Gaitan Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2005 to Jun 2018
- Last 24 months
- 0 permits filed
48 permits since 2000: 40 completed, 5 never finaled, 3 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 19, 2018 | Completed final sign-off Jun 2018 | 215 San Carlos St | to comply with physical inspection report cc-8273Details
to comply with physical inspection report cc-8273 | $5,200 |
| Feb 24, 2017 | Completed final sign-off Jun 2018 | 2041 Hyde St | revision to permit 201410108632 remove all scope of work unit 2043Details
revision to permit 201410108632 remove all scope of work unit 2043 | |
| Jul 8, 2016 | Completed final sign-off Aug 2018 | 1912 Golden Gate Av | excavate for full height 1st flr. 2nd flr renovation. in-fill (e) interior courtDetails
excavate for full height 1st flr. 2nd flr renovation. in-fill (e) interior court | $50,000 |
| Jan 12, 2016 | Completed final sign-off Jun 2018 | 2047 Hyde St | interior remodel of unit 2041 - 2nd floor unit. remodel (e) bathroom, kitchen & add (1) bathroom.Details
interior remodel of unit 2041 - 2nd floor unit. remodel (e) bathroom, kitchen & add (1) bathroom. | $37,000 |
| Oct 21, 2015 | Completed final sign-off Dec 2016 | 2440 24th St | remodel of upper cond includding new mstr bath, remodel (e) bathroom, general upgrade of moulding, new kitchen island, some replacement windows- not visible from street, minor elec work - new lights & interior paint. no structural, mech or exterior workDetails
remodel of upper cond includding new mstr bath, remodel (e) bathroom, general upgrade of moulding, new kitchen island, some replacement windows- not visible from street, minor elec work - new lights & interior paint. no structural, mech or exterior work | $75,000 |
| Apr 30, 2015 | Completed final sign-off May 2016 | 663 21st Av | work at upper level: convert sewing room into bathroomDetails
work at upper level: convert sewing room into bathroom | $15,000 |
| Nov 13, 2014 | Never finaled issued Nov 2014, no final | 601 Van Ness Av | remodel (8) shower stalls: replace w/pre-fab shower pan & tile walls, paint. all work to be done in the men's (4) and women's (4) gym.Details
remodel (8) shower stalls: replace w/pre-fab shower pan & tile walls, paint. all work to be done in the men's (4) and women's (4) gym. | $28,000 |
| Oct 10, 2014 | Completed final sign-off Jun 2018 | 2041 Hyde St | interior remodel of unit 2045 and 2043. remodel e bath and kitchens. 2 new baths. new windows throughout. at front, windows to be aluminum-cladDetails
interior remodel of unit 2045 and 2043. remodel e bath and kitchens. 2 new baths. new windows throughout. at front, windows to be aluminum-clad | $60,000 |
| Sep 29, 2014 | Completed final sign-off Jun 2018 | 2041 Hyde St | new roof deck, new stair to roof from top floor unit. lateral upgrade under the new roof deck and voluntary lateral strengthening at 2 levels.Details
new roof deck, new stair to roof from top floor unit. lateral upgrade under the new roof deck and voluntary lateral strengthening at 2 levels. | $15,000 |
| Feb 3, 2014 | Never finaled issued Feb 2014, no final | 601 Van Ness Av | patch work after electrical work at elevator lobby area, reinforce under new counter tops located at elevator lobbies; compliance with ord 155-13 not requiredDetails
patch work after electrical work at elevator lobby area, reinforce under new counter tops located at elevator lobbies; compliance with ord 155-13 not required | $10,000 |
| Sep 20, 2013 | Never finaled issued Sep 2013, no final | 1441 Montgomery St | unit #1-remodel including new kitchen, bathroom & general upgrades of finishes inside including painting & re finishing floors & new lightingDetails
unit #1-remodel including new kitchen, bathroom & general upgrades of finishes inside including painting & re finishing floors & new lighting | $45,000 |
