Back to bathroom remodel contractors
Galaxy Building Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2008 to Sep 2026
- Last 24 months
- 6 permits filed
103 permits since 2000: 61 completed, 8 in progress, 27 never finaled, 7 expired or cancelled.
Of the 27 never-finaled permits, 1 is 3 to 5 years old, 10 are 5 to 10 years old, 16 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
41 bathroom remodel permits: 27 completed, 3 in progress, 10 never finaled, 1 expired or cancelled. Typically 2 days from filing to permit and 358 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 14, 2025 | In progress issued May 2025 | 30 Jules Av | rev to pa # 202407035778: propose (n) bath & (n) ac system @ 1/f. relocate laundry to garage @ 1/f. (n) skylightat 2/f kitchen, reconfigure (n) bath & closet @ 2/f. replace front window @ 2/f. change windows at rear to single hung. relocate shear wall @ rear to exterior.Details
rev to pa # 202407035778: propose (n) bath & (n) ac system @ 1/f. relocate laundry to garage @ 1/f. (n) skylightat 2/f kitchen, reconfigure (n) bath & closet @ 2/f. replace front window @ 2/f. change windows at rear to single hung. relocate shear wall @ rear to exterior. | |
| Mar 24, 2025 | Completed final sign-off Apr 2025 | 39 Bannan Pl | revision to pa 2024-0326-8620 construction revision for 39 brannan, 2nd fl with 4 additional windows replacement. infill opening. window replacement at bathroom and chaning from propsed casement window to single hung windowDetails
revision to pa 2024-0326-8620 construction revision for 39 brannan, 2nd fl with 4 additional windows replacement. infill opening. window replacement at bathroom and chaning from propsed casement window to single hung window | $4,000 |
| Jul 3, 2024 | In progress issued Jul 2024 | 30 Jules Av | 1/f: relocate & remodel (e) laundry room & (e) bathroom. remodel playroom & add (n) bedroom. reconfigure interior staircase. 2/f: convert left rear bedroom into master suite. relocate one (e) bedroom, (e) dining, & (e) living room. relocate & remodel (e) kitchen & (e) bathroom. new deck.Details
1/f: relocate & remodel (e) laundry room & (e) bathroom. remodel playroom & add (n) bedroom. reconfigure interior staircase. 2/f: convert left rear bedroom into master suite. relocate one (e) bedroom, (e) dining, & (e) living room. relocate & remodel (e) kitchen & (e) bathroom. new deck. | $200,000 |
| May 6, 2024 | In progress issued May 2024 | 665 Colby St | 1st/f:convert storage space to living space to include 3 bedroom/ 2baths 2nd fl (994 sf new habitable). 2nd/f: add 1 office, 1 bed room and 1 bath, 3 rd fl: add 1 bed room and 1 bathr reconfigiure master bed layout, skylight, windowsDetails
1st/f:convert storage space to living space to include 3 bedroom/ 2baths 2nd fl (994 sf new habitable). 2nd/f: add 1 office, 1 bed room and 1 bath, 3 rd fl: add 1 bed room and 1 bathr reconfigiure master bed layout, skylight, windows | $60,000 |
| Jan 31, 2024 | Completed final sign-off Mar 2025 | 2019 23rd Av | as built revision 201808308786 & 202107235020. add two skylights and replace two front windows on second fl. update (e) skylights and door swings (first fl). reconfigure first floor bathroom and rear stucoo to hardiboard. (no new fixtures)Details
as built revision 201808308786 & 202107235020. add two skylights and replace two front windows on second fl. update (e) skylights and door swings (first fl). reconfigure first floor bathroom and rear stucoo to hardiboard. (no new fixtures) | $15,000 |
| Jan 21, 2022 | Completed final sign-off Feb 2023 | 630 Joost Av | 1 bathroom remodel, no reparition. replace 6 front windows with wood windows integral og lugs, 3 rear windows. in-kind.Details
1 bathroom remodel, no reparition. replace 6 front windows with wood windows integral og lugs, 3 rear windows. in-kind. | $18,000 |
| Sep 3, 2021 | Never finaled issued Sep 2021, no final | 162 23rd Av | remodel (1) full bath w/(e) shower pan, remodel 1-1/2 bath, update electrical wiring, add insulation @ exterior wall, add recess lighting, replace drywall for wiring/insulation. non structural. lights per cec 150.0kDetails
remodel (1) full bath w/(e) shower pan, remodel 1-1/2 bath, update electrical wiring, add insulation @ exterior wall, add recess lighting, replace drywall for wiring/insulation. non structural. lights per cec 150.0k | $35,000 |
