Block 2826, lot 105
11 Perego Ter
- City’s use
- Single Family Residential
- Built
- 1962
- Stories
- 1
- Units
- 1
- Rooms
- 2 bathrooms
- Building
- 1,470 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 13, 2023 | Completed final sign-off Jan 2025 | 11 Perego Tr | Curran & Associates General Contractors | exteior deck railing replacement and walkway/deck repairs only at common areas of condominium building. less than 50%Details
exteior deck railing replacement and walkway/deck repairs only at common areas of condominium building. less than 50% | $65,000 |
| Jul 10, 2019 | Completed final sign-off Dec 2019 | 11 Perego Tr | Appetite For Construction Inc | unit 5: bathroom remodel in-kind (55 sq. ft.), install dryer in closet, provide min 100 sq. inch opening, vent dryer to outside @ min 3' from property, and any building opening.Details
unit 5: bathroom remodel in-kind (55 sq. ft.), install dryer in closet, provide min 100 sq. inch opening, vent dryer to outside @ min 3' from property, and any building opening. | $10,000 |
| Nov 6, 2012 | Completed final sign-off Dec 2012 | 11 Perego Tr | Charles Window & Door/Golden Gate Home I | unit #1 - repalce 4 patio sliders, size for size, not visible from street, u-valve 0.29.Details
unit #1 - repalce 4 patio sliders, size for size, not visible from street, u-valve 0.29. | $12,300 |
| Oct 31, 2012 | Completed final sign-off Jan 2013 | 11 Perego Tr | Cronin Construction & Development Inc. | unit #1 - add laundry, door opening in kitchen, new countertops, new hardwood floors, comply with co alarms requirements per cbc 2010 section 420.4.Details
unit #1 - add laundry, door opening in kitchen, new countertops, new hardwood floors, comply with co alarms requirements per cbc 2010 section 420.4. | $35,000 |
| Jul 24, 2008 | Completed final sign-off Nov 2008 | 11 Perego Tr | work on unit#4. remodel bathroom-retile shower, replace toilet, new light fixtures, new mirrors, new faucet.Details
work on unit#4. remodel bathroom-retile shower, replace toilet, new light fixtures, new mirrors, new faucet. | $6,000 | |
| Sep 22, 2005 | Expired or cancelled expired Jan 2008 | 11 Perego Tr | Bay Area Noise Control And Insulation | remove & replace clear andied patio doors w/ dual pane heavy glass w/argon/ lew-e for insulation &Details
remove & replace clear andied patio doors w/ dual pane heavy glass w/argon/ lew-e for insulation & | $7,550 |
| May 19, 2000 | Completed final sign-off Sep 2000 | 11 Perego Tr | remodel kitchen & 2 baths-new partition to create pantry, new 1/2 wallDetails
remodel kitchen & 2 baths-new partition to create pantry, new 1/2 wall | $16,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Appetite For Construction Inc, Bay Area Noise Control And Insulation, Charles Window & Door/Golden Gate Home I, Cronin Construction & Development Inc., Curran & Associates General Contractors
- Architects
- John Spanier
- Engineers
- Hawk Lee/ Kevin Kim
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.