| Sep 18, 2013 | Completed final sign-off Oct 2013 | 1225 Taylor St | basic like for like bathroom & kitchen remodel, paint, floor refinishDetails
basic like for like bathroom & kitchen remodel, paint, floor refinish | $18,000 |
| Sep 6, 2013 | Completed final sign-off May 2014 | 957 Hayes St | unit #4-reconfigure interior of (e) apartment. new kitchen, 2 new baths, new wallboard, new elec, new plmg, new doors. replace (e) footings, posts & beams. no windowsDetails
unit #4-reconfigure interior of (e) apartment. new kitchen, 2 new baths, new wallboard, new elec, new plmg, new doors. replace (e) footings, posts & beams. no windows | $50,000 |
| Jul 17, 2013 | Completed final sign-off Jan 2014 | 957 Hayes St | unit#9:revised scope to app#201303263023. show kitchen moved location. removed optional braced wall. detail (now no braced walls added). all new drywall moved location of 1 bedroom. (no other revisions)Details
unit#9:revised scope to app#201303263023. show kitchen moved location. removed optional braced wall. detail (now no braced walls added). all new drywall moved location of 1 bedroom. (no other revisions) | |
| Jul 17, 2013 | Completed final sign-off May 2014 | 957 Hayes St | unit #2: revise scope of work per app#201304164704 to show moved kitchen to different area. delete w/d hookup in hall. delete optional braced wallDetails
unit #2: revise scope of work per app#201304164704 to show moved kitchen to different area. delete w/d hookup in hall. delete optional braced wall | |
| Apr 11, 2013 | Completed final sign-off Sep 2014 | 2430 Lake St | remodel kitchen & 2 bathrooms. refinish floors & paint. not adding or moving wallsDetails
remodel kitchen & 2 bathrooms. refinish floors & paint. not adding or moving walls | $25,000 |
| Mar 26, 2013 | Completed final sign-off Jan 2014 | 957 Hayes St | unit #9: 1) remodel 2 bathrooms,2)remodel kitchen, 3)all new electrical,4 new plmg fixtures, 5) install insulation to opened walls, 6) repair/replace hardwood floors, 7)new tile in bathrooms, 8)add stacked washer/dryer,9)replace extg furnace.Details
unit #9: 1) remodel 2 bathrooms,2)remodel kitchen, 3)all new electrical,4 new plmg fixtures, 5) install insulation to opened walls, 6) repair/replace hardwood floors, 7)new tile in bathrooms, 8)add stacked washer/dryer,9)replace extg furnace. | $50,000 |
| Mar 20, 2013 | Completed final sign-off May 2013 | 1888 Golden Gate Av | complete bathroom & kitchen remodel: replace all wall coverings, plumbing, electrical, cabinets, tile, fixtures etc. upgrade electrical panel, painting & refinish hardwood floorsDetails
complete bathroom & kitchen remodel: replace all wall coverings, plumbing, electrical, cabinets, tile, fixtures etc. upgrade electrical panel, painting & refinish hardwood floors | $18,000 |
| Jan 10, 2013 | Completed final sign-off May 2013 | 2430 Lake St | work in unit #7 only - renovate kitchen & (2) bathrooms, refinish hardwood floors, paint, on wall/partition change.Details
work in unit #7 only - renovate kitchen & (2) bathrooms, refinish hardwood floors, paint, on wall/partition change. | $25,000 |
| Nov 28, 2012 | Completed final sign-off Aug 2013 | 571 Minna St | demo to comply with viloation # 201228521. two units, on ground floor.Details
demo to comply with viloation # 201228521. two units, on ground floor. | $26,500 |
| Nov 14, 2012 | Completed final sign-off Jan 2013 | 115 Haight St | unit #11-complete 1 bathroom & kitchen remodel-replace all wall coverings, electrical & plumbing, fixtures, etc. upgrade electrical panel. no window, door, ceiling, floor or wall work on this permit except as noted aboveDetails
unit #11-complete 1 bathroom & kitchen remodel-replace all wall coverings, electrical & plumbing, fixtures, etc. upgrade electrical panel. no window, door, ceiling, floor or wall work on this permit except as noted above | $20,000 |
