103 permits since 2000: 61 completed, 8 in progress, 27 never finaled, 7 expired or cancelled.
Of the 27 never-finaled permits, 1 is 3 to 5 years old, 10 are 5 to 10 years old, 16 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
29 kitchen remodel permits: 13 completed, 4 in progress, 8 never finaled, 4 expired or cancelled. Typically 0 days from filing to permit and 476 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 14, 2025 | In progress issued May 2025 | 30 Jules Av | rev to pa # 202407035778: propose (n) bath & (n) ac system @ 1/f. relocate laundry to garage @ 1/f. (n) skylightat 2/f kitchen, reconfigure (n) bath & closet @ 2/f. replace front window @ 2/f. change windows at rear to single hung. relocate shear wall @ rear to exterior.Details
rev to pa # 202407035778: propose (n) bath & (n) ac system @ 1/f. relocate laundry to garage @ 1/f. (n) skylightat 2/f kitchen, reconfigure (n) bath & closet @ 2/f. replace front window @ 2/f. change windows at rear to single hung. relocate shear wall @ rear to exterior. | |
| Sep 10, 2024 | In progress issued Sep 2024 | 665 Colby St | infill light well and convert roof deck into relocated (n) kitchen and convert (e) kitchen into (n) bedroom located at 3rd floorDetails
infill light well and convert roof deck into relocated (n) kitchen and convert (e) kitchen into (n) bedroom located at 3rd floor | $10,000 |
| Jul 3, 2024 | In progress issued Jul 2024 | 30 Jules Av | 1/f: relocate & remodel (e) laundry room & (e) bathroom. remodel playroom & add (n) bedroom. reconfigure interior staircase. 2/f: convert left rear bedroom into master suite. relocate one (e) bedroom, (e) dining, & (e) living room. relocate & remodel (e) kitchen & (e) bathroom. new deck.Details
1/f: relocate & remodel (e) laundry room & (e) bathroom. remodel playroom & add (n) bedroom. reconfigure interior staircase. 2/f: convert left rear bedroom into master suite. relocate one (e) bedroom, (e) dining, & (e) living room. relocate & remodel (e) kitchen & (e) bathroom. new deck. | $200,000 |
| Jul 18, 2023 | Expired or cancelled expired Feb 2026 | 407 Wilde Av | revision to approved pa# 201811135654. relocate kitchen to family room. add new window.Details
revision to approved pa# 201811135654. relocate kitchen to family room. add new window. | $15,000 |
| Jan 3, 2022 | In progress issued Feb 2026 | 266 Connecticut St | rear horizontal & vertical addition. remodel/reconfig (e) sdf to add 1 new unit. add new 6 bathrms. remove (e) kitchen & replace w/new for lower unit. add kitchen & living spaces for upper unit. expand garage. add roof deck. alter front & rear of bldg w/new facade. n flat roof. upgrade foundation.Details
rear horizontal & vertical addition. remodel/reconfig (e) sdf to add 1 new unit. add new 6 bathrms. remove (e) kitchen & replace w/new for lower unit. add kitchen & living spaces for upper unit. expand garage. add roof deck. alter front & rear of bldg w/new facade. n flat roof. upgrade foundation. | $1,168,850 |
| Dec 7, 2021 | Never finaled issued Jan 2022, no final | 160 23rd Av | interior remodel: remove wall betweem dining room and kitchen, wall between dining room/living room. new steel beam at unit 162. 2nd floor only. kitchen remodel.Details
interior remodel: remove wall betweem dining room and kitchen, wall between dining room/living room. new steel beam at unit 162. 2nd floor only. kitchen remodel. | $35,000 |
| Apr 29, 2021 | Expired or cancelled expired Feb 2026 | 407 Wilde Av | reference complaint # 202174786; remodel kitchen cabinet,replace rotten cabinets.Details
reference complaint # 202174786; remodel kitchen cabinet,replace rotten cabinets. | $5,000 |
| Dec 10, 2019 | Never finaled issued Feb 2020, no final | 7719 Geary Bl | unit #3: interior remodel. convert living room to one office and add antoher office (total of 2), and one bath. remodel kitchen. convert master bedroom to office and smaller master bedroom. all work in unit #3 (top floor unit).Details
unit #3: interior remodel. convert living room to one office and add antoher office (total of 2), and one bath. remodel kitchen. convert master bedroom to office and smaller master bedroom. all work in unit #3 (top floor unit). | $10,000 |
