Permit GraphShortlistSan Francisco building permits since 2000

Bold Construction Group Inc

Contractor license
1018292
State license record
Based in
Castro Valley
On San Francisco permits
Jun 2022 to Oct 2026
Last 24 months
9 permits filed

20 permits since 2000: 15 completed, 2 in progress, 2 never finaled, 1 expired or cancelled.

Of the 2 never-finaled permits, 2 are 3 to 5 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Stairs permits

AllStairs 1Kitchen remodel 7Bathroom remodel 8

1 stairs permit: 1 completed. Typically 10 days from filing to permit and 183 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Jan 20, 2023Completed
final sign-off Aug 2023
350 Golden Gate Avreplace drywall and insulations as needed on 17th residential units. common hallways and stairways as needed due to sprinkler broke on 4/f. reinstall and replace base kitchen cabinets as needed. reinstall and replace bathroom vanity and toilets as needed. replace light fixtures as needed.
Details
Permit
202301200505
Permit issued
Jan 30, 2023
Final sign-off
Aug 1, 2023

replace drywall and insulations as needed on 17th residential units. common hallways and stairways as needed due to sprinkler broke on 4/f. reinstall and replace base kitchen cabinets as needed. reinstall and replace bathroom vanity and toilets as needed. replace light fixtures as needed.

Open the permit page

$190,000