Back to kitchen remodel contractors
Cronin Construction & Development Inc.
- Based in
- San Francisco
- On San Francisco permits
- Mar 2008 to Oct 2025
- Last 24 months
- 2 permits filed
99 permits since 2000: 72 completed, 2 in progress, 19 never finaled, 6 expired or cancelled.
Of the 19 never-finaled permits, 6 are 5 to 10 years old, 13 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
27 kitchen remodel permits: 21 completed, 6 never finaled. Typically 0 days from filing to permit and 139 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 7, 2023 | Completed final sign-off May 2023 | 3226 18th St | remodel kitchen, bathroom & powder room. install hardwood floor. replace 10 window and repair extg wood siding on rear st bldg. windows same size, same location, max u factor 0.30Details
remodel kitchen, bathroom & powder room. install hardwood floor. replace 10 window and repair extg wood siding on rear st bldg. windows same size, same location, max u factor 0.30 | $65,000 |
| Mar 11, 2021 | Never finaled issued Aug 2021, no final | 148 Otsego Av | build 742 sqft habitable space at ground floor. excavade 1' to achieve 8' ceiling height. upgrade electrical. remodel kitchen/dining at 2nd fl.Details
build 742 sqft habitable space at ground floor. excavade 1' to achieve 8' ceiling height. upgrade electrical. remodel kitchen/dining at 2nd fl. | $180,000 |
| Mar 23, 2018 | Completed final sign-off Oct 2018 | 436 Castenada Av | expand kitchen & 1st floor bathroom. (e) walls will be removed to expand the kitchen. remodel bathroom on the 2nd floor. same footprint just update tile and plm & ele fixturesDetails
expand kitchen & 1st floor bathroom. (e) walls will be removed to expand the kitchen. remodel bathroom on the 2nd floor. same footprint just update tile and plm & ele fixtures | $125,000 |
| Mar 24, 2017 | Completed final sign-off Nov 2017 | 145 Joost Av | remodel existing kitchen. remodel powder room on main floor. install hardwood floor through all the floors. exterior deck repair less than 50%, replace in kind.Details
remodel existing kitchen. remodel powder room on main floor. install hardwood floor through all the floors. exterior deck repair less than 50%, replace in kind. | $100,000 |
| May 6, 2016 | Never finaled issued Jun 2016, no final | 45 Parker Av | (n) bathroom on 1st floor. kitchen remodel, (n) bathroom & (n) powder on 2nd floor. demo deck stairs & bathroom on 3rd floor. (n) radiant heating.Details
(n) bathroom on 1st floor. kitchen remodel, (n) bathroom & (n) powder on 2nd floor. demo deck stairs & bathroom on 3rd floor. (n) radiant heating. | $375,000 |
| Jun 4, 2015 | Never finaled issued Jun 2015, no final | 682 09th Av | remodel existing bath and kitchen. change cabinets, counter, fixtures, appliances and tiling. no walls removed/added. layout unchangedDetails
remodel existing bath and kitchen. change cabinets, counter, fixtures, appliances and tiling. no walls removed/added. layout unchanged | $55,000 |
| Feb 23, 2015 | Never finaled issued Feb 2015, no final | 50 Manchester St | kitchen and bathroom remodel. replace kitchen cabinet, countertop and appliances. replace the bathroom shower and vanity. new tile on floor and walls.Details
kitchen and bathroom remodel. replace kitchen cabinet, countertop and appliances. replace the bathroom shower and vanity. new tile on floor and walls. | $15,000 |
| Nov 26, 2014 | Never finaled issued Aug 2015, no final | 46 Manchester St | rear bldg: replace extg foundation and add new basement level with bathroom and laundry. remodel extg 1st floor with new kitchen and staircase and remodel 2nd floor including new bathroom. replace extg painted wood siding with new painted siding.Details