| Nov 6, 2012 | Completed final sign-off May 2014 | 957 Hayes St | complete bathroom & kitchen remodel. relace all wall coverings electtical, plumbing cabinets, fixtures etc. upgrade electrical panel, install harwood flooring throughout the unit & painting unit #2Details
complete bathroom & kitchen remodel. relace all wall coverings electtical, plumbing cabinets, fixtures etc. upgrade electrical panel, install harwood flooring throughout the unit & painting unit #2 | $18,000 |
| Sep 10, 2012 | Completed final sign-off Nov 2012 | 601 Van Ness Av | installtion of fan in mens bathroom, replacement of fan in womens bathroom install dedicated circuit for both fans,& install motion sensors for fans. replace under sink plumbing (graps) repair work to walls from installation for work in # 2045Details
installtion of fan in mens bathroom, replacement of fan in womens bathroom install dedicated circuit for both fans,& install motion sensors for fans. replace under sink plumbing (graps) repair work to walls from installation for work in # 2045 | $2,000 |
| Jun 14, 2012 | Expired or cancelled expired Dec 2014 | 1932 Jefferson St | bathroom remodel:replace of shower valve, wall tiles, install gfci and switch, vanity and top, toilet, light, and floor tile. light shall be high efficacy unless conrolled by manual on occupancy sensors cec 150 (k)10Details
bathroom remodel:replace of shower valve, wall tiles, install gfci and switch, vanity and top, toilet, light, and floor tile. light shall be high efficacy unless conrolled by manual on occupancy sensors cec 150 (k)10 | $10,000 |
| Apr 9, 2012 | Completed final sign-off Apr 2012 | 1 Daniel Burnham Ct | to obtain final inspection for work approved under pa#2010-04-02-9561. all work is complete.Details
to obtain final inspection for work approved under pa#2010-04-02-9561. all work is complete. | $600 |
| Feb 15, 2012 | Completed final sign-off Apr 2012 | 601 Van Ness Av | remodel 1 kitchen, like for like cabinetry, install appliances and counters. lighting to comply with cec150(k).Details
remodel 1 kitchen, like for like cabinetry, install appliances and counters. lighting to comply with cec150(k). | $9,000 |
| Jan 18, 2012 | Completed final sign-off Apr 2012 | 601 Van Ness Av | kitchen remodel: like for like replacement, cabinets, appliances, counters, lights and switch/receptacles. bathroom remodel: replace tub, tile shower valve, fan & fixtures. no window, door, wall on ceiling work. (n) lighting comply with cec150(k), no structural work.Details
kitchen remodel: like for like replacement, cabinets, appliances, counters, lights and switch/receptacles. bathroom remodel: replace tub, tile shower valve, fan & fixtures. no window, door, wall on ceiling work. (n) lighting comply with cec150(k), no structural work. | $16,000 |
| Nov 29, 2011 | Completed final sign-off Feb 2012 | 1 Daniel Burnham Ct | bathroom - replace shower & tile, replace fan with all like items. toilet & tub & sink. kitchen - replace cabinets & appliances with like items & sink. bring electrical up to code. no change on walls.Details
bathroom - replace shower & tile, replace fan with all like items. toilet & tub & sink. kitchen - replace cabinets & appliances with like items & sink. bring electrical up to code. no change on walls. | $18,000 |
| Sep 2, 2011 | Completed final sign-off Nov 2011 | 1 Daniel Burnham Ct | kitchen remodel at unit #222: remove & replace cabinets, counter tops, appliancies like for like. no wall removal or relocation. a minimum of 50% of the total rated wattage of permanently installed lighting in kitchens shall be high efficacy.Details
kitchen remodel at unit #222: remove & replace cabinets, counter tops, appliancies like for like. no wall removal or relocation. a minimum of 50% of the total rated wattage of permanently installed lighting in kitchens shall be high efficacy. | $9,000 |
