Block 0214, lot 005
1225 Taylor St
- City’s use
- Multi-Family Residential
- Built
- 1913
- Stories
- 5
- Units
- 25
- Rooms
- 25 bathrooms
- Building
- 17,555 sq ft
- Lot
- 5,771 sq ft
- Zoning
- RM3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
43 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 1, 2021 | Completed final sign-off Mar 2022 | 1225 Taylor St | B-Side Inc. | unit 504 - rehabilitate (e) kitchen & bathroom; install washer & dryer. no removal of structural wallsDetails
unit 504 - rehabilitate (e) kitchen & bathroom; install washer & dryer. no removal of structural walls | $32,000 |
| Sep 1, 2021 | Completed final sign-off Mar 2022 | 1225 Taylor St | B-Side Inc. | unit 302 - rehabilitate (e) kitchen & bathroom; install washer & dryer. no removal of structural wallsDetails
unit 302 - rehabilitate (e) kitchen & bathroom; install washer & dryer. no removal of structural walls | $32,000 |
| Jul 21, 2021 | Expired or cancelled cancelled Oct 2021 | 1225 Taylor St | B-Side Inc. | unit 504- remodeling 1 kitchen and 1 bathroom. no fixture relocation, no wall removal/relocation, lighting to compy w/ cec 150(k)Details
unit 504- remodeling 1 kitchen and 1 bathroom. no fixture relocation, no wall removal/relocation, lighting to compy w/ cec 150(k) | $30,000 |
| Jul 21, 2021 | Expired or cancelled cancelled Oct 2021 | 1225 Taylor St | B-Side Inc. | unit 302- remodeling 1 kitchen and 1 bathroom. same location, no fixture relocation, no wall removal/relocation, lighting to comply w/cec 150(k)Details
unit 302- remodeling 1 kitchen and 1 bathroom. same location, no fixture relocation, no wall removal/relocation, lighting to comply w/cec 150(k) | $30,000 |
| Jul 2, 2021 | Completed final sign-off Sep 2021 | 1225 Taylor St | B-Side Inc. | revision to pa# 202106233012. reduce scope of work in kitchen. replace counter. replace (e) bath tub with new at same location inside bathroom. unit 201Details
revision to pa# 202106233012. reduce scope of work in kitchen. replace counter. replace (e) bath tub with new at same location inside bathroom. unit 201 | |
| Jun 23, 2021 | Completed final sign-off Sep 2021 | 1225 Taylor St | B-Side Inc. | unit #201: remodeling kitchen remodeling bathroomDetails
unit #201: remodeling kitchen remodeling bathroom | $25,000 |
| Dec 3, 2020 | Never finaled issued Dec 2020, no final | 1225 Taylor St | B-Side Inc. | unit#305: rehab bathroom, rehab kitchen. replace washer/dryer in kind. upgrade like. no structural work, no moving walls.Details
unit#305: rehab bathroom, rehab kitchen. replace washer/dryer in kind. upgrade like. no structural work, no moving walls. | $20,000 |
| Oct 21, 2020 | Completed final sign-off Oct 2021 | 1225 Taylor St | Hue & Cry Security System | voluntary upgrade of fire alarm like for like with additions of low frequency sounders in all sleeping areas to meet code 1103.7.6.1.Details
voluntary upgrade of fire alarm like for like with additions of low frequency sounders in all sleeping areas to meet code 1103.7.6.1. | $59,360 |
| Feb 20, 2020 | Never finaled issued Feb 2020, no final | 1225 Taylor St | street spaceDetails
street space | ||
| Feb 18, 2020 | Completed final sign-off May 2020 | 1225 Taylor St | B-Side Inc. | unit 303: replace washer/dryer upgrade like. no structural work, no moving walls. ventless unit.Details
unit 303: replace washer/dryer upgrade like. no structural work, no moving walls. ventless unit. | $5,000 |
| Jan 10, 2020 | Never finaled issued Jan 2020, no final | 1225 Taylor St | street spaceDetails
street space | ||
| Dec 20, 2019 | Completed final sign-off Jan 2020 | 1225 Taylor St | B-Side Inc. | unit 304. washer/dryer in a closet upgrade, no moving walls, no structural work.Details
unit 304. washer/dryer in a closet upgrade, no moving walls, no structural work. | $5,000 |
| Sep 9, 2019 | Never finaled issued Sep 2019, no final | 1225 Taylor St | street spaceDetails
street space | ||
| Aug 16, 2019 | Never finaled issued Aug 2019, no final | 1225 Taylor St | street spaceDetails
street space | ||
