Cronin Construction & Development Inc.
- Based in
- San Francisco
- On San Francisco permits
- Mar 2008 to Oct 2025
- Last 24 months
- 2 permits filed
99 permits since 2000: 72 completed, 2 in progress, 19 never finaled, 6 expired or cancelled.
Of the 19 never-finaled permits, 6 are 5 to 10 years old, 13 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
17 stairs permits: 11 completed, 1 in progress, 3 never finaled, 2 expired or cancelled. Typically 43 days from filing to permit and 301 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 22, 2025 | In progress issued Feb 2026 | 3226 18th St | new adu under state adu programme. convert existing 1/f storage space into a 1-bedroom adu. new stairs from sidewalk to new unit. new utility room. no work on upper two floors.Details
new adu under state adu programme. convert existing 1/f storage space into a 1-bedroom adu. new stairs from sidewalk to new unit. new utility room. no work on upper two floors. | $68,000 |
| Aug 14, 2019 | Completed final sign-off Feb 2023 | 145 Bonview St | replace existing site wall with new soldier pile retaining wall. replace existing railroad tie entry stair with new concrete stair on grade approved mse 21mse-00602Details
replace existing site wall with new soldier pile retaining wall. replace existing railroad tie entry stair with new concrete stair on grade approved mse 21mse-00602 | $20,000 |
| Jan 30, 2019 | Completed final sign-off May 2021 | 445 Anderson St | rev to pa#201712217083; change powder room at basement to full bath, add dormer, repair exteior stair and deck.Details
rev to pa#201712217083; change powder room at basement to full bath, add dormer, repair exteior stair and deck. | $5,000 |
| Dec 21, 2017 | Completed final sign-off Jun 2021 | 445 Anderson St | remodel of single family home. excavate down to add additional habitable space. replace existing windows and exterior rear stairs, new roof deck. no change to building footprint, no change to front facade other window replacement.Details
remodel of single family home. excavate down to add additional habitable space. replace existing windows and exterior rear stairs, new roof deck. no change to building footprint, no change to front facade other window replacement. | $300,000 |
| May 6, 2016 | Never finaled issued Jun 2016, no final | 45 Parker Av | (n) bathroom on 1st floor. kitchen remodel, (n) bathroom & (n) powder on 2nd floor. demo deck stairs & bathroom on 3rd floor. (n) radiant heating.Details
(n) bathroom on 1st floor. kitchen remodel, (n) bathroom & (n) powder on 2nd floor. demo deck stairs & bathroom on 3rd floor. (n) radiant heating. | $375,000 |
| Jun 15, 2015 | Expired or cancelled cancelled Jan 2026 | 3790 16th St | renovation of 1st floor condo within extg duplex. expansion of extg garage/ground level to match extg footprint ground level addition to include 1 bedroom, sitting room, and a full bath. new stair and remodel of 1st floor, guest and master bath.Details
renovation of 1st floor condo within extg duplex. expansion of extg garage/ground level to match extg footprint ground level addition to include 1 bedroom, sitting room, and a full bath. new stair and remodel of 1st floor, guest and master bath. | $75,000 |
| Nov 26, 2014 | Never finaled issued Aug 2015, no final | 46 Manchester St | rear bldg: replace extg foundation and add new basement level with bathroom and laundry. remodel extg 1st floor with new kitchen and staircase and remodel 2nd floor including new bathroom. replace extg painted wood siding with new painted siding.Details
rear bldg: replace extg foundation and add new basement level with bathroom and laundry. remodel extg 1st floor with new kitchen and staircase and remodel 2nd floor including new bathroom. replace extg painted wood siding with new painted siding. | $108,000 |
| Nov 21, 2014 | Completed final sign-off Jan 2019 | 145 Bonview St | no change to main house bldg foorprint.no chg to unit 2. unit 1: add 37 sf of habitable space w/ bay windows at flr 3.relocate interior stair. relocate & remodel kitchen & bath on 2 & 3 flrs. alter pitch of (e) rear roof lines. add 350 sf art studio above (e) parking at soutwest corner of property.Details