| Mar 24, 2011 | Completed final sign-off Sep 2011 | 720 York St | replacement of tub and tiles (walls), heater/fan, gfci & switch. (n) lighting comply with cec 150(k), no moving or adding walls.Details
replacement of tub and tiles (walls), heater/fan, gfci & switch. (n) lighting comply with cec 150(k), no moving or adding walls. | $8,000 |
| Oct 15, 2010 | Completed final sign-off Feb 2011 | 601 Van Ness Av | unit #78 on 4/f - like/like kitchen remodel: replacement of cabinets, counter and flooring, add receptacles and recessed lighting.Details
unit #78 on 4/f - like/like kitchen remodel: replacement of cabinets, counter and flooring, add receptacles and recessed lighting. | $9,000 |
| Sep 21, 2010 | Completed final sign-off Sep 2011 | 1628 Vallejo St | bathroom remodel - replacement of shower tile and pan, exhaust and gfci lighting comply cec 150 (k) high efficacy lighting or occupancy sensor. no change to exhaust system.Details
bathroom remodel - replacement of shower tile and pan, exhaust and gfci lighting comply cec 150 (k) high efficacy lighting or occupancy sensor. no change to exhaust system. | $13,000 |
| Jun 8, 2010 | Never finaled issued Jun 2010, no final | 601 Van Ness Av | unit #1109: bathoom remodel: replacing tub with free form shower, tile entire bathroom, replace all fixtures; toilet sink, light fixtures, med. cab., etc.Details
unit #1109: bathoom remodel: replacing tub with free form shower, tile entire bathroom, replace all fixtures; toilet sink, light fixtures, med. cab., etc. | $13,000 |
| Apr 2, 2010 | Never finaled issued Apr 2010, no final | 1 Daniel Burnham Ct | unit #724 - removal of existing tub & tile, & fixtures. install new tub, tile in entire bahtroom & installation of all new fixtures. bathroom remodel, no wall removal. area:5'-6"x9' no windows and no doors and no new wall work on this permit.Details
unit #724 - removal of existing tub & tile, & fixtures. install new tub, tile in entire bahtroom & installation of all new fixtures. bathroom remodel, no wall removal. area:5'-6"x9' no windows and no doors and no new wall work on this permit. | $9,000 |
| Feb 3, 2010 | Completed final sign-off Apr 2010 | 1 Daniel Burnham Ct | unit #102- remodel kitchen: cabinet replacement, outlets/gfci under sink plbg, like for like; remodel bathroom: repalcement of tub, tile wall & floor, vanity & sink, toilet, like for like.Details
unit #102- remodel kitchen: cabinet replacement, outlets/gfci under sink plbg, like for like; remodel bathroom: repalcement of tub, tile wall & floor, vanity & sink, toilet, like for like. | $20,000 |
| Jun 30, 2008 | Completed final sign-off Sep 2008 | 601 Van Ness Av | work @ unit# 230 only. kitchen remodel. cabinet & counter top replacement, keepsame layout. replace light & appliances. min 50% of kitchen watt in fluorescent. bathroom remodel. replace shower / tub unit with cast iron tub & tile. replace all fixtures & light. fluorescent or o.s. in bathroom.Details
work @ unit# 230 only. kitchen remodel. cabinet & counter top replacement, keepsame layout. replace light & appliances. min 50% of kitchen watt in fluorescent. bathroom remodel. replace shower / tub unit with cast iron tub & tile. replace all fixtures & light. fluorescent or o.s. in bathroom. | $25,000 |
| Jun 2, 2008 | Completed final sign-off Sep 2008 | 601 Van Ness Av | work @ unit# 330 only. removal of tub & fixtures. replace tub, fixtures & tile installation. bathroom remodel. replace light fixtures & light switches & gfci.Details
work @ unit# 330 only. removal of tub & fixtures. replace tub, fixtures & tile installation. bathroom remodel. replace light fixtures & light switches & gfci. | $8,000 |
| Feb 26, 2008 | Completed final sign-off Jun 2008 | 601 Van Ness Av | remove of shower tub unit, replace toilet, shower value, and vanity install cast iron tub. tile and new fixtures. at bathroom @ #311Details