rear bldg: replace extg foundation and add new basement level with bathroom and laundry. remodel extg 1st floor with new kitchen and staircase and remodel 2nd floor including new bathroom. replace extg painted wood siding with new painted siding. | $108,000 |
| Nov 21, 2014 | Completed final sign-off Jan 2019 | 145 Bonview St | no change to main house bldg foorprint.no chg to unit 2. unit 1: add 37 sf of habitable space w/ bay windows at flr 3.relocate interior stair. relocate & remodel kitchen & bath on 2 & 3 flrs. alter pitch of (e) rear roof lines. add 350 sf art studio above (e) parking at soutwest corner of property.Details
no change to main house bldg foorprint.no chg to unit 2. unit 1: add 37 sf of habitable space w/ bay windows at flr 3.relocate interior stair. relocate & remodel kitchen & bath on 2 & 3 flrs. alter pitch of (e) rear roof lines. add 350 sf art studio above (e) parking at soutwest corner of property. | $300,000 |
| Nov 17, 2014 | Never finaled issued Nov 2014, no final | 3732 21st St | kitchen remodel, replace existing cabinets & counter top, replace all appliances, no alteration of wall, window and door.Details
kitchen remodel, replace existing cabinets & counter top, replace all appliances, no alteration of wall, window and door. | $35,000 |
| Nov 17, 2014 | Completed final sign-off Apr 2015 | 39 Noe St | kitchen remodel, replace cabinets, counter top and appliances, no alteration of wall, window and door.Details
kitchen remodel, replace cabinets, counter top and appliances, no alteration of wall, window and door. | $35,000 |
| Jan 17, 2014 | Completed final sign-off Jul 2014 | 1447 Mcallister St | move laundry washer/dryer from deck into the kitchen. replace 2 new kitchen cabinets and a new countertop at the islandDetails
move laundry washer/dryer from deck into the kitchen. replace 2 new kitchen cabinets and a new countertop at the island | $2,200 |
| Dec 2, 2013 | Completed final sign-off Sep 2014 | 1447 Mcallister St | repair (e) redwood deck. replace 2x10 deck joists with p.t. lumber. replace 2x2 redwood picket & 2x6 railing top cap. use simpson 2 max joist hangers. pour new concrete footing for deck posts, less than 50%, replace door from deck to kitchen. keep 2x6 redwood deck boards & (e) stairs & east railing.Details
repair (e) redwood deck. replace 2x10 deck joists with p.t. lumber. replace 2x2 redwood picket & 2x6 railing top cap. use simpson 2 max joist hangers. pour new concrete footing for deck posts, less than 50%, replace door from deck to kitchen. keep 2x6 redwood deck boards & (e) stairs & east railing. | $15,000 |
| Oct 11, 2013 | Completed final sign-off Jul 2016 | 3335 Clement St | kitchen and bath remodel. all construction within building envelope. new gas forced air furnace to replace extg wall gas heater.Details
kitchen and bath remodel. all construction within building envelope. new gas forced air furnace to replace extg wall gas heater. | $37,000 |
| Sep 11, 2013 | Completed final sign-off Nov 2013 | 15 Emerson St | remodel kitchen, no structural changes, replace in kindDetails
remodel kitchen, no structural changes, replace in kind | $20,000 |
| Jul 11, 2013 | Completed final sign-off Oct 2013 | 35 Wilder St | new kitchen cabinet. new master suite with replacement windows, structural, electrical, and mech.Details
new kitchen cabinet. new master suite with replacement windows, structural, electrical, and mech. | $110,000 |
| May 10, 2013 | Completed final sign-off May 2013 | 2031 17th Av | kitchen work no structural , install end panel , sheetrock door for fridge, no change on walls .Details
kitchen work no structural , install end panel , sheetrock door for fridge, no change on walls . | $500 |
| Feb 8, 2013 | Completed final sign-off Apr 2013 | 2079 Golden Gate Av | new 2nd bathroom at location of (e) hallway, relocate (e) kitchen cabinetryDetails
