Cronin Construction & Development Inc.
- Based in
- San Francisco
- On San Francisco permits
- Mar 2008 to Oct 2025
- Last 24 months
- 2 permits filed
99 permits since 2000: 72 completed, 2 in progress, 19 never finaled, 6 expired or cancelled.
Of the 19 never-finaled permits, 6 are 5 to 10 years old, 13 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
19 deck permits: 14 completed, 4 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 162 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 6, 2019 | Expired or cancelled expired Feb 2026 | 428 27th St | legalize unauthorized dwelling unit. new bedroom & breezeway access to rear yard @ 1st floor. remodel upper levels. rebuild (e) deck. raise roof @ rear for new master suite.Details
legalize unauthorized dwelling unit. new bedroom & breezeway access to rear yard @ 1st floor. remodel upper levels. rebuild (e) deck. raise roof @ rear for new master suite. | $250,000 |
| Jan 30, 2019 | Completed final sign-off May 2021 | 445 Anderson St | rev to pa#201712217083; change powder room at basement to full bath, add dormer, repair exteior stair and deck.Details
rev to pa#201712217083; change powder room at basement to full bath, add dormer, repair exteior stair and deck. | $5,000 |
| Mar 24, 2017 | Completed final sign-off Nov 2017 | 145 Joost Av | remodel existing kitchen. remodel powder room on main floor. install hardwood floor through all the floors. exterior deck repair less than 50%, replace in kind.Details
remodel existing kitchen. remodel powder room on main floor. install hardwood floor through all the floors. exterior deck repair less than 50%, replace in kind. | $100,000 |
| Dec 12, 2016 | Completed final sign-off May 2017 | 96 Stoneman St | replace dry rot & damaged deck boards, less than 50%, replace all lumber in kind, use pt for structural lumber. pre construction meeting with city inspector is required prior to construction.Details
replace dry rot & damaged deck boards, less than 50%, replace all lumber in kind, use pt for structural lumber. pre construction meeting with city inspector is required prior to construction. | $15,000 |
| Dec 5, 2016 | Never finaled issued Dec 2016, no final | 2368 Vallejo St | demo existing tile patio. install waterproofiong membrane and install new tile repair framing as needed due to dryrot and termite damagel. replace all framing and siding.approx 10 ft x 8ft. of existing deck. no wall changeDetails
demo existing tile patio. install waterproofiong membrane and install new tile repair framing as needed due to dryrot and termite damagel. replace all framing and siding.approx 10 ft x 8ft. of existing deck. no wall change | $20,000 |
| Dec 2, 2016 | Never finaled issued Dec 2016, no final | 45 Parker Av | revision to appl #2016-1202-4055 per demo & discovery such as moment frame connection, deck connection, adding a collector.Details
revision to appl #2016-1202-4055 per demo & discovery such as moment frame connection, deck connection, adding a collector. | $1,000 |
| May 6, 2016 | Never finaled issued Jun 2016, no final | 45 Parker Av | (n) bathroom on 1st floor. kitchen remodel, (n) bathroom & (n) powder on 2nd floor. demo deck stairs & bathroom on 3rd floor. (n) radiant heating.Details
(n) bathroom on 1st floor. kitchen remodel, (n) bathroom & (n) powder on 2nd floor. demo deck stairs & bathroom on 3rd floor. (n) radiant heating. | $375,000 |
| Jan 28, 2014 | Never finaled issued Mar 2015, no final | 2 Wright St | basement addition under area of (e) deck which will be removed & replaced. addition will be bedroom, bath & interior stair to 1st floor. replace (e) furnace. relocate laundry to basement.Details
basement addition under area of (e) deck which will be removed & replaced. addition will be bedroom, bath & interior stair to 1st floor. replace (e) furnace. relocate laundry to basement. | $90,000 |
| Jan 17, 2014 | Completed final sign-off Jul 2014 | 1447 Mcallister St | move laundry washer/dryer from deck into the kitchen. replace 2 new kitchen cabinets and a new countertop at the islandDetails
move laundry washer/dryer from deck into the kitchen. replace 2 new kitchen cabinets and a new countertop at the island | $2,200 |
| Dec 2, 2013 | Completed final sign-off Sep 2014 | 1447 Mcallister St | repair (e) redwood deck. replace 2x10 deck joists with p.t. lumber. replace 2x2 redwood picket & 2x6 railing top cap. use simpson 2 max joist hangers. pour new concrete footing for deck posts, less than 50%, replace door from deck to kitchen. keep 2x6 redwood deck boards & (e) stairs & east railing.Details