remove of shower tub unit, replace toilet, shower value, and vanity install cast iron tub. tile and new fixtures. at bathroom @ #311 | $9,500 |
| Dec 10, 2007 | Completed final sign-off Jun 2008 | 1749 Polk St | work on unit#4,#5,#8. kitchen cabinet replacement & bathroom tile replacement only on all three units, painting & floor refinished. light fixture replacement and under sink plumbing.Details
work on unit#4,#5,#8. kitchen cabinet replacement & bathroom tile replacement only on all three units, painting & floor refinished. light fixture replacement and under sink plumbing. | $36,000 |
| Dec 10, 2007 | Completed final sign-off Feb 2008 | 601 Van Ness Av | renew pa#200705211819 for final inspection.Details
renew pa#200705211819 for final inspection. | |
| Aug 22, 2007 | Completed final sign-off Feb 2008 | 601 Van Ness Av | removal of tub/sshower unit and replace with concrete construction shower, tile walls, floor & shower base. replace outlets (gfci) and dlight fixture. fluorescent or manual on auto off switch.Details
removal of tub/sshower unit and replace with concrete construction shower, tile walls, floor & shower base. replace outlets (gfci) and dlight fixture. fluorescent or manual on auto off switch. | $8,500 |
| May 21, 2007 | Completed final sign-off Feb 2008 | 601 Van Ness Av | removal of tub/shower unit and replaced/ w concrete construction shower tile walls and shower base.Details
removal of tub/shower unit and replaced/ w concrete construction shower tile walls and shower base. | $8,500 |
| Feb 9, 2007 | Completed final sign-off Apr 2007 | 54 Pearl St | relation to physical inspection: 3r-4683, to comply with 3r report #3r-4683.Details
relation to physical inspection: 3r-4683, to comply with 3r report #3r-4683. | $1,200 |
| Nov 27, 2006 | Completed final sign-off Jan 2007 | 601 Van Ness Av | kitchen cabinets and countertop replacement to granite, floor replacement from linoleum to hardwood floor lainate flooring. new lighting to be flourescentDetails
kitchen cabinets and countertop replacement to granite, floor replacement from linoleum to hardwood floor lainate flooring. new lighting to be flourescent | $8,500 |
| Oct 24, 2006 | Completed final sign-off Nov 2006 | 1539 10th Av | countertop replacment in kitchen with granite. to existing capbints and under sink plumbing. repairs to walls from tile back splash removalDetails
countertop replacment in kitchen with granite. to existing capbints and under sink plumbing. repairs to walls from tile back splash removal | $2,300 |
| Feb 2, 2006 | Expired or cancelled expired May 2007 | 4540 California St | complete kitchen remodel: new cabs, ceramic tile flooring new lighting. complete bathroom remodel: new fixtures, lighting, tile comply with his nov#200561591 & 3200562075 date 7-6-05 & 8-15-05.Details
complete kitchen remodel: new cabs, ceramic tile flooring new lighting. complete bathroom remodel: new fixtures, lighting, tile comply with his nov#200561591 & 3200562075 date 7-6-05 & 8-15-05. | $36,000 |
| Oct 6, 2005 | Expired or cancelled expired May 2007 | 4540 California St | removal of (e)kitchen cabinets & linoleum flooring.replace w/new cabs,ceramic tile flooring,new lighting - kitchen.removal of (e)tile,fixtures,sink,toilet,shower valves & replace with new tile & fixtures,new lighting-bathroom. to comply nov #200560283Details
removal of (e)kitchen cabinets & linoleum flooring.replace w/new cabs,ceramic tile flooring,new lighting - kitchen.removal of (e)tile,fixtures,sink,toilet,shower valves & replace with new tile & fixtures,new lighting-bathroom. to comply nov #200560283 | $48,000 |
| Apr 18, 2005 | Completed final sign-off Sep 2005 | 56 Pearl St | removal of old kitchen cabinets & replaced; installation of ceramic flr tiles; installation of graniDetails
removal of old kitchen cabinets & replaced; installation of ceramic flr tiles; installation of grani | $7,500 |