new 2nd bathroom at location of (e) hallway, relocate (e) kitchen cabinetry | $28,252 |
| Nov 28, 2012 | Completed final sign-off Jul 2013 | 215 Clipper St | kitchen remodel, bath remodel, power room addition, bedroom windows and closet. work on 2/f only.Details
kitchen remodel, bath remodel, power room addition, bedroom windows and closet. work on 2/f only. | $50,000 |
| Nov 14, 2012 | Completed final sign-off Apr 2013 | 614 Buchanan St | kitchen & bath remodel. replace existing window.Details
kitchen & bath remodel. replace existing window. | $30,000 |
| Oct 31, 2012 | Completed final sign-off Jan 2013 | 11 Perego Tr | unit #1 - add laundry, door opening in kitchen, new countertops, new hardwood floors, comply with co alarms requirements per cbc 2010 section 420.4.Details
unit #1 - add laundry, door opening in kitchen, new countertops, new hardwood floors, comply with co alarms requirements per cbc 2010 section 420.4. | $35,000 |
| Jun 13, 2011 | Completed final sign-off Jun 2011 | 219 Cotter St | remove 1 toilet, 1 bathroom vanity and 1 shower stall. remove extg kitchen cabinets and sink from the lower garage level. remove 1 wall in the garage non load bearing. move one light. all work to comlply with n.o.v. 201142961Details
remove 1 toilet, 1 bathroom vanity and 1 shower stall. remove extg kitchen cabinets and sink from the lower garage level. remove 1 wall in the garage non load bearing. move one light. all work to comlply with n.o.v. 201142961 | $3,000 |
| Mar 21, 2011 | Completed final sign-off Jun 2011 | 11 Norwich St | replace the kitchen cabinets & counter tops. tile the kitchen floor. no wall removal.Details
replace the kitchen cabinets & counter tops. tile the kitchen floor. no wall removal. | $20,000 |
| Mar 21, 2011 | Completed final sign-off Jun 2011 | 916 Stanyan St | replace the kitchen cabinets. replace the kitchen couter tops. replace the bath room vanity, tile the bathroom floor. refinish the hardwood floor approx 400 square feet. no wall removal.Details
replace the kitchen cabinets. replace the kitchen couter tops. replace the bath room vanity, tile the bathroom floor. refinish the hardwood floor approx 400 square feet. no wall removal. | $25,000 |
| Nov 30, 2009 | Completed final sign-off Jun 2010 | 416 Linden St | work is inunit 418, 2nd floor. relocate kitchen, bedroom, water heater and laundry. new kitchen and bath room remodel, removal of non and load-bearing walls. window replacement under separate permit.Details
work is inunit 418, 2nd floor. relocate kitchen, bedroom, water heater and laundry. new kitchen and bath room remodel, removal of non and load-bearing walls. window replacement under separate permit. | $50,000 |
| Apr 28, 2009 | Completed final sign-off Sep 2010 | 145 Bonview St | kitchen and bath remodel. repair rat slab. repair dryrot drainage to the ext deck gr level 1st fl entry area. kitchen area approx 120 sf, bath >4x10. replace stove,cabinets, top,ref rig,dishwshr, floor throughout unit. replace toilet, vanity, showerDetails
kitchen and bath remodel. repair rat slab. repair dryrot drainage to the ext deck gr level 1st fl entry area. kitchen area approx 120 sf, bath >4x10. replace stove,cabinets, top,ref rig,dishwshr, floor throughout unit. replace toilet, vanity, shower | $45,000 |
| Mar 14, 2008 | Completed final sign-off Jul 2008 | 280 Ellsworth St | remodel kitchen appliances & bathroom fixtures attach new stair at rear. remove the partition wall, remove non-compliant exterior stair on the 2nd floor.Details
remodel kitchen appliances & bathroom fixtures attach new stair at rear. remove the partition wall, remove non-compliant exterior stair on the 2nd floor. | $40,000 |