Charles Pankow Builders Ltd
- Based in
- Pasadena
- On San Francisco permits
- Jul 2000 to Sep 2025
- Last 24 months
- 1 permit filed
251 permits since 2000: 216 completed, 1 in progress, 25 never finaled, 9 expired or cancelled.
Of the 25 never-finaled permits, 9 are 5 to 10 years old, 16 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
15 stairs permits: 13 completed, 2 never finaled. Typically 59 days from filing to permit and 142 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 16, 2021 | Completed final sign-off Nov 2021 | 333 Valencia St | revision to core/shell permit 202006158760. provide cand readers and signage to lock the level 4 elevator lobby doors while providing access to egress stairs. fire life safetey under separate permitDetails
revision to core/shell permit 202006158760. provide cand readers and signage to lock the level 4 elevator lobby doors while providing access to egress stairs. fire life safetey under separate permit | $500 |
| Sep 23, 2020 | Completed final sign-off Apr 2021 | 909 Montgomery St | removal of existing internal communicating stair & associated structural between 3rd and 4th floor. also infill of slab at the 4th floor.Details
removal of existing internal communicating stair & associated structural between 3rd and 4th floor. also infill of slab at the 4th floor. | $225,000 |
| Jul 2, 2019 | Never finaled issued Aug 2019, no final | 944 Market St | demo & ti of existing 5th fl excluding elevator & stairs lobby. new inteirior finishes & restroom upgrades. mep, fire sprinklers under separate permit.Details
demo & ti of existing 5th fl excluding elevator & stairs lobby. new inteirior finishes & restroom upgrades. mep, fire sprinklers under separate permit. | $120,509 |
| Oct 29, 2018 | Completed final sign-off Nov 2021 | 333 Valencia St | renovation of (e) 4-story bldg- exterior & interior core elements: adding (2) new egress stairs, elevator, (n) restrooms @ each flr lvl, (n) bicycle storage rm, (n) exterior windows on east wall. structural upgrades include foundation & column reinforcement adding secondary columns, shear walls &Details
renovation of (e) 4-story bldg- exterior & interior core elements: adding (2) new egress stairs, elevator, (n) restrooms @ each flr lvl, (n) bicycle storage rm, (n) exterior windows on east wall. structural upgrades include foundation & column reinforcement adding secondary columns, shear walls & | $6,950,000 |
| Oct 12, 2018 | Completed final sign-off Apr 2019 | 701 03rd St | revision to app#201605127267. these revision were made at request of dbi inspector onsite. arch revisions include enclosures around elec equipment at basement level, clarifications regarding mech shaft along grid 16, revision to level 9 stair 2 vestibule & added gas line toDetails
revision to app#201605127267. these revision were made at request of dbi inspector onsite. arch revisions include enclosures around elec equipment at basement level, clarifications regarding mech shaft along grid 16, revision to level 9 stair 2 vestibule & added gas line to | |
| Mar 15, 2016 | Completed final sign-off Jul 2016 | 199 Fremont St | interior t.i. for single tenant at 6/f, no change in (e) bldg. core structural, elevator, exit stairs to remain. new mechanical, electrical and plumbing work. deferred submittals: fire sprinkler and fire alarm. no change in use or occupancy or life safety system. n/a ordinance #155-13Details
interior t.i. for single tenant at 6/f, no change in (e) bldg. core structural, elevator, exit stairs to remain. new mechanical, electrical and plumbing work. deferred submittals: fire sprinkler and fire alarm. no change in use or occupancy or life safety system. n/a ordinance #155-13 | $2,160,000 |
| Dec 8, 2015 | Completed final sign-off Jan 2016 | 1400 16th St | design built stairs per permit 201502097804; maher n/aDetails
design built stairs per permit 201502097804; maher n/a | $50,000 |
| May 26, 2015 | Completed final sign-off Aug 2017 | 270 Brannan St | 6th floor t.i. minor demo non bearing partitions. mep included in this permit. fire alarm sprinklers and convenience stair to 7th floor on seperate pemit. n/a maherDetails
6th floor t.i. minor demo non bearing partitions. mep included in this permit. fire alarm sprinklers and convenience stair to 7th floor on seperate pemit. n/a maher | $3,952,000 |
| Jul 15, 2013 | Completed final sign-off Dec 2013 | 574 Pacific Av | structural work only-add feature stairs, fill in (e) voids in various locations. add false floor & add accessibility ramp.Details
structural work only-add feature stairs, fill in (e) voids in various locations. add false floor & add accessibility ramp. | $15,000 |
| May 29, 2013 | Completed final sign-off Dec 2013 | 574 Pacific Av | interior renovations including accessibility upgrades, installation of an automatic sprinkler system (separate permit), new connecting stair between levels 3 & 4 & minor demolition. mep, fs, & structual to be filed under separate permit.Details
interior renovations including accessibility upgrades, installation of an automatic sprinkler system (separate permit), new connecting stair between levels 3 & 4 & minor demolition. mep, fs, & structual to be filed under separate permit. | $537,246 |
| May 17, 2013 | Completed final sign-off Jan 2016 | 340 Bryant St | change of use-2,3,4 fls to office fr. industrial. renovation of exterior including (n)entrance & aluminum windows in (e)opening @ portions of 1st & 2nd fl, construction of occupied roof, mech enclosure, & extension of stairs & accessible elevator to serve roof deck.Details
change of use-2,3,4 fls to office fr. industrial. renovation of exterior including (n)entrance & aluminum windows in (e)opening @ portions of 1st & 2nd fl, construction of occupied roof, mech enclosure, & extension of stairs & accessible elevator to serve roof deck. | $250,000 |
| Apr 26, 2013 | Completed final sign-off Jan 2016 | 340 Bryant St | interior/core rehab of (e) & accessibility element, including: new elevator, two exit stairs, improved lobby & stair, new accessible restrooms. mep, sprinklers under separate permits.Details
interior/core rehab of (e) & accessibility element, including: new elevator, two exit stairs, improved lobby & stair, new accessible restrooms. mep, sprinklers under separate permits. | $500,000 |
| Nov 15, 2012 | Completed final sign-off Dec 2012 | 143 08th St | structural work only, new structural framing members at (e) stair location. architecture & demolition under seperate permits, refer to pa# 2012-0913-9691Details
structural work only, new structural framing members at (e) stair location. architecture & demolition under seperate permits, refer to pa# 2012-0913-9691 | $2,600 |
| Sep 13, 2012 | Completed final sign-off Dec 2012 | 143 08th St | construction of new offices, new breakroom, new finishes, new lighting, office partitoin walls, workstations. replacement of existing non-conforming stair with new installation of new ada elevator under separate permit from 1st floor to roof deck. mep is under seperate permit.Details
construction of new offices, new breakroom, new finishes, new lighting, office partitoin walls, workstations. replacement of existing non-conforming stair with new installation of new ada elevator under separate permit from 1st floor to roof deck. mep is under seperate permit. | $210,000 |
| Mar 27, 2012 | Never finaled issued Aug 2012, no final | 50 Fremont St | remodel of level one & mezzanne of an (e) 43 story office tower, include replace main lobby finishes, replace perimeter storefront glazing, rerouting of tower stair exit, replace entrance marquee, replace exterior corner beacons & related modification to mep & lighting systems.Details
remodel of level one & mezzanne of an (e) 43 story office tower, include replace main lobby finishes, replace perimeter storefront glazing, rerouting of tower stair exit, replace entrance marquee, replace exterior corner beacons & related modification to mep & lighting systems. | $5,850,000 |