| Dec 10, 2019 | Never finaled issued Feb 2020, no final | 7719 Geary Bl | unit #3: interior remodel. convert living room to one office and add antoher office (total of 2), and one bath. remodel kitchen. convert master bedroom to office and smaller master bedroom. all work in unit #3 (top floor unit).Details
unit #3: interior remodel. convert living room to one office and add antoher office (total of 2), and one bath. remodel kitchen. convert master bedroom to office and smaller master bedroom. all work in unit #3 (top floor unit). | $10,000 |
| Nov 25, 2019 | Completed final sign-off Nov 2020 | 2407 Clement St | 2nd & 3rd floor: replace all window in kind with double pane windows, visible from the street to be wood windows. all others to be vinyl. update existing electrical line & fixtures at 3rd floor unit. relayout fixtures at the existing 3rd floor bathroom & add new full bath on 3rd floor.Details
2nd & 3rd floor: replace all window in kind with double pane windows, visible from the street to be wood windows. all others to be vinyl. update existing electrical line & fixtures at 3rd floor unit. relayout fixtures at the existing 3rd floor bathroom & add new full bath on 3rd floor. | $30,000 |
| Aug 28, 2019 | Completed final sign-off Mar 2020 | 715 Garfield St | remodel bathroom & kitchen, add recessed lights, smoke detectors, in-kindDetails
remodel bathroom & kitchen, add recessed lights, smoke detectors, in-kind | $50,000 |
| Jun 3, 2019 | Completed final sign-off Apr 2022 | 2191 39th Av | remodel 2nd floor bathroom, and upgrade wiring through out the house, add lights and electrical panel upgrade. replce laundry sink @ basement.Details
remodel 2nd floor bathroom, and upgrade wiring through out the house, add lights and electrical panel upgrade. replce laundry sink @ basement. | $18,000 |
| Feb 28, 2019 | Completed final sign-off Jun 2019 | 187 College Av | replace kitchen cabinet in-kind, (1) bath tub, (1) kitchen sink & reconnect gas range, no change of (e) floor planDetails
replace kitchen cabinet in-kind, (1) bath tub, (1) kitchen sink & reconnect gas range, no change of (e) floor plan | $28,000 |
| Feb 8, 2019 | Completed final sign-off Jun 2019 | 470 Grove St | remodel (1) bathroom. shower pan, sink replacement.Details
remodel (1) bathroom. shower pan, sink replacement. | $15,000 |
| Nov 14, 2018 | Never finaled issued Nov 2018, no final | 2800 Balboa St | remodel unit a, b and c kitchen (3), bathroom (3). upgrade 200 amp main panel.Details
remodel unit a, b and c kitchen (3), bathroom (3). upgrade 200 amp main panel. | $40,000 |
| Nov 13, 2018 | Expired or cancelled expired Feb 2026 | 407 Wilde Av | legalization of dwelling unit @ 1st flr per ord# 43-14 & planning code section 207.3. (n) adu included kitchen, bedrooms & baths.Details
legalization of dwelling unit @ 1st flr per ord# 43-14 & planning code section 207.3. (n) adu included kitchen, bedrooms & baths. | $15,000 |
| Aug 6, 2018 | Completed final sign-off Nov 2018 | 1655 Mission St | unit #1043: remodel bathroom - retile, replace fixtures in kindDetails
unit #1043: remodel bathroom - retile, replace fixtures in kind | $15,000 |
| Apr 18, 2018 | Completed final sign-off May 2019 | 110 Sagamore St | add (1) ada bathroom for barber shop on ground floor per plan. add (1) entertainment room, (1) bathroom, (1) employee resting room, (1) employee bathroom on the ground fl per plan. (entertainment room fro dwelling unit above. employee resting room for commercial unit).Details
add (1) ada bathroom for barber shop on ground floor per plan. add (1) entertainment room, (1) bathroom, (1) employee resting room, (1) employee bathroom on the ground fl per plan. (entertainment room fro dwelling unit above. employee resting room for commercial unit). | $68,000 |
| Dec 28, 2017 | Completed final sign-off Oct 2019 | 89 Stanyan Bl | convert (e) space on 1st floor to a bedroom, 2 full bathrooms and a family room.Details
convert (e) space on 1st floor to a bedroom, 2 full bathrooms and a family room. | $58,000 |
| Dec 18, 2017 | Completed final sign-off Apr 2018 | 1038 Girard St | remodel (1) kitchen and (2) bathrooms. electrical wiring upgrade. repair drywall and replace (1) furnaceDetails
remodel (1) kitchen and (2) bathrooms. electrical wiring upgrade. repair drywall and replace (1) furnace | $38,000 |
