Back to bathroom remodel contractors
Cronin Construction & Development Inc.
- Based in
- San Francisco
- On San Francisco permits
- Mar 2008 to Oct 2025
- Last 24 months
- 2 permits filed
99 permits since 2000: 72 completed, 2 in progress, 19 never finaled, 6 expired or cancelled.
Of the 19 never-finaled permits, 6 are 5 to 10 years old, 13 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
30 bathroom remodel permits: 22 completed, 7 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 152 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 7, 2023 | Completed final sign-off May 2023 | 3226 18th St | remodel kitchen, bathroom & powder room. install hardwood floor. replace 10 window and repair extg wood siding on rear st bldg. windows same size, same location, max u factor 0.30Details
remodel kitchen, bathroom & powder room. install hardwood floor. replace 10 window and repair extg wood siding on rear st bldg. windows same size, same location, max u factor 0.30 | $65,000 |
| Jan 30, 2019 | Completed final sign-off May 2021 | 445 Anderson St | rev to pa#201712217083; change powder room at basement to full bath, add dormer, repair exteior stair and deck.Details
rev to pa#201712217083; change powder room at basement to full bath, add dormer, repair exteior stair and deck. | $5,000 |
| Mar 23, 2018 | Completed final sign-off Oct 2018 | 436 Castenada Av | expand kitchen & 1st floor bathroom. (e) walls will be removed to expand the kitchen. remodel bathroom on the 2nd floor. same footprint just update tile and plm & ele fixturesDetails
expand kitchen & 1st floor bathroom. (e) walls will be removed to expand the kitchen. remodel bathroom on the 2nd floor. same footprint just update tile and plm & ele fixtures | $125,000 |
| Jan 9, 2018 | Completed final sign-off May 2018 | 405 Hill St | remodel 2 bathrooms on 2/f. no walls are being moved or modified. replace ktichen counter on the 1/f. all cabinets & appliance will stay in the same locations. no wallsmoved, rmeoved, added or infilled. all (e) layouts to remain unchanged.Details
remodel 2 bathrooms on 2/f. no walls are being moved or modified. replace ktichen counter on the 1/f. all cabinets & appliance will stay in the same locations. no wallsmoved, rmeoved, added or infilled. all (e) layouts to remain unchanged. | $80,000 |
| Dec 5, 2016 | Completed final sign-off Oct 2017 | 11 Norwich St | remodel extg garage. build a new bathroom and bedroomDetails
remodel extg garage. build a new bathroom and bedroom | $85,000 |
| May 6, 2016 | Never finaled issued Jun 2016, no final | 45 Parker Av | (n) bathroom on 1st floor. kitchen remodel, (n) bathroom & (n) powder on 2nd floor. demo deck stairs & bathroom on 3rd floor. (n) radiant heating.Details
(n) bathroom on 1st floor. kitchen remodel, (n) bathroom & (n) powder on 2nd floor. demo deck stairs & bathroom on 3rd floor. (n) radiant heating. | $375,000 |
| Dec 11, 2015 | Never finaled issued Dec 2015, no final | 4435 17th St | remodel exisitng bathroom, new tile, new vanity, install new tub. no alteration of wall, window & door.Details
remodel exisitng bathroom, new tile, new vanity, install new tub. no alteration of wall, window & door. | $75,000 |
| Jun 15, 2015 | Expired or cancelled cancelled Jan 2026 | 3790 16th St | renovation of 1st floor condo within extg duplex. expansion of extg garage/ground level to match extg footprint ground level addition to include 1 bedroom, sitting room, and a full bath. new stair and remodel of 1st floor, guest and master bath.Details
renovation of 1st floor condo within extg duplex. expansion of extg garage/ground level to match extg footprint ground level addition to include 1 bedroom, sitting room, and a full bath. new stair and remodel of 1st floor, guest and master bath. | $75,000 |
| Jun 4, 2015 | Never finaled issued Jun 2015, no final | 682 09th Av | remodel existing bath and kitchen. change cabinets, counter, fixtures, appliances and tiling. no walls removed/added. layout unchangedDetails
remodel existing bath and kitchen. change cabinets, counter, fixtures, appliances and tiling. no walls removed/added. layout unchanged | $55,000 |
| Feb 23, 2015 | Never finaled issued Feb 2015, no final | 50 Manchester St | kitchen and bathroom remodel. replace kitchen cabinet, countertop and appliances. replace the bathroom shower and vanity. new tile on floor and walls.Details
