Flores General Building
- Based in
- Oakland
- On San Francisco permits
- Aug 2013 to Aug 2026
- Last 24 months
- 12 permits filed
100 permits since 2000: 87 completed, 5 in progress, 7 never finaled, 1 expired or cancelled.
Of the 7 never-finaled permits, 2 are 3 to 5 years old, 3 are 5 to 10 years old, 2 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
76 kitchen remodel permits: 68 completed, 4 in progress, 4 never finaled. Typically 0 days from filing to permit and 108 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 3, 2026 | In progress issued Aug 2026 | 3358 16th St | unit 3358a- remodel kitchen and 2x bathroom fully, trench the rest of home for full electrical and plumbing upgrades. replace sheetrock, paint and flooring as needed. no wall or layout changes. in kind and like for like.Details
unit 3358a- remodel kitchen and 2x bathroom fully, trench the rest of home for full electrical and plumbing upgrades. replace sheetrock, paint and flooring as needed. no wall or layout changes. in kind and like for like. | $75,000 |
| Aug 3, 2026 | In progress issued Aug 2026 | 920 Broderick St | unit 920 1/2 - remodel kitchen and bathroom fully, trench the rest of home for full electrical and plumbing upgrades. replace sheetrock, paint and flooring as needed. no wall or layout changes. in kind and like for like.Details
unit 920 1/2 - remodel kitchen and bathroom fully, trench the rest of home for full electrical and plumbing upgrades. replace sheetrock, paint and flooring as needed. no wall or layout changes. in kind and like for like. | $65,000 |
| Jul 27, 2026 | In progress issued Sep 2026 | 3210 Gough St | renovation of unit 202 on 3d fl. new kitchen and bath locations. new bedroom, new bedroom egresss window facing gough. associated structural, plumbing, mech, elec. no chang to habitable area.Details
renovation of unit 202 on 3d fl. new kitchen and bath locations. new bedroom, new bedroom egresss window facing gough. associated structural, plumbing, mech, elec. no chang to habitable area. | $40,000 |
| Apr 23, 2026 | In progress issued Apr 2026 | 1957 Hayes St | remodel existing kitchen and 2 bathrooms, rewire entire unit. paint entire unit. refinish floors. replace existing electric wall heater in kind. no removal of any walls.Details
remodel existing kitchen and 2 bathrooms, rewire entire unit. paint entire unit. refinish floors. replace existing electric wall heater in kind. no removal of any walls. | $55,000 |
| Feb 9, 2026 | Completed final sign-off Jun 2026 | 3210 Gough St | unit 102: renovations - new kitchen and bathroom locations. new bedroom. new bedroom egress window facing gough st. associated structural, mechanical, electrical, and plumbing. no changes to habitable area.Details
unit 102: renovations - new kitchen and bathroom locations. new bedroom. new bedroom egress window facing gough st. associated structural, mechanical, electrical, and plumbing. no changes to habitable area. | $40,000 |
| Jan 8, 2026 | Completed final sign-off Apr 2026 | 1436 Waller St | complete remodel of kitchen & 2 bathrooms, 1 w/ shower pan, 1 w/ tub. complete electrical rewire, replace (e) wall heaters w/ new ones in kind. full repaint and floor installation and walls to be moved.Details
complete remodel of kitchen & 2 bathrooms, 1 w/ shower pan, 1 w/ tub. complete electrical rewire, replace (e) wall heaters w/ new ones in kind. full repaint and floor installation and walls to be moved. | $75,000 |
| Jul 21, 2025 | Completed final sign-off Sep 2025 | 1831 Larkin St | unit #1: remodel (e) kitchen & bathroom as is, no changes. trench unit for electrical/ upgrade entire unit elelctrical. replace (e) wall heaters in-kind. paint unit. no removal of wallsDetails