| Aug 2, 2017 | Never finaled issued Aug 2017, no final | 197 Joost Av | remodel 1 kitchen, 2 bathrooms, add lighting, and outlets, replace 4 windows, and 1 patio door in kind @ rear ground floor units, all work done @ basement unitDetails
remodel 1 kitchen, 2 bathrooms, add lighting, and outlets, replace 4 windows, and 1 patio door in kind @ rear ground floor units, all work done @ basement unit | $60,000 |
| Jul 12, 2017 | Completed final sign-off Oct 2019 | 91 Stanyan Bl | remodel (1) kitchen, (2) bathrooms, rewire electrical, replace rotten plumbing pipes, redrywall, add insulationDetails
remodel (1) kitchen, (2) bathrooms, rewire electrical, replace rotten plumbing pipes, redrywall, add insulation | $65,000 |
| Jul 12, 2017 | Completed final sign-off Oct 2019 | 89 Stanyan Bl | remodel (2) bathrooms, (1) kitchen, rewire electrical, replace plubming pipes, redrywall, add insulation, electrical main panel @ garage.Details
remodel (2) bathrooms, (1) kitchen, rewire electrical, replace plubming pipes, redrywall, add insulation, electrical main panel @ garage. | $65,000 |
| May 31, 2017 | Completed final sign-off May 2018 | 369 07th Av | remodel bathrooms for two units only, 369 and 373 07th ave. replace sinks, toilets, bathtubs, floor tiles and wall tiles, fan ventilationDetails
remodel bathrooms for two units only, 369 and 373 07th ave. replace sinks, toilets, bathtubs, floor tiles and wall tiles, fan ventilation | $10,000 |
| Apr 7, 2017 | Never finaled issued Apr 2017, no final | 758 33rd Av | replace and remodel two bathrooms. repair water leak at master bath shower. replace rotten plywood. retile and replace toilets and vanity at two bathroomsDetails
replace and remodel two bathrooms. repair water leak at master bath shower. replace rotten plywood. retile and replace toilets and vanity at two bathrooms | $22,000 |
| Sep 28, 2016 | Completed final sign-off May 2017 | 1002 Vicente St | interior renovation (electrical, plumbing, mechanicial upgrades), replace windows at southside (aluminum clad/wood) 12, add 1 addition bathroom in unit #1002 and #1004Details
interior renovation (electrical, plumbing, mechanicial upgrades), replace windows at southside (aluminum clad/wood) 12, add 1 addition bathroom in unit #1002 and #1004 | $80,000 |
| Jul 7, 2016 | Never finaled issued Jul 2016, no final | 569 Bright St | remodel kitchen and 1 bathroom, 1 powder room and redny wall, add insulation. add outlets and lights at 2nd floor.Details
remodel kitchen and 1 bathroom, 1 powder room and redny wall, add insulation. add outlets and lights at 2nd floor. | $28,000 |
| Feb 12, 2016 | Completed final sign-off Jun 2017 | 562 37th Av | unit #4 - remodel kitchen & bathroom, replace 2 windows in kind, same size & same opening. relocate fuse panel. no change to layout.Details
unit #4 - remodel kitchen & bathroom, replace 2 windows in kind, same size & same opening. relocate fuse panel. no change to layout. | $22,000 |
| Feb 12, 2016 | Completed final sign-off Jun 2017 | 562 37th Av | unit #2 - to comply w/nov #201692651 & 201696671 - remodel kitchen & bathroom, replace 2 rear windows in kind same size & same opening. relocate fuse panel. repair heater.Details
unit #2 - to comply w/nov #201692651 & 201696671 - remodel kitchen & bathroom, replace 2 rear windows in kind same size & same opening. relocate fuse panel. repair heater. | $22,000 |
| Feb 11, 2016 | Never finaled issued Mar 2016, no final | 167 Brussels St | revision to appl #200807176988 - 1st flr - change part of bedroom to home office, new hallway at garage. 2nd flr: relocate kitchen & living & bath rooms. cahnge living & nook to bedrooms, new shed (100 sf) at rear yard.Details
revision to appl #200807176988 - 1st flr - change part of bedroom to home office, new hallway at garage. 2nd flr: relocate kitchen & living & bath rooms. cahnge living & nook to bedrooms, new shed (100 sf) at rear yard. | $100 |
| Feb 10, 2016 | Completed final sign-off Jun 2016 | 1663 20th Av | convert a media room to add bathroom & bedroom, one entertainment room, one storage room on 1/f per plan. fill in beneath 2nd floor.Details
convert a media room to add bathroom & bedroom, one entertainment room, one storage room on 1/f per plan. fill in beneath 2nd floor. | $8,000 |
| Dec 31, 2015 | Completed final sign-off Feb 2016 | 2455 39th Av | remodel split bathroom to 1 full bathroom and 1 half bathroomDetails
remodel split bathroom to 1 full bathroom and 1 half bathroom | $12,000 |