| Aug 16, 2019 | Never finaled issued Aug 2019, no final | 1225 Taylor St | B-Side Inc. | #301: install washer/dryer (e) closet. ventless combo unit. no alteration to walls. maintain fire rating.Details
#301: install washer/dryer (e) closet. ventless combo unit. no alteration to walls. maintain fire rating. | $5,000 |
| Jul 29, 2019 | Completed final sign-off Sep 2019 | 1225 Taylor St | B-Side Inc. | unit # 403: install ventless combo washer/dryer in kitchen. no alteration to walls. all plumbinhg work within the unit.Details
unit # 403: install ventless combo washer/dryer in kitchen. no alteration to walls. all plumbinhg work within the unit. | $5,000 |
| Jul 10, 2019 | Never finaled issued Jul 2019, no final | 1225 Taylor St | street spaceDetails
street space | ||
| Jul 9, 2019 | Never finaled issued Jul 2019, no final | 1225 Taylor St | B-Side Inc. | unit 204: install hook up for new washer and dryer in unit 204. no structuralDetails
unit 204: install hook up for new washer and dryer in unit 204. no structural | $5,000 |
| Apr 2, 2019 | Never finaled issued Apr 2019, no final | 1225 Taylor St | street spaceDetails
street space | ||
| Mar 29, 2019 | Completed final sign-off Apr 2019 | 1225 Taylor St | unit 405. install ventless washer / dryer in (e) closet.Details
unit 405. install ventless washer / dryer in (e) closet. | $4,000 | |
| Mar 22, 2019 | Completed final sign-off Apr 2019 | 1225 Taylor St | B-Side Inc. | uni t#401: install ventless washer/dryer in existing closet. maher n/aDetails
uni t#401: install ventless washer/dryer in existing closet. maher n/a | $4,000 |
| Feb 27, 2018 | Never finaled issued Feb 2018, no final | 1225 Taylor St | street spaceDetails
street space | ||
| Feb 27, 2018 | Completed final sign-off Mar 2019 | 1225 Taylor St | Flores General Building | unit 401: remodel (e) kitchen & bathroom, upgrade electrical & plumbing, paint & refinish floors, no walls moved/removed/added/infilled. all (e) layouts to remain unchanged.Details
unit 401: remodel (e) kitchen & bathroom, upgrade electrical & plumbing, paint & refinish floors, no walls moved/removed/added/infilled. all (e) layouts to remain unchanged. | $29,000 |
| Nov 20, 2017 | Completed final sign-off Feb 2018 | 1225 Taylor St | Flores General Building | work in unit #404: remodel (e) kitchen and bathroom. re-wire unit. sheetrock, paint, and refinish floors.Details
work in unit #404: remodel (e) kitchen and bathroom. re-wire unit. sheetrock, paint, and refinish floors. | $25,000 |
| Aug 18, 2017 | Completed final sign-off Sep 2017 | 1225 Taylor St | San Francisco Fire Protection | as builts to pa #201708043916 - convert existing dact to a new rf communicator. all existing alarm system components & sequence of operation shall remain unchanged. n/a maher ordinanceDetails
as builts to pa #201708043916 - convert existing dact to a new rf communicator. all existing alarm system components & sequence of operation shall remain unchanged. n/a maher ordinance | |
| Aug 4, 2017 | Completed final sign-off Sep 2017 | 1225 Taylor St | San Francisco Fire Protection | replace existing facp to accommodate new sprinkler system for the 1st floor. ref pa 2017-0607-8721. maher naDetails
replace existing facp to accommodate new sprinkler system for the 1st floor. ref pa 2017-0607-8721. maher na | $4,000 |
| Jul 17, 2017 | Never finaled issued Jul 2017, no final | 1225 Taylor St | street spaceDetails
street space | ||
| Jun 7, 2017 | Completed final sign-off Sep 2017 | 1225 Taylor St | Liberty Fire Systems Inc | 1st flr: add fire sprinklers at new dwelling unit and path of egress ref 201508063557 r1Details
1st flr: add fire sprinklers at new dwelling unit and path of egress ref 201508063557 r1 | $8,000 |
| May 5, 2017 | Never finaled issued May 2017, no final | 1225 Taylor St | street spaceDetails
street space | ||
| Mar 14, 2017 | Completed final sign-off May 2017 | 1225 Taylor St | Flores General Building | unit 403: kitchen and bath remodel, upgrade electrical, paint, floor refinish.Details
unit 403: kitchen and bath remodel, upgrade electrical, paint, floor refinish. | $23,000 |
| Feb 10, 2017 | Completed final sign-off Jun 2017 | 1225 Taylor St | S L M Development Inc. | revision to original pa#201608225631, strong wall layout, shear wall, holdown. n/a ordinance #155-13Details