kitchen and bathroom remodel. replace kitchen cabinet, countertop and appliances. replace the bathroom shower and vanity. new tile on floor and walls. | $15,000 |
| Nov 26, 2014 | Never finaled issued Aug 2015, no final | 46 Manchester St | rear bldg: replace extg foundation and add new basement level with bathroom and laundry. remodel extg 1st floor with new kitchen and staircase and remodel 2nd floor including new bathroom. replace extg painted wood siding with new painted siding.Details
rear bldg: replace extg foundation and add new basement level with bathroom and laundry. remodel extg 1st floor with new kitchen and staircase and remodel 2nd floor including new bathroom. replace extg painted wood siding with new painted siding. | $108,000 |
| Nov 21, 2014 | Completed final sign-off Jan 2019 | 145 Bonview St | no change to main house bldg foorprint.no chg to unit 2. unit 1: add 37 sf of habitable space w/ bay windows at flr 3.relocate interior stair. relocate & remodel kitchen & bath on 2 & 3 flrs. alter pitch of (e) rear roof lines. add 350 sf art studio above (e) parking at soutwest corner of property.Details
no change to main house bldg foorprint.no chg to unit 2. unit 1: add 37 sf of habitable space w/ bay windows at flr 3.relocate interior stair. relocate & remodel kitchen & bath on 2 & 3 flrs. alter pitch of (e) rear roof lines. add 350 sf art studio above (e) parking at soutwest corner of property. | $300,000 |
| Nov 6, 2014 | Never finaled issued Nov 2014, no final | 405 Hill St | install media cabinet in living room. install exterior cabinet & countertop on the new brick patio. replace shower pan in lower bathroom and replace tile approx. 70 sq. ft.Details
install media cabinet in living room. install exterior cabinet & countertop on the new brick patio. replace shower pan in lower bathroom and replace tile approx. 70 sq. ft. | $20,000 |
| Feb 19, 2014 | Completed final sign-off Mar 2015 | 211 Anderson St | add new connecting stair from 1st floor sunroom to basement/garage level. rear portion of garage finished to create new study and bath. new workshop at front of basement. no change to front facade or total area of bldg.Details
add new connecting stair from 1st floor sunroom to basement/garage level. rear portion of garage finished to create new study and bath. new workshop at front of basement. no change to front facade or total area of bldg. | $100,000 |
| Jan 28, 2014 | Never finaled issued Mar 2015, no final | 2 Wright St | basement addition under area of (e) deck which will be removed & replaced. addition will be bedroom, bath & interior stair to 1st floor. replace (e) furnace. relocate laundry to basement.Details
basement addition under area of (e) deck which will be removed & replaced. addition will be bedroom, bath & interior stair to 1st floor. replace (e) furnace. relocate laundry to basement. | $90,000 |
| Oct 25, 2013 | Completed final sign-off Dec 2013 | 112 Montcalm St | remodel 2 bathroom, replace bathroom vanities, fixtures & tiling in both. replace shower pan. no change in walls and openingsDetails
remodel 2 bathroom, replace bathroom vanities, fixtures & tiling in both. replace shower pan. no change in walls and openings | $25,000 |
| Oct 11, 2013 | Completed final sign-off Jul 2016 | 3335 Clement St | kitchen and bath remodel. all construction within building envelope. new gas forced air furnace to replace extg wall gas heater.Details
kitchen and bath remodel. all construction within building envelope. new gas forced air furnace to replace extg wall gas heater. | $37,000 |
| Sep 11, 2013 | Completed final sign-off Nov 2013 | 726 04th Av | remodel 2nd floor bathroom, no structural changes, replace in kind, replace existing windows not visable from street, u-factor shall not exceed 0.4.Details
remodel 2nd floor bathroom, no structural changes, replace in kind, replace existing windows not visable from street, u-factor shall not exceed 0.4. | $12,000 |
| Feb 8, 2013 | Completed final sign-off Apr 2013 | 2079 Golden Gate Av | new 2nd bathroom at location of (e) hallway, relocate (e) kitchen cabinetryDetails
new 2nd bathroom at location of (e) hallway, relocate (e) kitchen cabinetry | $28,252 |