no change to main house bldg foorprint.no chg to unit 2. unit 1: add 37 sf of habitable space w/ bay windows at flr 3.relocate interior stair. relocate & remodel kitchen & bath on 2 & 3 flrs. alter pitch of (e) rear roof lines. add 350 sf art studio above (e) parking at soutwest corner of property. | $300,000 |
| Jun 12, 2014 | Expired or cancelled cancelled Jan 2026 | 2182 Sutter St | staircase to connect 2186 sutter street with downstairs, unit at 2182 sutter street, volunteer seismic wall structuresDetails
staircase to connect 2186 sutter street with downstairs, unit at 2182 sutter street, volunteer seismic wall structures | $20,000 |
| Feb 19, 2014 | Completed final sign-off Mar 2015 | 211 Anderson St | add new connecting stair from 1st floor sunroom to basement/garage level. rear portion of garage finished to create new study and bath. new workshop at front of basement. no change to front facade or total area of bldg.Details
add new connecting stair from 1st floor sunroom to basement/garage level. rear portion of garage finished to create new study and bath. new workshop at front of basement. no change to front facade or total area of bldg. | $100,000 |
| Jan 28, 2014 | Never finaled issued Mar 2015, no final | 2 Wright St | basement addition under area of (e) deck which will be removed & replaced. addition will be bedroom, bath & interior stair to 1st floor. replace (e) furnace. relocate laundry to basement.Details
basement addition under area of (e) deck which will be removed & replaced. addition will be bedroom, bath & interior stair to 1st floor. replace (e) furnace. relocate laundry to basement. | $90,000 |
| Dec 2, 2013 | Completed final sign-off Sep 2014 | 1447 Mcallister St | repair (e) redwood deck. replace 2x10 deck joists with p.t. lumber. replace 2x2 redwood picket & 2x6 railing top cap. use simpson 2 max joist hangers. pour new concrete footing for deck posts, less than 50%, replace door from deck to kitchen. keep 2x6 redwood deck boards & (e) stairs & east railing.Details
repair (e) redwood deck. replace 2x10 deck joists with p.t. lumber. replace 2x2 redwood picket & 2x6 railing top cap. use simpson 2 max joist hangers. pour new concrete footing for deck posts, less than 50%, replace door from deck to kitchen. keep 2x6 redwood deck boards & (e) stairs & east railing. | $15,000 |
| Oct 29, 2013 | Completed final sign-off Apr 2015 | 51 Oakwood St | work at rear structure only. replace (e) dry rotted stairs & deck with new stair & deck. same dimensions, except code upgrade with new fire wall.Details
work at rear structure only. replace (e) dry rotted stairs & deck with new stair & deck. same dimensions, except code upgrade with new fire wall. | $3,000 |
| Sep 26, 2011 | Completed final sign-off Dec 2011 | 98 Whitney St | repair dry rot underneath the front stairs. patch & repair stucco to match (e). repair in kind less than 50%.Details
repair dry rot underneath the front stairs. patch & repair stucco to match (e). repair in kind less than 50%. | $8,500 |
| Aug 26, 2011 | Completed final sign-off Apr 2013 | 3732 21st St | revision to pa# 2010-0908-0421: revised deck stair configuration, a revised deck configuration, an additional 36 sq ft at (e) breakfast roomDetails
revision to pa# 2010-0908-0421: revised deck stair configuration, a revised deck configuration, an additional 36 sq ft at (e) breakfast room | $10,000 |
| Apr 28, 2011 | Completed final sign-off Jun 2011 | 985 San Bruno Av | repair fungus damaged 2x4 of 2x6 framing replace in kind 3'x5' concrete slab 3" on the front stairway, remove as necessary existing stucco to perform the repairs, repl stucco to match, 50% repair in kind repairDetails
repair fungus damaged 2x4 of 2x6 framing replace in kind 3'x5' concrete slab 3" on the front stairway, remove as necessary existing stucco to perform the repairs, repl stucco to match, 50% repair in kind repair | $12,000 |
| Mar 14, 2008 | Completed final sign-off Jul 2008 | 280 Ellsworth St | remodel kitchen appliances & bathroom fixtures attach new stair at rear. remove the partition wall, remove non-compliant exterior stair on the 2nd floor.Details
remodel kitchen appliances & bathroom fixtures attach new stair at rear. remove the partition wall, remove non-compliant exterior stair on the 2nd floor. | $40,000 |