Back to kitchen remodel contractors
Giuliani Construction Incorp
- Based in
- San Jose
- On San Francisco permits
- Sep 2010 to Aug 2026
- Last 24 months
- 8 permits filed
64 permits since 2000: 50 completed, 4 in progress, 8 never finaled, 2 expired or cancelled.
Of the 8 never-finaled permits, 2 are 3 to 5 years old, 3 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
19 kitchen remodel permits: 17 completed, 2 never finaled. Typically 0 days from filing to permit and 53 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 30, 2025 | Completed final sign-off Mar 2025 | 680 Mission St | unit 9e: to comply with nov 202432384 #5 - repair work , patch ceiling in kitchen & hallway, patch walls in hallway, kitchen and closet, insulate ceilings and walls. repair work in 9th floor hallway, patch and insulate hallway walls.Details
unit 9e: to comply with nov 202432384 #5 - repair work , patch ceiling in kitchen & hallway, patch walls in hallway, kitchen and closet, insulate ceilings and walls. repair work in 9th floor hallway, patch and insulate hallway walls. | $10,000 |
| Dec 29, 2023 | Completed final sign-off May 2024 | 260 King St | unit #475: living room drywal patch & install base board and paint, limit to 50 sf. closet install drywall-paint & install base. kitchen and bath remodel: install flooring put back cabinets & patch walls. no structural electric or plmg will be moved only put back. no new wall & no (e)wall relocationDetails
unit #475: living room drywal patch & install base board and paint, limit to 50 sf. closet install drywall-paint & install base. kitchen and bath remodel: install flooring put back cabinets & patch walls. no structural electric or plmg will be moved only put back. no new wall & no (e)wall relocation | $41,969 |
| Aug 14, 2023 | Completed final sign-off Mar 2025 | 1377 Florida St | legalization of existing dwelling unit at top floor. remodel/upgrade kitchen & laundry area.adu per ordinance #95-17Details
legalization of existing dwelling unit at top floor. remodel/upgrade kitchen & laundry area.adu per ordinance #95-17 | $30,000 |
| Aug 8, 2023 | Completed final sign-off Sep 2023 | 50 Jerrold Av | unit #207: kitchen cabinet remodel in kind. floor remove and re-install.Details
unit #207: kitchen cabinet remodel in kind. floor remove and re-install. | $12,000 |
| Aug 25, 2021 | Never finaled issued Jan 2022, no final | 350 Golden Gate Av | interior renovation of the st. francis living room senior center. new lighting, receptacles, appliances, kitchen fixtures, millwork, and finishes.Details
interior renovation of the st. francis living room senior center. new lighting, receptacles, appliances, kitchen fixtures, millwork, and finishes. | $55,000 |
| Jun 17, 2021 | Completed final sign-off Jul 2021 | 870 Harrison St | water damage on ceiling area of the kitchen and parts of the walls. ceiling 64 sq ft walls 64 sq ft. match extg sheetrock 5/8" type xDetails
water damage on ceiling area of the kitchen and parts of the walls. ceiling 64 sq ft walls 64 sq ft. match extg sheetrock 5/8" type x | $10,000 |
| Jun 11, 2021 | Never finaled issued Jun 2021, no final | 870 Harrison St | water damage in the ceiling area of the kitchen and parts of thw walls, ceiling 64 sq ft. wall's 64 sq ft 5 18 sheet rock match (e) all new sheet rock shall re 5/8" type x to match (e)Details
water damage in the ceiling area of the kitchen and parts of thw walls, ceiling 64 sq ft. wall's 64 sq ft 5 18 sheet rock match (e) all new sheet rock shall re 5/8" type x to match (e) | $10,000 |
| Jun 7, 2021 | Completed final sign-off Jul 2021 | 870 Harrison St | repair water damaged on the ceiling of kitchen and part of this walls. no modification of fire spinklers.Details
repair water damaged on the ceiling of kitchen and part of this walls. no modification of fire spinklers. | $10,000 |
| Jun 7, 2021 | Completed final sign-off Jul 2021 | 870 Harrison St | repair water damaged on the ceiling of kitchen and part of this walls. no modification of fire spinklers.Details