unit #1: remodel (e) kitchen & bathroom as is, no changes. trench unit for electrical/ upgrade entire unit elelctrical. replace (e) wall heaters in-kind. paint unit. no removal of walls | $49,000 |
| May 20, 2025 | Completed final sign-off Jul 2025 | 1255 Page St | unit 5: complete remodel for 1 kitchen. rewire unit, 5/8" type x sheetrock, where treches are done for electrical, and paint swap electrical (e) heaters for new same kind. only paint to be done in bathroom. no walls to be removed.Details
unit 5: complete remodel for 1 kitchen. rewire unit, 5/8" type x sheetrock, where treches are done for electrical, and paint swap electrical (e) heaters for new same kind. only paint to be done in bathroom. no walls to be removed. | $35,000 |
| Apr 21, 2025 | Completed final sign-off Jul 2025 | 3354 16th St | unit 3354 a- remodel kitchen and bathroom . rewire and replace flooring, drywall, paint and replace wall heaters like for like . no wall removal or layout change.Details
unit 3354 a- remodel kitchen and bathroom . rewire and replace flooring, drywall, paint and replace wall heaters like for like . no wall removal or layout change. | $56,000 |
| Jan 18, 2024 | Completed final sign-off Jan 2025 | 331 Frederick St | remodel kitchen and bathroom (e) require electrical and upgrade plumbing for kitchen and bath no walls to be movedDetails
remodel kitchen and bathroom (e) require electrical and upgrade plumbing for kitchen and bath no walls to be moved | $39,000 |
| Jan 17, 2024 | Completed final sign-off May 2025 | 276 Oak St | remodel kitchen and bathroom in kind, full electrical upgrade full unit remodel. no walls to be moved, no structural to be done. all work in kind. no framing.Details
remodel kitchen and bathroom in kind, full electrical upgrade full unit remodel. no walls to be moved, no structural to be done. all work in kind. no framing. | $87,000 |
| Jan 17, 2024 | Completed final sign-off May 2025 | 274 Oak St | full unit remodel. full kitchen and bathroom remodel as is. full electrical upgrade units. no walls to be moved. no structural to be done. comply with nov#: 202311531 repair fire damage siding per engineer report. all work in kind. no framing. all work in kind. no framing.Details
full unit remodel. full kitchen and bathroom remodel as is. full electrical upgrade units. no walls to be moved. no structural to be done. comply with nov#: 202311531 repair fire damage siding per engineer report. all work in kind. no framing. all work in kind. no framing. | $87,000 |
| Jan 4, 2024 | Completed final sign-off Jul 2024 | 277 Hickory St | to comply with nov# 202311463: full unit remodel full kitchen and bathroom remodel in kind full electrical upgrade, no walls to be moved, no structural to be doneDetails
to comply with nov# 202311463: full unit remodel full kitchen and bathroom remodel in kind full electrical upgrade, no walls to be moved, no structural to be done | $67,000 |
| Jan 4, 2024 | Completed final sign-off Sep 2024 | 279 Hickory St | to comply with nov# 202311463: full unit remodel full kitchen and bathroom remodel in kind full electrical upgrade, no walls to be moved, no structural to be doneDetails
to comply with nov# 202311463: full unit remodel full kitchen and bathroom remodel in kind full electrical upgrade, no walls to be moved, no structural to be done | $67,000 |
| Sep 28, 2023 | Completed final sign-off Jan 2024 | 501 Jersey St | unit #4: remodel 1 kitchen and 1 bathroom. no walls to be moved electrical upgrade to the entire unit.Details
unit #4: remodel 1 kitchen and 1 bathroom. no walls to be moved electrical upgrade to the entire unit. | $42,000 |
| Jul 21, 2023 | Completed final sign-off Jan 2024 | 260 Dolores St | remodel 3 bathrooms, 1 kitchen, rewire entire unit. plumbing upgrades to bathroom and kitchen. paint and floor refinish. no walls to be moved. no structural work to be done. inkindDetails