| Aug 28, 2019 | Completed final sign-off Mar 2020 | 715 Garfield St | remodel bathroom & kitchen, add recessed lights, smoke detectors, in-kindDetails
remodel bathroom & kitchen, add recessed lights, smoke detectors, in-kind | $50,000 |
| Feb 28, 2019 | Completed final sign-off Jun 2019 | 187 College Av | replace kitchen cabinet in-kind, (1) bath tub, (1) kitchen sink & reconnect gas range, no change of (e) floor planDetails
replace kitchen cabinet in-kind, (1) bath tub, (1) kitchen sink & reconnect gas range, no change of (e) floor plan | $28,000 |
| Nov 14, 2018 | Never finaled issued Nov 2018, no final | 2800 Balboa St | remodel unit a, b and c kitchen (3), bathroom (3). upgrade 200 amp main panel.Details
remodel unit a, b and c kitchen (3), bathroom (3). upgrade 200 amp main panel. | $40,000 |
| Nov 13, 2018 | Expired or cancelled expired Feb 2026 | 407 Wilde Av | legalization of dwelling unit @ 1st flr per ord# 43-14 & planning code section 207.3. (n) adu included kitchen, bedrooms & baths.Details
legalization of dwelling unit @ 1st flr per ord# 43-14 & planning code section 207.3. (n) adu included kitchen, bedrooms & baths. | $15,000 |
| Dec 18, 2017 | Completed final sign-off Apr 2018 | 1038 Girard St | remodel (1) kitchen and (2) bathrooms. electrical wiring upgrade. repair drywall and replace (1) furnaceDetails
remodel (1) kitchen and (2) bathrooms. electrical wiring upgrade. repair drywall and replace (1) furnace | $38,000 |
| Aug 29, 2017 | Completed final sign-off Jan 2018 | 2455 39th Av | remove the partition wall between the kitchen and the dining room to integrate into one space. add wall to close off an existing entry way to the kitchen near the stair landing. open an entry to the kitchen way from the hallwayDetails
remove the partition wall between the kitchen and the dining room to integrate into one space. add wall to close off an existing entry way to the kitchen near the stair landing. open an entry to the kitchen way from the hallway | $10,000 |
| Aug 2, 2017 | Never finaled issued Aug 2017, no final | 197 Joost Av | remodel 1 kitchen, 2 bathrooms, add lighting, and outlets, replace 4 windows, and 1 patio door in kind @ rear ground floor units, all work done @ basement unitDetails
remodel 1 kitchen, 2 bathrooms, add lighting, and outlets, replace 4 windows, and 1 patio door in kind @ rear ground floor units, all work done @ basement unit | $60,000 |
| Jul 12, 2017 | Completed final sign-off Oct 2019 | 91 Stanyan Bl | remodel (1) kitchen, (2) bathrooms, rewire electrical, replace rotten plumbing pipes, redrywall, add insulationDetails
remodel (1) kitchen, (2) bathrooms, rewire electrical, replace rotten plumbing pipes, redrywall, add insulation | $65,000 |
| Jul 12, 2017 | Completed final sign-off Oct 2019 | 89 Stanyan Bl | remodel (2) bathrooms, (1) kitchen, rewire electrical, replace plubming pipes, redrywall, add insulation, electrical main panel @ garage.Details
remodel (2) bathrooms, (1) kitchen, rewire electrical, replace plubming pipes, redrywall, add insulation, electrical main panel @ garage. | $65,000 |
| Jul 12, 2017 | Never finaled issued Jul 2017, no final | 373 07th Av | kitchen remodel: replace cabinets, open wall and cieling to update electrical, replace tile floro and replace bedroom door. no changes to wall locations.Details
kitchen remodel: replace cabinets, open wall and cieling to update electrical, replace tile floro and replace bedroom door. no changes to wall locations. | $25,000 |
| Jul 7, 2016 | Never finaled issued Jul 2016, no final | 569 Bright St | remodel kitchen and 1 bathroom, 1 powder room and redny wall, add insulation. add outlets and lights at 2nd floor.Details
remodel kitchen and 1 bathroom, 1 powder room and redny wall, add insulation. add outlets and lights at 2nd floor. | $28,000 |
| Feb 12, 2016 | Completed final sign-off Jun 2017 | 562 37th Av | unit #4 - remodel kitchen & bathroom, replace 2 windows in kind, same size & same opening. relocate fuse panel. no change to layout.Details