repair water damaged on the ceiling of kitchen and part of this walls. no modification of fire spinklers. | $10,000 |
| Feb 1, 2021 | Completed final sign-off Feb 2021 | 590 06th St | unit 302 - water damage repair - repair drywall, kitchen wall and ceiling patch. loft - repair drywall, patch wall and ceiling. batt insulation 10"-r30 paint reinstall cabinetDetails
unit 302 - water damage repair - repair drywall, kitchen wall and ceiling patch. loft - repair drywall, patch wall and ceiling. batt insulation 10"-r30 paint reinstall cabinet | $6,000 |
| Feb 1, 2021 | Completed final sign-off Feb 2021 | 590 06th St | unit 303 - water damage repair - repair drywall, kitchen wall and ceiling patch. loft - repair drywall, patch wall and ceiling. batt insulationDetails
unit 303 - water damage repair - repair drywall, kitchen wall and ceiling patch. loft - repair drywall, patch wall and ceiling. batt insulation | $6,000 |
| Jan 15, 2021 | Completed final sign-off Nov 2021 | 1945 Washington St | fire damage, repair new drywall, walls and ceilings unit, new ceiling and exterior wall insulation. new plumbing fixtures, new kitchen cabinets, new windows at bedroom. repair damaged elec and hvac.Details
fire damage, repair new drywall, walls and ceilings unit, new ceiling and exterior wall insulation. new plumbing fixtures, new kitchen cabinets, new windows at bedroom. repair damaged elec and hvac. | $50,000 |
| Nov 20, 2020 | Completed final sign-off Jan 2021 | 501 Beale St | install partial insulation & drywall in halway 10' by 8' , bedroom 12'x8' & kitchen 2'x4' as needed ( due to water damage repair )Details
install partial insulation & drywall in halway 10' by 8' , bedroom 12'x8' & kitchen 2'x4' as needed ( due to water damage repair ) | $12,500 |
| Aug 8, 2020 | Completed final sign-off Nov 2020 | 240 Lombard St | water damage repair of kitchen, bathrm- drywall 15.22 lin ft vanity-2.58 lin ft, hallway & liv rm. repair drywall. kitchen cabs & flr in-kind. 5/8" drywall. regarding total sq ft are to be repaired: kitchen-drywall 11.25 linear ft. cabs. 30.41 linear ft. cabinet 7.10 sqft hallway-drywall 21Details
water damage repair of kitchen, bathrm- drywall 15.22 lin ft vanity-2.58 lin ft, hallway & liv rm. repair drywall. kitchen cabs & flr in-kind. 5/8" drywall. regarding total sq ft are to be repaired: kitchen-drywall 11.25 linear ft. cabs. 30.41 linear ft. cabinet 7.10 sqft hallway-drywall 21 | $33,000 |
| Mar 10, 2020 | Completed final sign-off Jun 2021 | 701 Minna St | apt 4: water leak, repair in like and kind in kitchen and 2 bathrooms.Details
apt 4: water leak, repair in like and kind in kitchen and 2 bathrooms. | $100,000 |
| Mar 10, 2020 | Completed final sign-off Nov 2020 | 262 Vienna St | flooring on 1st and 2nd floor, kitchen cabint detatch and reset. repairs same like and kind. in-kind repair due to water damage.Details
flooring on 1st and 2nd floor, kitchen cabint detatch and reset. repairs same like and kind. in-kind repair due to water damage. | $56,000 |
| Dec 6, 2018 | Completed final sign-off Dec 2018 | 5880 03rd St | unit 212: kitchen water damage repair. repair insulation, double layer 5/8" party wall. install new base cabinets, install kitchen sink.Details
unit 212: kitchen water damage repair. repair insulation, double layer 5/8" party wall. install new base cabinets, install kitchen sink. | $5,000 |
| Nov 7, 2011 | Completed final sign-off Jan 2012 | 15 Garrison Av | dry wall repair insulation. new kitchen cabinets. new texture paint. no change to upper cabinets lighting to comply with cec.Details
dry wall repair insulation. new kitchen cabinets. new texture paint. no change to upper cabinets lighting to comply with cec. | $44,000 |
| Sep 20, 2010 | Completed final sign-off Oct 2011 | 2618 16th Av | expansion of (e) kitchen into lightwell. remodeling (e) kitchen. add new bathroom in basement create (n) hallway to connect basement rooms & stairs to 2nd. flr.Details
expansion of (e) kitchen into lightwell. remodeling (e) kitchen. add new bathroom in basement create (n) hallway to connect basement rooms & stairs to 2nd. flr. | $30,000 |