitchen in units 1, 4, 7. | $3,000 |
| Apr 15, 2025 | In progress | 1201 06th Av | Kmk Construction And Design | unit 1,2,4,5,7,8,9: add in-unit laundry. area of work convert closet to laundry at 7 units. | $12,600 |
| Apr 11, 2025 | Completed | 1201 06th Av | All Type Remodeling Inc | remove the grabstop flashing from the chimney vents. clean and install new chimney vents and grabstop flashing. install layer certenity gta harwork. | $14,600 |
| Apr 11, 2025 | Completed | 1201 06th Av | All Type Remodeling Inc | remove (2) pieces of plywood around the drain on the roof. install (2) new pieces of plywood. | $750 |
| Feb 21, 2025 | Completed | 1201 06th Av | Yefa Construction Inc | unit 2: remodel kitchen (56sf) and 1 bath (35sf) in-kind. reference to administrative permit under bpa# 202502210875. | $2 |
| Feb 21, 2025 | Completed | 1201 06th Av | Yefa Construction Inc | administrative permit to remove unit #2 from scope of work under bpa# 202302081654. new remodel kitchen and bathroom is submitted under bpa# 202502210877. | |
| Jan 9, 2025 | Completed | 1201 06th Av | Yefa Construction Inc | replace 8 windows in kind. 7 windows visible from the street. wood windows with integratged ogee lugs | $3,000 |
| Feb 8, 2023 | Never finaled | 1201 06th Av | Kmk Construction And Design | comply with complaint 202292048 and 202300932. no removal of walls for all of them. fix intercom and buzzer. units 1,3,4,6,7,9: remodel 1 kitchen (80sf) and 1 bath (45sf) in each unit. units 2,5,8: remodel 1 kitchen (56sf) and 1 bath (35sf) in each unit. remodel in kind. no wall removal | $198,000 |
| Jul 16, 2019 | Never finaled | 1201 06th Av | street space | ||
| Sep 14, 2017 | Completed | 1201 06th Av | Nabi Construction & Engineering Inc | soft story retrofit per sfebc ch4d-2016 cebc appendex a-4: add new ply shear walls, steel moment frames with foundations. | $90,000 |
| Apr 10, 2015 | Completed | 1201 06th Av | Valex Construction | apt #6: remodeling existing bathroom (1) and kitchen (1). replace in kind. no structural work. | $15,000 |
| Mar 24, 2015 | Never finaled | 1201 06th Av | street space | ||
| Jul 22, 2013 | Completed | 1201 06th Av | Gray Industries Inc | remove and replace kitchen counter top, repair cabinets, rmeove and replace bath vanity. instal new bathroom linoleum, patch and paint entire apt. refinish all hardwood floors. | $9,000 |
| Dec 26, 2012 | Completed | 1201 06th Av | Gray Industries Inc | unit #1:bathroom remodel:remove and replace toilet, vanity and tub/shower tile surround, new linoleum. patch walls throughout unit and paint entire unit. refinish hardwood floors. no new lightwell under this permit. | $14,500 |
| Apr 4, 2011 | Expired or cancelled | 1201 06th Av | B Bilt Contruction Inc | remove and replace kitchen cabinets and appliances, new linoleum. remove and replace tub, valve, tile wall in bathroom, new vanity,linoleum. patch walls, prime and paint. no structural work. work in unit 4 only. no change to exhaust system | $15,000 |
| Jul 29, 2005 | Never finaled | 1201 06th Av | Edwards Systems Technology Inc/Est Servi | fire alarm repair. replace (e) dead fire alarm panel with a new panel. all field devices are | $3,500 |
| May 22, 2002 | Never finaled | 1201 06th Av | street space |