Giuliani Construction Incorp
- Based in
- San Jose
- On San Francisco permits
- Sep 2010 to Aug 2026
- Last 24 months
- 8 permits filed
64 permits since 2000: 50 completed, 4 in progress, 8 never finaled, 2 expired or cancelled.
Of the 8 never-finaled permits, 2 are 3 to 5 years old, 3 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 2 completed, 1 never finaled. Typically 127 days from filing to permit and 738 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 27, 2020 | Never finaled issued Feb 2021, no final | 1555 Innes Av | rev to 201909040664:(n) 5/8in type-x walls and celing.extend to roof sheething.r/r floor sheathing on 2/f. r/r windows throughout,r/r lath and laste throughout.r/r stairs and stair framing.repair floor joist on 2/f. replace electrical throughout. relocate fau's to comply with nov202035932.Details
rev to 201909040664:(n) 5/8in type-x walls and celing.extend to roof sheething.r/r floor sheathing on 2/f. r/r windows throughout,r/r lath and laste throughout.r/r stairs and stair framing.repair floor joist on 2/f. replace electrical throughout. relocate fau's to comply with nov202035932. | $700,000 |
| May 20, 2020 | Completed final sign-off Mar 2024 | 2904 23rd St | residential fire damage repair. remove and replace staircase, floor sheeting, floor framing, wall framing, windows, doors, stucco, drywall and insulation per plans. damaged eletrical, & test plumbing. replace as necessary caints, carbon monoxide, and smoke detectors.Details
residential fire damage repair. remove and replace staircase, floor sheeting, floor framing, wall framing, windows, doors, stucco, drywall and insulation per plans. damaged eletrical, & test plumbing. replace as necessary caints, carbon monoxide, and smoke detectors. | $65,000 |
| Sep 20, 2010 | Completed final sign-off Oct 2011 | 2618 16th Av | expansion of (e) kitchen into lightwell. remodeling (e) kitchen. add new bathroom in basement create (n) hallway to connect basement rooms & stairs to 2nd. flr.Details
expansion of (e) kitchen into lightwell. remodeling (e) kitchen. add new bathroom in basement create (n) hallway to connect basement rooms & stairs to 2nd. flr. | $30,000 |