Back to bathroom remodel contractors
Giuliani Construction Incorp
- Based in
- San Jose
- On San Francisco permits
- Sep 2010 to Aug 2026
- Last 24 months
- 8 permits filed
64 permits since 2000: 50 completed, 4 in progress, 8 never finaled, 2 expired or cancelled.
Of the 8 never-finaled permits, 2 are 3 to 5 years old, 3 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 10 completed. Typically 0 days from filing to permit and 130 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 3, 2025 | Completed final sign-off May 2025 | 535 Oak St | in kind bathroom repair insulation, drywall , new light, outlet switch, receptacle. 560 sf of drywall, 160sf of insulationDetails
in kind bathroom repair insulation, drywall , new light, outlet switch, receptacle. 560 sf of drywall, 160sf of insulation | $20,000 |
| Nov 26, 2024 | Completed final sign-off Dec 2024 | 680 Mission St | unit 9g- replace drywall, paint and carperting, wallpaper in entryway , bathroom, common hallway due to water damage to comply with nov 2024-30261.Details
unit 9g- replace drywall, paint and carperting, wallpaper in entryway , bathroom, common hallway due to water damage to comply with nov 2024-30261. | $9,000 |
| Dec 29, 2023 | Completed final sign-off May 2024 | 260 King St | unit #475: living room drywal patch & install base board and paint, limit to 50 sf. closet install drywall-paint & install base. kitchen and bath remodel: install flooring put back cabinets & patch walls. no structural electric or plmg will be moved only put back. no new wall & no (e)wall relocationDetails
unit #475: living room drywal patch & install base board and paint, limit to 50 sf. closet install drywall-paint & install base. kitchen and bath remodel: install flooring put back cabinets & patch walls. no structural electric or plmg will be moved only put back. no new wall & no (e)wall relocation | $41,969 |
| Sep 18, 2023 | Completed final sign-off Mar 2025 | 1377 Florida St | revision to pa# 202303012840. dryrot repairs. unit #1379: in-kind replacement of wall framing in dining, bath, living, & front bedroom. unit #1381: replace wall framing in living, hall, bath. replace portions of deck framing. unit #1377: fire damage repair. replace int wall finishes, insulation/Details
revision to pa# 202303012840. dryrot repairs. unit #1379: in-kind replacement of wall framing in dining, bath, living, & front bedroom. unit #1381: replace wall framing in living, hall, bath. replace portions of deck framing. unit #1377: fire damage repair. replace int wall finishes, insulation/ | $100,000 |
| Sep 15, 2022 | Completed final sign-off Jun 2023 | 88 King St | apt 1108: remodel bathroom. remove (e) tub and convert to walk-in shower in same footprint. replace tile. no removal of wallDetails
apt 1108: remodel bathroom. remove (e) tub and convert to walk-in shower in same footprint. replace tile. no removal of wall | $40,029 |
| May 19, 2022 | Completed final sign-off Jul 2022 | 260 King St | comply with nov #202290984- one bathroom remodel: new toilet, new vanity, install new insulation and drywall, new faucet and sink, painting.Details
comply with nov #202290984- one bathroom remodel: new toilet, new vanity, install new insulation and drywall, new faucet and sink, painting. | $10,812 |
| Mar 10, 2020 | Completed final sign-off Jun 2021 | 701 Minna St | apt 4: water leak, repair in like and kind in kitchen and 2 bathrooms.Details
apt 4: water leak, repair in like and kind in kitchen and 2 bathrooms. | $100,000 |
| Jun 4, 2019 | Completed final sign-off Jun 2019 | 25 Sierra St | repair water damaged ceiling in bathroom like-for-like, double layer of 5/8" type 'x'gypsum, r-30 insulationDetails
repair water damaged ceiling in bathroom like-for-like, double layer of 5/8" type 'x'gypsum, r-30 insulation | $4,200 |
| Mar 28, 2014 | Completed final sign-off Apr 2014 | 148 Britton St | work in unit #167: comply with nov #201454691 dated 3/5/14 repair damaged walls at ground floor. work shall be drywall repair in bathroom, hallway area, some insulation at exterior wall, 30 lf of drywall up to 2'-0" height with area not to exceed 30 sf. all new drywall shall be 5/8" type x gyp bd.Details
work in unit #167: comply with nov #201454691 dated 3/5/14 repair damaged walls at ground floor. work shall be drywall repair in bathroom, hallway area, some insulation at exterior wall, 30 lf of drywall up to 2'-0" height with area not to exceed 30 sf. all new drywall shall be 5/8" type x gyp bd. | $6,500 |
| Sep 20, 2010 | Completed final sign-off Oct 2011 | 2618 16th Av | expansion of (e) kitchen into lightwell. remodeling (e) kitchen. add new bathroom in basement create (n) hallway to connect basement rooms & stairs to 2nd. flr.Details
expansion of (e) kitchen into lightwell. remodeling (e) kitchen. add new bathroom in basement create (n) hallway to connect basement rooms & stairs to 2nd. flr. | $30,000 |