revision to original pa#201608225631, strong wall layout, shear wall, holdown. n/a ordinance #155-13 | |
| Aug 22, 2016 | Completed final sign-off May 2017 | 1225 Taylor St | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4 n/a for maherDetails
soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4 n/a for maher | $50,000 | |
| Feb 4, 2016 | Completed final sign-off Mar 2016 | 1225 Taylor St | 21st Century Home Improvt | unit #407 remodel kitchen & bathroom. no walls moved, removed added or infilled. all (e) layouts to remain unchanged. n/a for maher.Details
unit #407 remodel kitchen & bathroom. no walls moved, removed added or infilled. all (e) layouts to remain unchanged. n/a for maher. | $30,000 |
| Aug 6, 2015 | Completed final sign-off Sep 2017 | 1225 Taylor St | S L M Development Inc. | unit legalization ordinance 43-14. legalization of unwarranted unit. for a total of 25 units. unit to be fully remodeled. ** maher: compliance with ordinance no# 155-13 not required **Details
unit legalization ordinance 43-14. legalization of unwarranted unit. for a total of 25 units. unit to be fully remodeled. ** maher: compliance with ordinance no# 155-13 not required ** | $50,000 |
| Apr 13, 2015 | Completed final sign-off May 2015 | 1225 Taylor St | 21st Century Home Improvt | unit# 304 remodel kitchen, replace bathroom sink & toilet & floor tile. no structural work. no wall modification. n/a for maher.Details
unit# 304 remodel kitchen, replace bathroom sink & toilet & floor tile. no structural work. no wall modification. n/a for maher. | $24,000 |
| Apr 13, 2015 | Completed final sign-off May 2015 | 1225 Taylor St | 21st Century Home Improvt | unit# 204. remodel kitchen, replace bathroom sink & toilet & floor tile. no structural work. no wall modification. n/a for maher.Details
unit# 204. remodel kitchen, replace bathroom sink & toilet & floor tile. no structural work. no wall modification. n/a for maher. | $24,000 |
| Jun 6, 2014 | Completed final sign-off Jun 2014 | 1225 Taylor St | Make Ready Maintenance Inc | revision to 201405054928. install 3x3 landing on exterior deck. compliance with ord 155-13 not requiredDetails
revision to 201405054928. install 3x3 landing on exterior deck. compliance with ord 155-13 not required | $200 |
| May 5, 2014 | Completed final sign-off Jun 2014 | 1225 Taylor St | Make Ready Maintenance Inc | change to a window to an exterior door at the back of the house of studio #307. construct a rear deck about 29" from grade. to comply with complaint 201468524. maher n/a.Details
change to a window to an exterior door at the back of the house of studio #307. construct a rear deck about 29" from grade. to comply with complaint 201468524. maher n/a. | $5,000 |
| Apr 8, 2014 | Completed final sign-off Jun 2014 | 1225 Taylor St | Make Ready Maintenance Inc | kitchen and bathroom remodel, unit #301 and 307; no walls to be removed, work to only be done in units 301 and 307, no changes to windows or doors; compliance with ord 155-13 not requiredDetails
kitchen and bathroom remodel, unit #301 and 307; no walls to be removed, work to only be done in units 301 and 307, no changes to windows or doors; compliance with ord 155-13 not required | $20,000 |
| Nov 8, 2013 | Completed final sign-off Dec 2013 | 1225 Taylor St | Flores General Building | kitchen & bathroom remodel, electrical upgrade, paint, floor refinish. no change in wall configuration or windowsDetails
kitchen & bathroom remodel, electrical upgrade, paint, floor refinish. no change in wall configuration or windows | $17,500 |
| Sep 18, 2013 | Completed final sign-off Oct 2013 | 1225 Taylor St | Gaitan Construction | basic like for like bathroom & kitchen remodel, paint, floor refinishDetails
basic like for like bathroom & kitchen remodel, paint, floor refinish | $18,000 |
| Oct 15, 2004 | Completed final sign-off Nov 2004 | 1225 Taylor St | The Lawson Roofing Co Inc. | reroofingDetails
reroofing | $19,711 |
| Sep 3, 2004 | Never finaled issued Sep 2004, no final | 1225 Taylor St | street spaceDetails
street space |