remodel 3 bathrooms, 1 kitchen, rewire entire unit. plumbing upgrades to bathroom and kitchen. paint and floor refinish. no walls to be moved. no structural work to be done. inkind | $59,000 |
| Jun 5, 2023 | Completed final sign-off Sep 2023 | 940 Leavenworth St | unit # 5: remodel kitchen in kind - replace cabinets, countertop, and floor tiles in kind. remodel bathroom in kind - replace floor tiles & toilet in kind. paint & refinish floors. electrical upgrade. no structural work. no floor layout change. no wall layout change.Details
unit # 5: remodel kitchen in kind - replace cabinets, countertop, and floor tiles in kind. remodel bathroom in kind - replace floor tiles & toilet in kind. paint & refinish floors. electrical upgrade. no structural work. no floor layout change. no wall layout change. | $49,000 |
| Jun 5, 2023 | Completed final sign-off Sep 2023 | 936 Leavenworth St | unit # 6: remodel kitchen in kind - replace cabinets, countertop, and floor tiles in kind. remodel bathroom in kind - replace floor tiles & toilet in kind. paint & refinish floors. electrical upgrade. no structural work. no floor layout change. no wall layout change.Details
unit # 6: remodel kitchen in kind - replace cabinets, countertop, and floor tiles in kind. remodel bathroom in kind - replace floor tiles & toilet in kind. paint & refinish floors. electrical upgrade. no structural work. no floor layout change. no wall layout change. | $49,000 |
| Jun 2, 2023 | Completed final sign-off Aug 2023 | 2299 Green St | complete kitchnen remodel, change peestal for vanity in bathroom. electrical upgrade for the entire apartment, paint, refinish floors. both in kind remodel of bath and kitchen.Details
complete kitchnen remodel, change peestal for vanity in bathroom. electrical upgrade for the entire apartment, paint, refinish floors. both in kind remodel of bath and kitchen. | $45,000 |
| Feb 10, 2023 | Completed final sign-off Aug 2024 | 1329 Bay St | remodel (2) bathrooms and kitchen moving no walls.Details
remodel (2) bathrooms and kitchen moving no walls. | $30,000 |
| Jan 25, 2023 | Completed final sign-off Apr 2023 | 650 Masonic Av | unit #12: remodel kitchen and bathroom as is, no layout change. no walls to be removed. kitchen gypboard removal, bathroom gyp and floor tile removal, no floor plywood.Details
unit #12: remodel kitchen and bathroom as is, no layout change. no walls to be removed. kitchen gypboard removal, bathroom gyp and floor tile removal, no floor plywood. | $32,000 |
| Jan 25, 2023 | Completed final sign-off Apr 2023 | 650 Masonic Av | unit #2: remodel kitchen and bathroom as is, no layout change no walls to be removed. kitch gypboard removal, bathroom gypboard and floor tile, no floor plywood removal.Details
unit #2: remodel kitchen and bathroom as is, no layout change no walls to be removed. kitch gypboard removal, bathroom gypboard and floor tile, no floor plywood removal. | $32,000 |
| Jan 17, 2023 | Completed final sign-off Aug 2024 | 1331 Bay St | remodel 2 baths and kitchen. no layout change. moving no walls.Details
remodel 2 baths and kitchen. no layout change. moving no walls. | $27,000 |
| Aug 8, 2022 | Completed final sign-off Dec 2022 | 1144 Clay St | unit #3: remodel kitchen and bathroom keeping same layout, all new plumbing and electrical upgrade for the unit. paint and refinish floors, not moving any walls.Details
unit #3: remodel kitchen and bathroom keeping same layout, all new plumbing and electrical upgrade for the unit. paint and refinish floors, not moving any walls. | $29,500 |
| Aug 4, 2022 | Completed final sign-off Oct 2022 | 29 Lapidge St | unit 3: complete remodel of kitchen and bathroom keeping the same lay out. no removal of walls . upgrade electrical paint refinish floorsDetails
