Block 1551, lot 047
500 09th Ave
- City’s use
- Multi-Family Residential
- Built
- 1922
- Stories
- 3
- Units
- 6
- Rooms
- 11 bedrooms, 6 bathrooms
- Building
- 5,106 sq ft
- Lot
- 2,000 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 6, 2023 | Completed final sign-off Oct 2023 | 500 09th Av | Crime Watch Security Sys Llc | upgrade existing fire alarm system to comply with sffc section 1103.7.6.1Details
upgrade existing fire alarm system to comply with sffc section 1103.7.6.1 | $34,050 |
| May 31, 2023 | Completed final sign-off Jul 2023 | 500 09th Av | M & L Construction | exterior stair repair, less than 50% not visble from the street. replac with new wood in-kind.Details
exterior stair repair, less than 50% not visble from the street. replac with new wood in-kind. | $10,500 |
| Mar 11, 2021 | Completed final sign-off Feb 2024 | 500 09th Av | all work located at unit #1. (no structural work) relocate kitchen to extg bedroom. convert old kitchen space into new bedroom.Details
all work located at unit #1. (no structural work) relocate kitchen to extg bedroom. convert old kitchen space into new bedroom. | $25,000 | |
| Oct 13, 2020 | Completed final sign-off Oct 2020 | 500 09th Av | J V Roofing | remove old roof. install new roof. replace roof metal.Details
remove old roof. install new roof. replace roof metal. | $12,000 |
| Sep 30, 2019 | Never finaled issued Sep 2019, no final | 500 09th Av | street spaceDetails
street space | ||
| Feb 2, 2018 | Completed final sign-off Apr 2018 | 500 09th Av | Allied Teamwork Construction Co | per approved app#201708306372. revise foundation details per soft story retrofitDetails
per approved app#201708306372. revise foundation details per soft story retrofit | $100 |
| Aug 30, 2017 | Completed final sign-off Apr 2018 | 500 09th Av | Allied Teamwork Construction Co | soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4 | $70,000 |
| Oct 25, 2006 | Completed final sign-off Dec 2006 | 500 09th Av | Gray Industries Inc | repair stringer support to top floor stair tread to intermediate landing leading to top floor and decking at top floor landing to comply with nov #200676731-#3Details
repair stringer support to top floor stair tread to intermediate landing leading to top floor and decking at top floor landing to comply with nov #200676731-#3 | $1,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Allied Teamwork Construction Co (2), Crime Watch Security Sys Llc, Gray Industries Inc, J V Roofing, M & L Construction
- Engineers
- Doug Lee, Horon Lee
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.