| Nov 28, 2012 | Completed final sign-off Jul 2013 | 215 Clipper St | kitchen remodel, bath remodel, power room addition, bedroom windows and closet. work on 2/f only.Details
kitchen remodel, bath remodel, power room addition, bedroom windows and closet. work on 2/f only. | $50,000 |
| Nov 14, 2012 | Completed final sign-off Apr 2013 | 614 Buchanan St | kitchen & bath remodel. replace existing window.Details
kitchen & bath remodel. replace existing window. | $30,000 |
| Jun 27, 2011 | Completed final sign-off Apr 2013 | 3732 21st St | new 3rd floor guest bathroom and dressing room at location of extg bedroom.Details
new 3rd floor guest bathroom and dressing room at location of extg bedroom. | $15,000 |
| Jun 13, 2011 | Completed final sign-off Jun 2011 | 219 Cotter St | remove 1 toilet, 1 bathroom vanity and 1 shower stall. remove extg kitchen cabinets and sink from the lower garage level. remove 1 wall in the garage non load bearing. move one light. all work to comlply with n.o.v. 201142961Details
remove 1 toilet, 1 bathroom vanity and 1 shower stall. remove extg kitchen cabinets and sink from the lower garage level. remove 1 wall in the garage non load bearing. move one light. all work to comlply with n.o.v. 201142961 | $3,000 |
| Mar 21, 2011 | Completed final sign-off Jun 2011 | 916 Stanyan St | replace the kitchen cabinets. replace the kitchen couter tops. replace the bath room vanity, tile the bathroom floor. refinish the hardwood floor approx 400 square feet. no wall removal.Details
replace the kitchen cabinets. replace the kitchen couter tops. replace the bath room vanity, tile the bathroom floor. refinish the hardwood floor approx 400 square feet. no wall removal. | $25,000 |
| Oct 13, 2010 | Completed final sign-off Aug 2011 | 3732 21st St | remodel existing bathroom, move shower, vanity & toilet, install new tile. no structural work. new lighting comply w/cec 150(k)Details
remodel existing bathroom, move shower, vanity & toilet, install new tile. no structural work. new lighting comply w/cec 150(k) | $35,000 |
| Jan 7, 2010 | Completed final sign-off Apr 2010 | 3553 Divisadero St | bathroom remodel. replace (e) vanity, tie shower stall, sheetrock & paint. replace one light & fixture. in unit 3553.Details
bathroom remodel. replace (e) vanity, tie shower stall, sheetrock & paint. replace one light & fixture. in unit 3553. | $7,500 |
| Nov 30, 2009 | Completed final sign-off Jun 2010 | 416 Linden St | work is inunit 418, 2nd floor. relocate kitchen, bedroom, water heater and laundry. new kitchen and bath room remodel, removal of non and load-bearing walls. window replacement under separate permit.Details
work is inunit 418, 2nd floor. relocate kitchen, bedroom, water heater and laundry. new kitchen and bath room remodel, removal of non and load-bearing walls. window replacement under separate permit. | $50,000 |
| Apr 28, 2009 | Completed final sign-off Sep 2010 | 145 Bonview St | kitchen and bath remodel. repair rat slab. repair dryrot drainage to the ext deck gr level 1st fl entry area. kitchen area approx 120 sf, bath >4x10. replace stove,cabinets, top,ref rig,dishwshr, floor throughout unit. replace toilet, vanity, showerDetails
kitchen and bath remodel. repair rat slab. repair dryrot drainage to the ext deck gr level 1st fl entry area. kitchen area approx 120 sf, bath >4x10. replace stove,cabinets, top,ref rig,dishwshr, floor throughout unit. replace toilet, vanity, shower | $45,000 |
| Oct 8, 2008 | Completed final sign-off May 2009 | 104 San Jose Av | remodel two bathrooms. install new carrier furnace. refinish hardwood floors. sheetrock of paint bolt batghrooms. provid 1 hr protection at property line walls use 1 layer of type x (1/2") gyp board.Details
remodel two bathrooms. install new carrier furnace. refinish hardwood floors. sheetrock of paint bolt batghrooms. provid 1 hr protection at property line walls use 1 layer of type x (1/2") gyp board. | $63,000 |
| Mar 14, 2008 | Completed final sign-off Jul 2008 | 280 Ellsworth St | remodel kitchen appliances & bathroom fixtures attach new stair at rear. remove the partition wall, remove non-compliant exterior stair on the 2nd floor.Details
remodel kitchen appliances & bathroom fixtures attach new stair at rear. remove the partition wall, remove non-compliant exterior stair on the 2nd floor. | $40,000 |