unit 3: complete remodel of kitchen and bathroom keeping the same lay out. no removal of walls . upgrade electrical paint refinish floors | $29,000 |
| Feb 7, 2022 | Completed final sign-off Oct 2022 | 23 Belvedere St | (1) kitchen & (1.5) bathroom remodel. electrical upgrade, plumbing upgrade in kitchen & bathroom. no structural work to be done.Details
(1) kitchen & (1.5) bathroom remodel. electrical upgrade, plumbing upgrade in kitchen & bathroom. no structural work to be done. | $29,000 |
| Jan 7, 2022 | Completed final sign-off Sep 2022 | 535 Taylor St | 3rd fl: (unit 303) reconfigure interior layout w/ 1 bedroom, one bathroom, nook kitchen, dining living rooms.Details
3rd fl: (unit 303) reconfigure interior layout w/ 1 bedroom, one bathroom, nook kitchen, dining living rooms. | $20,000 |
| Nov 29, 2021 | Completed final sign-off May 2022 | 537 Baker St | complete kitchen remodel. complete bath remodel. upgrade electrical. refinish floors and paint. no structural work to be done. no moving walls.Details
complete kitchen remodel. complete bath remodel. upgrade electrical. refinish floors and paint. no structural work to be done. no moving walls. | $32,000 |
| Jul 27, 2021 | Completed final sign-off Oct 2021 | 535 Taylor St | #506. full kitchen and bathroom remodel. replace tub for shower. full electrical upgrae. no structural work to be done. no layout change, no stud wall framing demolition.Details
#506. full kitchen and bathroom remodel. replace tub for shower. full electrical upgrae. no structural work to be done. no layout change, no stud wall framing demolition. | $29,000 |
| Jul 27, 2021 | Completed final sign-off Oct 2021 | 535 Taylor St | #604. full kitchen and bathroom remodel. replace tub for shower. full electrical upgrae. no structural work to be done. no layout change, no stud wall framing demolition.Details
#604. full kitchen and bathroom remodel. replace tub for shower. full electrical upgrae. no structural work to be done. no layout change, no stud wall framing demolition. | $29,000 |
| Apr 8, 2021 | Completed final sign-off Jul 2021 | 535 Taylor St | #204 full kitchen and bathroom remodel, same layouts, replace tub for shower in the bathroom. complete electrical rewire. no wllas to be moved.Details
#204 full kitchen and bathroom remodel, same layouts, replace tub for shower in the bathroom. complete electrical rewire. no wllas to be moved. | $29,500 |
| Mar 3, 2021 | Never finaled issued Nov 2021, no final | 535 Taylor St | unit 201: add one bedroom. remodel kitchen.Details
unit 201: add one bedroom. remodel kitchen. | $20,000 |
| Feb 9, 2021 | Completed final sign-off Jun 2021 | 1733 Mcallister St | full kitchen remodel with same floor plan. full electrical upgrade. replace toilet, vanity, and floor in bath. refinish floor sand paint unit. no framing work, no structural work.Details
full kitchen remodel with same floor plan. full electrical upgrade. replace toilet, vanity, and floor in bath. refinish floor sand paint unit. no framing work, no structural work. | $28,000 |
| Dec 18, 2020 | Completed final sign-off Mar 2021 | 535 Taylor St | unit 404. remodel kitchen and bathroom in studio apartment. same layout. change tub for shower. rewire unit and upgrade subpanel. no walls to be removed.Details
unit 404. remodel kitchen and bathroom in studio apartment. same layout. change tub for shower. rewire unit and upgrade subpanel. no walls to be removed. | $30,000 |
| Oct 5, 2020 | Completed final sign-off Jun 2021 | 1787 Haight St | renovate (e) split bath. (n) bathroom additional interior work only. in-kind kitchen remodel. mep under separate permit.Details
renovate (e) split bath. (n) bathroom additional interior work only. in-kind kitchen remodel. mep under separate permit. | $85,000 |
