Back to kitchen remodel contractors
Bold Construction Group Inc
- Based in
- Castro Valley
- On San Francisco permits
- Jun 2022 to Jul 2026
- Last 24 months
- 9 permits filed
19 permits since 2000: 15 completed, 1 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 5 completed, 1 in progress, 1 expired or cancelled. Typically 0 days from filing to permit and 84 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 29, 2026 | In progress issued Jul 2026 | 2225 23rd St | unit #202: replace floor in living room and kitchen. all work done in kind. hoa requirement.Details
unit #202: replace floor in living room and kitchen. all work done in kind. hoa requirement. | $5,000 |
| Apr 18, 2025 | Completed final sign-off Feb 2026 | 401 Justin Dr | repair of rain water damage. remove & replace damaged interior wall & ceiling finishes. make opening in wall between dining room & kitchen. remodel kitchenDetails
repair of rain water damage. remove & replace damaged interior wall & ceiling finishes. make opening in wall between dining room & kitchen. remodel kitchen | $140,000 |
| Nov 21, 2024 | Completed final sign-off Feb 2025 | 451 Kansas St | install insulation in ceiling (approx 770sqft) install insulation on exterior walls(250sq) hand drywall- double sheet on ceiling and exyerior walls (approx 3000 sqft) paint unit, install flooe, reset kitchen cabinets and sink, reset light fixtures (closets entry, kitchen, livingroom, laundry room)Details
install insulation in ceiling (approx 770sqft) install insulation on exterior walls(250sq) hand drywall- double sheet on ceiling and exyerior walls (approx 3000 sqft) paint unit, install flooe, reset kitchen cabinets and sink, reset light fixtures (closets entry, kitchen, livingroom, laundry room) | $20,000 |
| May 23, 2024 | Completed final sign-off Jun 2024 | 2375 33rd Av | install insulation in closet wall. install drywall patches in kitchen, living room, bathroom, and closet (walls/ceiling) (approx. 250sf). paint kitchen, living room, bathroom and closet. reset existing kitchen cabinets and kitchen sink. all work done in kind. water damageDetails
install insulation in closet wall. install drywall patches in kitchen, living room, bathroom, and closet (walls/ceiling) (approx. 250sf). paint kitchen, living room, bathroom and closet. reset existing kitchen cabinets and kitchen sink. all work done in kind. water damage | $5,000 |
| May 20, 2024 | Expired or cancelled cancelled May 2024 | 2575 33rd Av | install insulation in closet wall. install drywall in kitchen, living room, bathroom, and closet. paint kitchen, living room, bathroom, and closet. reset existing kitchen cabinets and kitchen sink. all work done in kind. water damage.Details
install insulation in closet wall. install drywall in kitchen, living room, bathroom, and closet. paint kitchen, living room, bathroom, and closet. reset existing kitchen cabinets and kitchen sink. all work done in kind. water damage. | $5,000 |
| Aug 22, 2023 | Completed final sign-off Sep 2023 | 172 06th St | unit #510 "dwelling unit": to comply with nov 202301376. retrofit one window in living room. install linoleum flooring (approx 400 sf). baseboard kitchen cabinets. bathroom vanity. toilet.Details
unit #510 "dwelling unit": to comply with nov 202301376. retrofit one window in living room. install linoleum flooring (approx 400 sf). baseboard kitchen cabinets. bathroom vanity. toilet. | $5,000 |
| Jan 20, 2023 | Completed final sign-off Aug 2023 | 350 Golden Gate Av | replace drywall and insulations as needed on 17th residential units. common hallways and stairways as needed due to sprinkler broke on 4/f. reinstall and replace base kitchen cabinets as needed. reinstall and replace bathroom vanity and toilets as needed. replace light fixtures as needed.Details
replace drywall and insulations as needed on 17th residential units. common hallways and stairways as needed due to sprinkler broke on 4/f. reinstall and replace base kitchen cabinets as needed. reinstall and replace bathroom vanity and toilets as needed. replace light fixtures as needed. | $190,000 |