| Dec 31, 2014 | Completed final sign-off Jan 2017 | 200 Bright St | change occupant from (e) barbar shop to group r-3 residential unit. approved variance case# 2013.1410v. construct 2 new bedrooms, 1 new kitchen, 1 new bathroom, relocate 1 bathroom. 2 storages. add furnance.Details
change occupant from (e) barbar shop to group r-3 residential unit. approved variance case# 2013.1410v. construct 2 new bedrooms, 1 new kitchen, 1 new bathroom, relocate 1 bathroom. 2 storages. add furnance. | $70,000 |
| Nov 3, 2014 | Completed final sign-off Jan 2022 | 21 Scotia Av | remodel kitchen & bathroom on 2nd floor. replace steel plumbing with copper. rewire old wiring to romex, replace garage broker sewer line.Details
remodel kitchen & bathroom on 2nd floor. replace steel plumbing with copper. rewire old wiring to romex, replace garage broker sewer line. | $12,000 |
| Oct 20, 2014 | Never finaled issued Feb 2015, no final | 167 Brussels St | revision to appl #2008.0717.6988 - open new exterior side door @ garage next to stair; relocate door @ 1st flr; new bathroom @ first (garage ) flr; new skylight @ dining @ 2nd flr; new skylight & door @ master bathroom.Details
revision to appl #2008.0717.6988 - open new exterior side door @ garage next to stair; relocate door @ 1st flr; new bathroom @ first (garage ) flr; new skylight @ dining @ 2nd flr; new skylight & door @ master bathroom. | $10,000 |
| Sep 23, 2014 | Completed final sign-off Mar 2017 | 1907 Lyon St | excavare from 7'-3" to 7'-6" basement ceiling height. infill light court & add bedrm, home office & full bath. replace window @ front. 1st fl-add powder rm. remove wall. 2nd fl-infill light well remodel master bath. add skylights to each bath.Details
excavare from 7'-3" to 7'-6" basement ceiling height. infill light court & add bedrm, home office & full bath. replace window @ front. 1st fl-add powder rm. remove wall. 2nd fl-infill light well remodel master bath. add skylights to each bath. | $40,000 |
| May 13, 2014 | Completed final sign-off Dec 2014 | 245 Pierce St | 3rd floor - convert existing closet to bathroom, adding sink, toilet & shower with plumbing, adding lights & exhaust fan.Details
3rd floor - convert existing closet to bathroom, adding sink, toilet & shower with plumbing, adding lights & exhaust fan. | $20,000 |
| Mar 12, 2014 | Never finaled issued Mar 2014, no final | 70 Derby St | to comply with complaint #201267762 & 201228721. re-tile 5 bathrooms, replace plumbing fixtures in kind at same location. replace em lights (12), repair window silk, sash.Details
to comply with complaint #201267762 & 201228721. re-tile 5 bathrooms, replace plumbing fixtures in kind at same location. replace em lights (12), repair window silk, sash. | $8,000 |
| Oct 21, 2013 | Never finaled issued Oct 2013, no final | 2293 Mission St | revision to app#201308023413. upgrade extg front entrance and add 2 bathrooms to ada accessible.Details
revision to app#201308023413. upgrade extg front entrance and add 2 bathrooms to ada accessible. | $30,000 |
| Mar 28, 2013 | Completed final sign-off Jan 2015 | 200 Bright St | remodel 1 kitchen and 2 bathrooms and laundry room at 1st floor. rewire the kitchen, 2 bathrooms, 3 bedrooms. replace kitchen sink, bathroomsinks and laundry room plumbing. replace 2 furnace and repolace sewer line at 1st floor. install furnace and ductwork.Details
remodel 1 kitchen and 2 bathrooms and laundry room at 1st floor. rewire the kitchen, 2 bathrooms, 3 bedrooms. replace kitchen sink, bathroomsinks and laundry room plumbing. replace 2 furnace and repolace sewer line at 1st floor. install furnace and ductwork. | $25,000 |
| May 13, 2010 | Completed final sign-off Aug 2010 | 27 Lakeshore Dr | remodel bathroom, change sink toilet, tile, add fan, replace tub into a shower, change window from 36" hx 30" w to 16"h x 30" w which is not visible from street.Details
remodel bathroom, change sink toilet, tile, add fan, replace tub into a shower, change window from 36" hx 30" w to 16"h x 30" w which is not visible from street. | $9,439 |
| Jan 22, 2009 | Completed final sign-off Mar 2009 | 219 Curtis St | 2nd floor remodel kitchen & bathroom & power room including upgrade electrical outlet at kitchen & bathroom area & upgrade plumbing.Details
2nd floor remodel kitchen & bathroom & power room including upgrade electrical outlet at kitchen & bathroom area & upgrade plumbing. | $15,000 |