| Jun 10, 2020 | Completed final sign-off Sep 2020 | 535 Taylor St | #602: remodel kitchen and bathroom in-kind. complete re-wire. swapping tub for shower. all walls to remain, no movement.Details
#602: remodel kitchen and bathroom in-kind. complete re-wire. swapping tub for shower. all walls to remain, no movement. | $29,000 |
| May 29, 2020 | Completed final sign-off Dec 2020 | 945 Scott St | renovation of existing apartment. new finishes at bedrooms and living room. new kitchen cabinets. renovate bathroom and add one bathroom.Details
renovation of existing apartment. new finishes at bedrooms and living room. new kitchen cabinets. renovate bathroom and add one bathroom. | $22,000 |
| Jan 31, 2020 | Completed final sign-off Jun 2020 | 650 Masonic Av | unit #4: interior remodel of apartment. removal of interior partition walls(non bearing); remodel of kitchen and bathroom.Details
unit #4: interior remodel of apartment. removal of interior partition walls(non bearing); remodel of kitchen and bathroom. | $40,900 |
| Dec 16, 2019 | Completed final sign-off Aug 2020 | 1144 Clay St | remodel kitchen and bathroom, rewire entire unit. change tub for shower. no structural work to be done. kitchen 10x12, bathroom 8x5Details
remodel kitchen and bathroom, rewire entire unit. change tub for shower. no structural work to be done. kitchen 10x12, bathroom 8x5 | $29,000 |
| Sep 13, 2019 | Completed final sign-off Jan 2020 | 1144 Clay St | unit 5: kitchen and bathroom remodel. rewire unit. change tub for shower. no structural work to be done. kitchen 10" 12", bathroom 8" x 5"Details
unit 5: kitchen and bathroom remodel. rewire unit. change tub for shower. no structural work to be done. kitchen 10" 12", bathroom 8" x 5" | $25,000 |
| Aug 12, 2019 | Completed final sign-off Sep 2019 | 776 41st Av | apt 1: remodel ofkitchen & bathroom, rewire entire unit, replace (e) electrical heater for same, remove tub in bathroom and convert to shower. paint and refinish floor for the studio unit.Details
apt 1: remodel ofkitchen & bathroom, rewire entire unit, replace (e) electrical heater for same, remove tub in bathroom and convert to shower. paint and refinish floor for the studio unit. | $25,000 |
| May 31, 2019 | Completed final sign-off Jul 2019 | 650 Masonic Av | unit 6 - interior remodel, removal of interior partition walls. relocation of kitchen per plans. bathroom remodel. no structural changes proposed. create a bedroomDetails
unit 6 - interior remodel, removal of interior partition walls. relocation of kitchen per plans. bathroom remodel. no structural changes proposed. create a bedroom | $25,000 |
| Jan 31, 2019 | Completed final sign-off Apr 2019 | 75 Langton St | kitchen & bathroom remodel, upgrade electrical, install new plumbing fixtures, replace (e) wall electric heaters in-kind, no structural work to be done.Details
kitchen & bathroom remodel, upgrade electrical, install new plumbing fixtures, replace (e) wall electric heaters in-kind, no structural work to be done. | $37,500 |
| Nov 13, 2018 | Completed final sign-off Mar 2019 | 1115 Polk St | unit #21 & #32: remodel (2) kitchen & (2) bathrooms, upgrade electrical for the unit. change fixtures in bathroom. no structural.Details
unit #21 & #32: remodel (2) kitchen & (2) bathrooms, upgrade electrical for the unit. change fixtures in bathroom. no structural. | $55,000 |
| May 14, 2018 | Completed final sign-off Aug 2018 | 1720 Golden Gate Av | unit #23 - kitchen and bathroom remodel. rewire unit, upgrade plumbing, change tub for shower. paint and new floorsDetails
unit #23 - kitchen and bathroom remodel. rewire unit, upgrade plumbing, change tub for shower. paint and new floors | $27,000 |
| May 14, 2018 | Completed final sign-off Aug 2018 | 1720 Golden Gate Av | unit #31 - kitchen and bathroom remodel. rewire unit, upgrade plumbing, change tub for shower. paint and new floorsDetails
