Back to bathroom remodel contractors
Bold Construction Group Inc
- Based in
- Castro Valley
- On San Francisco permits
- Jun 2022 to Jul 2026
- Last 24 months
- 9 permits filed
19 permits since 2000: 15 completed, 1 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 5 completed, 2 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 29 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 12, 2025 | Completed final sign-off Mar 2026 | 2568 Noriega St | 2nd fl common area hallway/bath: install drywall 5/8" ceiling and walls. install insolation r30 & r13. paint & floor installation. all work in kind. water damage.Details
2nd fl common area hallway/bath: install drywall 5/8" ceiling and walls. install insolation r30 & r13. paint & floor installation. all work in kind. water damage. | $20,000 |
| Jul 1, 2025 | Completed final sign-off Jul 2025 | 2040 Franklin St | unit #1003: drywall paint and tile in bathroom. (ceiling drywall repair; wall tiles replace; no other work)Details
unit #1003: drywall paint and tile in bathroom. (ceiling drywall repair; wall tiles replace; no other work) | $5,000 |
| May 23, 2024 | Completed final sign-off Jun 2024 | 2375 33rd Av | install insulation in closet wall. install drywall patches in kitchen, living room, bathroom, and closet (walls/ceiling) (approx. 250sf). paint kitchen, living room, bathroom and closet. reset existing kitchen cabinets and kitchen sink. all work done in kind. water damageDetails
install insulation in closet wall. install drywall patches in kitchen, living room, bathroom, and closet (walls/ceiling) (approx. 250sf). paint kitchen, living room, bathroom and closet. reset existing kitchen cabinets and kitchen sink. all work done in kind. water damage | $5,000 |
| May 20, 2024 | Expired or cancelled cancelled May 2024 | 2575 33rd Av | install insulation in closet wall. install drywall in kitchen, living room, bathroom, and closet. paint kitchen, living room, bathroom, and closet. reset existing kitchen cabinets and kitchen sink. all work done in kind. water damage.Details
install insulation in closet wall. install drywall in kitchen, living room, bathroom, and closet. paint kitchen, living room, bathroom, and closet. reset existing kitchen cabinets and kitchen sink. all work done in kind. water damage. | $5,000 |
| Aug 22, 2023 | Completed final sign-off Sep 2023 | 172 06th St | unit #510 "dwelling unit": to comply with nov 202301376. retrofit one window in living room. install linoleum flooring (approx 400 sf). baseboard kitchen cabinets. bathroom vanity. toilet.Details
unit #510 "dwelling unit": to comply with nov 202301376. retrofit one window in living room. install linoleum flooring (approx 400 sf). baseboard kitchen cabinets. bathroom vanity. toilet. | $5,000 |
| Jul 31, 2023 | Never finaled issued Jul 2023, no final | 455 Fell St | unit #221: install drywall and insulation as needed 45 linear ft bathroom and hallway walls 2ft hight from the floor due to water damage. all work to be done in "like-kind" manner. all work is non-stuctural only. contact district building inspector at the start of work.Details
unit #221: install drywall and insulation as needed 45 linear ft bathroom and hallway walls 2ft hight from the floor due to water damage. all work to be done in "like-kind" manner. all work is non-stuctural only. contact district building inspector at the start of work. | $2,500 |
| Jan 20, 2023 | Completed final sign-off Aug 2023 | 350 Golden Gate Av | replace drywall and insulations as needed on 17th residential units. common hallways and stairways as needed due to sprinkler broke on 4/f. reinstall and replace base kitchen cabinets as needed. reinstall and replace bathroom vanity and toilets as needed. replace light fixtures as needed.Details
replace drywall and insulations as needed on 17th residential units. common hallways and stairways as needed due to sprinkler broke on 4/f. reinstall and replace base kitchen cabinets as needed. reinstall and replace bathroom vanity and toilets as needed. replace light fixtures as needed. | $190,000 |
| Sep 13, 2022 | Never finaled issued Sep 2022, no final | 205 Jones St | 4th floor unit demo flooring in the bathroom and tear of 20sf drywall: 3rd floor unit demo drywall in bathroom 100s ceiling and walls: 2nd floor unit demo drywall in bathroom 100sf ceiling 4 walls. patch and repair in kind after exploratory work done. no alteration to existing fire rated wallsDetails
4th floor unit demo flooring in the bathroom and tear of 20sf drywall: 3rd floor unit demo drywall in bathroom 100s ceiling and walls: 2nd floor unit demo drywall in bathroom 100sf ceiling 4 walls. patch and repair in kind after exploratory work done. no alteration to existing fire rated walls | $4,000 |