unit #4 - remodel kitchen & bathroom, replace 2 windows in kind, same size & same opening. relocate fuse panel. no change to layout. | $22,000 |
| Feb 12, 2016 | Completed final sign-off Jun 2017 | 562 37th Av | unit #2 - to comply w/nov #201692651 & 201696671 - remodel kitchen & bathroom, replace 2 rear windows in kind same size & same opening. relocate fuse panel. repair heater.Details
unit #2 - to comply w/nov #201692651 & 201696671 - remodel kitchen & bathroom, replace 2 rear windows in kind same size & same opening. relocate fuse panel. repair heater. | $22,000 |
| Feb 11, 2016 | Never finaled issued Mar 2016, no final | 167 Brussels St | revision to appl #200807176988 - 1st flr - change part of bedroom to home office, new hallway at garage. 2nd flr: relocate kitchen & living & bath rooms. cahnge living & nook to bedrooms, new shed (100 sf) at rear yard.Details
revision to appl #200807176988 - 1st flr - change part of bedroom to home office, new hallway at garage. 2nd flr: relocate kitchen & living & bath rooms. cahnge living & nook to bedrooms, new shed (100 sf) at rear yard. | $100 |
| Dec 31, 2014 | Completed final sign-off Jan 2017 | 200 Bright St | change occupant from (e) barbar shop to group r-3 residential unit. approved variance case# 2013.1410v. construct 2 new bedrooms, 1 new kitchen, 1 new bathroom, relocate 1 bathroom. 2 storages. add furnance.Details
change occupant from (e) barbar shop to group r-3 residential unit. approved variance case# 2013.1410v. construct 2 new bedrooms, 1 new kitchen, 1 new bathroom, relocate 1 bathroom. 2 storages. add furnance. | $70,000 |
| Dec 29, 2014 | Expired or cancelled expired Dec 2025 | 2046 Mission St | g/f -convert (e) retail space to full service restaurant; mep & kitchen hood, shop front signage under separate permit.Details
g/f -convert (e) retail space to full service restaurant; mep & kitchen hood, shop front signage under separate permit. | $80,000 |
| Nov 3, 2014 | Completed final sign-off Jan 2022 | 21 Scotia Av | remodel kitchen & bathroom on 2nd floor. replace steel plumbing with copper. rewire old wiring to romex, replace garage broker sewer line.Details
remodel kitchen & bathroom on 2nd floor. replace steel plumbing with copper. rewire old wiring to romex, replace garage broker sewer line. | $12,000 |
| Oct 21, 2013 | Completed final sign-off Jul 2015 | 2827 California St | convert vacant commercial space to new full service japanese restaurant. tenant improvement work only. including commercial kitchen dining and bar. ** maher: compliance with ordinance no# 155-13 not required **Details
convert vacant commercial space to new full service japanese restaurant. tenant improvement work only. including commercial kitchen dining and bar. ** maher: compliance with ordinance no# 155-13 not required ** | $120,000 |
| Sep 27, 2013 | Never finaled issued Oct 2013, no final | 352 14th St | revision to pa# 2012-1031-3231/s1-construct new 2hr shaft for kitchen exhaust grease duct in lieu of 2hr fire wrap.Details
revision to pa# 2012-1031-3231/s1-construct new 2hr shaft for kitchen exhaust grease duct in lieu of 2hr fire wrap. | $1,200 |
| Mar 28, 2013 | Completed final sign-off Jan 2015 | 200 Bright St | remodel 1 kitchen and 2 bathrooms and laundry room at 1st floor. rewire the kitchen, 2 bathrooms, 3 bedrooms. replace kitchen sink, bathroomsinks and laundry room plumbing. replace 2 furnace and repolace sewer line at 1st floor. install furnace and ductwork.Details
remodel 1 kitchen and 2 bathrooms and laundry room at 1st floor. rewire the kitchen, 2 bathrooms, 3 bedrooms. replace kitchen sink, bathroomsinks and laundry room plumbing. replace 2 furnace and repolace sewer line at 1st floor. install furnace and ductwork. | $25,000 |
| Jan 22, 2009 | Completed final sign-off Mar 2009 | 219 Curtis St | 2nd floor remodel kitchen & bathroom & power room including upgrade electrical outlet at kitchen & bathroom area & upgrade plumbing.Details
2nd floor remodel kitchen & bathroom & power room including upgrade electrical outlet at kitchen & bathroom area & upgrade plumbing. | $15,000 |