unit #31 - kitchen and bathroom remodel. rewire unit, upgrade plumbing, change tub for shower. paint and new floors | $27,000 |
| May 14, 2018 | Completed final sign-off Aug 2018 | 1720 Golden Gate Av | unit #1 - kitchen and bathroom remodel. rewire unit, upgrade plumbing, change tub for shower. paint and new floorsDetails
unit #1 - kitchen and bathroom remodel. rewire unit, upgrade plumbing, change tub for shower. paint and new floors | $27,000 |
| Apr 2, 2018 | Completed final sign-off Nov 2018 | 42 Sumner St | addition of new bathroom. extg kitchen remodel and extg bathroom remodel.Details
addition of new bathroom. extg kitchen remodel and extg bathroom remodel. | $35,000 |
| Feb 27, 2018 | Completed final sign-off Mar 2019 | 1225 Taylor St | unit 401: remodel (e) kitchen & bathroom, upgrade electrical & plumbing, paint & refinish floors, no walls moved/removed/added/infilled. all (e) layouts to remain unchanged.Details
unit 401: remodel (e) kitchen & bathroom, upgrade electrical & plumbing, paint & refinish floors, no walls moved/removed/added/infilled. all (e) layouts to remain unchanged. | $29,000 |
| Feb 8, 2018 | Completed final sign-off Aug 2018 | 46 Sumner St | addition of new bathroom. remodel of (e) kitchen and (e) bathroomDetails
addition of new bathroom. remodel of (e) kitchen and (e) bathroom | $45,000 |
| Nov 20, 2017 | Completed final sign-off Feb 2018 | 1225 Taylor St | work in unit #404: remodel (e) kitchen and bathroom. re-wire unit. sheetrock, paint, and refinish floors.Details
work in unit #404: remodel (e) kitchen and bathroom. re-wire unit. sheetrock, paint, and refinish floors. | $25,000 |
| Aug 25, 2017 | Never finaled issued Feb 2018, no final | 3535 Fillmore St | units #103 & #202; remodel, install new bedroomn and bathroom for total of 2 bdroom & 2 bath in each unit: relocate non structural walls. relocate extg kitchen, renovate extg bath, new cabinets, appliances, finishes; new plumbing and electrical. n/a maher ordinanceDetails
units #103 & #202; remodel, install new bedroomn and bathroom for total of 2 bdroom & 2 bath in each unit: relocate non structural walls. relocate extg kitchen, renovate extg bath, new cabinets, appliances, finishes; new plumbing and electrical. n/a maher ordinance | $40,000 |
| Aug 7, 2017 | Never finaled issued Aug 2017, no final | 175 Alhambra St | #201 - removal of structural & non-structural walls, construction of new walls, construction/relocation of new kitchen, renovation of existing bath, construction of new bath & bedroom, new electrical & plumbing. n/a maher ordinanceDetails
#201 - removal of structural & non-structural walls, construction of new walls, construction/relocation of new kitchen, renovation of existing bath, construction of new bath & bedroom, new electrical & plumbing. n/a maher ordinance | $35,000 |
| May 18, 2017 | Completed final sign-off Oct 2017 | 753 44th Av | remodel kitchen and bathroom and upgrade electrical. enlrage bathroom by bumping it into bedroom closet area.Details
remodel kitchen and bathroom and upgrade electrical. enlrage bathroom by bumping it into bedroom closet area. | $27,000 |
| Mar 14, 2017 | Completed final sign-off May 2017 | 1225 Taylor St | unit 403: kitchen and bath remodel, upgrade electrical, paint, floor refinish.Details
unit 403: kitchen and bath remodel, upgrade electrical, paint, floor refinish. | $23,000 |
| Oct 24, 2016 | Completed final sign-off Feb 2017 | 902 Divisadero St | unit #203: remodel kitchen and bath, upgrade electrical, no wall changes.Details
unit #203: remodel kitchen and bath, upgrade electrical, no wall changes. | $28,000 |
| Oct 24, 2016 | Completed final sign-off Feb 2017 | 1850 Sacramento St | unit 105, complete kitchen and bath remodel, convert to 2 bedrooms, 1 bath, electrical upgrade. no change to unit sizeDetails