repair (e) redwood deck. replace 2x10 deck joists with p.t. lumber. replace 2x2 redwood picket & 2x6 railing top cap. use simpson 2 max joist hangers. pour new concrete footing for deck posts, less than 50%, replace door from deck to kitchen. keep 2x6 redwood deck boards & (e) stairs & east railing. | $15,000 |
| Oct 29, 2013 | Completed final sign-off Apr 2015 | 51 Oakwood St | work at rear structure only. replace (e) dry rotted stairs & deck with new stair & deck. same dimensions, except code upgrade with new fire wall.Details
work at rear structure only. replace (e) dry rotted stairs & deck with new stair & deck. same dimensions, except code upgrade with new fire wall. | $3,000 |
| Jun 26, 2012 | Completed final sign-off Jul 2012 | 472 Pennsylvania Av | repair (e) rear deck less than 50%. replace 200 sq ft of redwood siding on the rear of the bldg. repair (e) rear deckDetails
repair (e) rear deck less than 50%. replace 200 sq ft of redwood siding on the rear of the bldg. repair (e) rear deck | $10,000 |
| Dec 15, 2011 | Completed final sign-off May 2012 | 393 Cumberland St | repair redwood deck less than 50& top level, replace 2 @ 2"x12"x12 ft; pt. 4 @ 2"x6"x8 ft redwood. deck boards. 1 @ 4"x12"x12 pressure treated. 1 @ 1x12x12 ft, redwood facia board. repair t-1-11 siding 2'x4' attach. 4x12x12 ft with 6 @ 12 5/8" bolt into existing beam.Details
repair redwood deck less than 50& top level, replace 2 @ 2"x12"x12 ft; pt. 4 @ 2"x6"x8 ft redwood. deck boards. 1 @ 4"x12"x12 pressure treated. 1 @ 1x12x12 ft, redwood facia board. repair t-1-11 siding 2'x4' attach. 4x12x12 ft with 6 @ 12 5/8" bolt into existing beam. | $10,000 |
| Aug 26, 2011 | Completed final sign-off Apr 2013 | 3732 21st St | revision to pa# 2010-0908-0421: revised deck stair configuration, a revised deck configuration, an additional 36 sq ft at (e) breakfast roomDetails
revision to pa# 2010-0908-0421: revised deck stair configuration, a revised deck configuration, an additional 36 sq ft at (e) breakfast room | $10,000 |
| Sep 8, 2010 | Completed final sign-off Apr 2013 | 3732 21st St | construction of a (n) extension to the (e) 1st floor deck with a (n) deck below at the basement level, and a (n) roof to enclose the (e) 2nd floor sunporch, all work to be done at the rear of the existing.Details
construction of a (n) extension to the (e) 1st floor deck with a (n) deck below at the basement level, and a (n) roof to enclose the (e) 2nd floor sunporch, all work to be done at the rear of the existing. | $25,000 |
| Nov 6, 2009 | Completed final sign-off Apr 2010 | 3985 23rd St | repair front window trim. repair < 50% redwood deck at rear, patch some interior garage sheetrock, repair composite roof material, new flashing, <10% paint the exterior of buildingDetails
repair front window trim. repair < 50% redwood deck at rear, patch some interior garage sheetrock, repair composite roof material, new flashing, <10% paint the exterior of building | $12,000 |
| Jul 9, 2009 | Completed final sign-off Aug 2009 | 81 Ord St | repair rear exterior real wood deck. replace 10 - 2 x 8 pt joists. replace 7 - 2 x 6 redwood deckboards. less than 50% at the back of the house.Details
repair rear exterior real wood deck. replace 10 - 2 x 8 pt joists. replace 7 - 2 x 6 redwood deckboards. less than 50% at the back of the house. | $6,000 |
| Apr 28, 2009 | Completed final sign-off Sep 2010 | 145 Bonview St | kitchen and bath remodel. repair rat slab. repair dryrot drainage to the ext deck gr level 1st fl entry area. kitchen area approx 120 sf, bath >4x10. replace stove,cabinets, top,ref rig,dishwshr, floor throughout unit. replace toilet, vanity, showerDetails
kitchen and bath remodel. repair rat slab. repair dryrot drainage to the ext deck gr level 1st fl entry area. kitchen area approx 120 sf, bath >4x10. replace stove,cabinets, top,ref rig,dishwshr, floor throughout unit. replace toilet, vanity, shower | $45,000 |
| Sep 17, 2008 | Completed final sign-off Dec 2008 | 154 Tiffany Av | replace dryrot 6 2x10 douglas fir joists. replace 3/4" ply. replact hot mopped roof 10x14. replace rear gutter & flashing. repair redwood deck 10 x 14 surface. repair only.Details
replace dryrot 6 2x10 douglas fir joists. replace 3/4" ply. replact hot mopped roof 10x14. replace rear gutter & flashing. repair redwood deck 10 x 14 surface. repair only. | $16,000 |