unit 105, complete kitchen and bath remodel, convert to 2 bedrooms, 1 bath, electrical upgrade. no change to unit size | $35,000 |
| Oct 24, 2016 | Completed final sign-off Dec 2016 | 902 Divisadero St | unit #102: remodel kitchen and bathroom, upgrade electrical, no changes on walls.Details
unit #102: remodel kitchen and bathroom, upgrade electrical, no changes on walls. | $25,000 |
| Aug 22, 2016 | Completed final sign-off Nov 2016 | 902 Divisadero St | #202: remodeling kitchen and bathroom, electrical upgrade. no changes on walls.Details
#202: remodeling kitchen and bathroom, electrical upgrade. no changes on walls. | $25,000 |
| Aug 22, 2016 | Completed final sign-off Nov 2016 | 1850 Sacramento St | convert unit 101 from studio to 1 bedroom configuration. no change to structural work relocate kitchen add new appliances, remodel kitchen, remodel bathroom.Details
convert unit 101 from studio to 1 bedroom configuration. no change to structural work relocate kitchen add new appliances, remodel kitchen, remodel bathroom. | $35,000 |
| Jun 9, 2016 | Completed final sign-off Mar 2017 | 175 Alhambra St | #304 - relocate kitchen per plan to add 2nd bedrooms, add a bathroom, removal of non-bearing walls. no exterior changes. n/a maher ordinanceDetails
#304 - relocate kitchen per plan to add 2nd bedrooms, add a bathroom, removal of non-bearing walls. no exterior changes. n/a maher ordinance | $30,000 |
| Jun 9, 2016 | Completed final sign-off Mar 2017 | 175 Alhambra St | #301 - relocate kitchen per plan to add 2nd bedroom, add a bathroom, removal of non-bearing walls. n/a maher ordinanceDetails
#301 - relocate kitchen per plan to add 2nd bedroom, add a bathroom, removal of non-bearing walls. n/a maher ordinance | $30,000 |
| Apr 13, 2016 | Completed final sign-off Aug 2016 | 902 Divisadero St | apt 103: replacement of kitchen appliances and cabinets. replacement of plmbg fixtures. new kitchen and 2 bathroom finishes and painting. partial removal of non-load bearing walls in kitchen & living room per plans.Details
apt 103: replacement of kitchen appliances and cabinets. replacement of plmbg fixtures. new kitchen and 2 bathroom finishes and painting. partial removal of non-load bearing walls in kitchen & living room per plans. | $25,000 |
| Mar 4, 2016 | Completed final sign-off Aug 2016 | 1850 Sacramento St | #102 - relocate kitchen to add a bedroom, rewire electrical, upgrade plumbing, sheetrock, paint, new cabinets & counters, refinish floors.Details
#102 - relocate kitchen to add a bedroom, rewire electrical, upgrade plumbing, sheetrock, paint, new cabinets & counters, refinish floors. | $29,000 |
| Dec 22, 2015 | Completed final sign-off Jul 2016 | 3586 Pierce St | interior renovation to kitchen, new cabinets, replace 1 window in place & enlarge 2 others, relocate & replace door to secondary exit, interior renovation of (e) bathroom. add new bath to second bedroom, new skylights in kitchen & new bath. n/a ordinance #155-13Details
interior renovation to kitchen, new cabinets, replace 1 window in place & enlarge 2 others, relocate & replace door to secondary exit, interior renovation of (e) bathroom. add new bath to second bedroom, new skylights in kitchen & new bath. n/a ordinance #155-13 | $100,000 |
| Nov 23, 2015 | Completed final sign-off Apr 2016 | 3535 Fillmore St | unit 303, add 1 bathroom, relocate kitchen, move non bearing walls, remodel (e) bathroom, drywall, paint & refinish floors. add bedroom where kitchenDetails
unit 303, add 1 bathroom, relocate kitchen, move non bearing walls, remodel (e) bathroom, drywall, paint & refinish floors. add bedroom where kitchen | $45,000 |
| Nov 23, 2015 | Never finaled issued Nov 2015, no final | 3535 Fillmore St | unit #201: convert (e) closet to bathroom, relocate kitchen, move non bearing walls, drywall, paint and refinish hardwood floors, convert (e) kitchen to office. maher naDetails
unit #201: convert (e) closet to bathroom, relocate kitchen, move non bearing walls, drywall, paint and refinish hardwood floors, convert (e) kitchen to office. maher na | $45,000 |
| Sep 15, 2015 | Completed final sign-off Jan 2016 | 3535 Fillmore St | remodel (e) kitchen & bathroom in unit 104. move non-bearing walls, electrical, plumbing, drywall, paint and floor refinish. add bathroomDetails
remodel (e) kitchen & bathroom in unit 104. move non-bearing walls, electrical, plumbing, drywall, paint and floor refinish. add bathroom | $30,000 |
| Apr 20, 2015 | Completed final sign-off Sep 2015 | 3535 Fillmore St | unit 302: update electrical and plumbing, relocate kitchen, add a bath, add laundry hook ups, paint, refinish floors. remove non load bearing walls to abate complaint 201480181Details
unit 302: update electrical and plumbing, relocate kitchen, add a bath, add laundry hook ups, paint, refinish floors. remove non load bearing walls to abate complaint 201480181 | $31,000 |
| Apr 17, 2015 | Completed final sign-off Jun 2015 | 1850 Sacramento St | unit #402: remodel to 2 bedrooms from 1 bedroom. convert existing kitchen and dining room to bedroom,remove closet and relocate kitchen to closet area per plan. complaint #201529691 under separate permit.Details
unit #402: remodel to 2 bedrooms from 1 bedroom. convert existing kitchen and dining room to bedroom,remove closet and relocate kitchen to closet area per plan. complaint #201529691 under separate permit. | $25,000 |
| Mar 16, 2015 | Completed final sign-off Sep 2015 | 3535 Fillmore St | update electrical & plumbing, relocate kitchen add a bathrom, add laundry hook up, paint, refinish floors, remove non-load bearing walls. turn existing kitchen and dining room into bedroomDetails
update electrical & plumbing, relocate kitchen add a bathrom, add laundry hook up, paint, refinish floors, remove non-load bearing walls. turn existing kitchen and dining room into bedroom | $32,000 |
| Jan 13, 2015 | Completed final sign-off Apr 2015 | 3571 16th St | unit 7: kitchen & bath remodel: electrical & plumbing upgrade, new subpanel, add a washer/dryer in (e) closet, cabinets, granite, drywall, paint, & new floors.Details
unit 7: kitchen & bath remodel: electrical & plumbing upgrade, new subpanel, add a washer/dryer in (e) closet, cabinets, granite, drywall, paint, & new floors. | $24,000 |
| Nov 10, 2014 | Completed final sign-off Mar 2015 | 3029 Franklin St | kitchen and bath remodel electrical upgrade, paint & floor refnish. adding plumbing hook ups for washer and dryer in kitchen, frame new wall.Details
kitchen and bath remodel electrical upgrade, paint & floor refnish. adding plumbing hook ups for washer and dryer in kitchen, frame new wall. | $20,000 |
| Mar 28, 2014 | Completed final sign-off Nov 2014 | 55 Red Rock Wy | unit 210 - kitchen & bath remodel, paint, install new flooring.Details
unit 210 - kitchen & bath remodel, paint, install new flooring. | $19,500 |
| Nov 8, 2013 | Completed final sign-off Dec 2013 | 1225 Taylor St | kitchen & bathroom remodel, electrical upgrade, paint, floor refinish. no change in wall configuration or windowsDetails
kitchen & bathroom remodel, electrical upgrade, paint, floor refinish. no change in wall configuration or windows | $17,500 |
| Aug 29, 2013 | Completed final sign-off Sep 2013 | 1888 Golden Gate Av | kitchen and bathroom remodel: add circuits for kitchen new cabinets & tile; addd gfi for bathroom, new vainity & toilet; paint entire unit.Details
kitchen and bathroom remodel: add circuits for kitchen new cabinets & tile; addd gfi for bathroom, new vainity & toilet; paint entire unit. | $17,500 |