Beyond The Horizon Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2010 to Jul 2026
- Last 24 months
- 11 permits filed
148 permits since 2000: 115 completed, 6 in progress, 17 never finaled, 10 expired or cancelled.
Of the 17 never-finaled permits, 2 are 3 to 5 years old, 10 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
7 roof deck permits: 4 completed, 1 never finaled, 2 expired or cancelled. Typically 394 days from filing to permit and 322 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 27, 2022 | Completed final sign-off Aug 2025 | 2762 Filbert St | level out rearyard with basement level. interior remodel on all floors. unit 1 to be on basement and ground floor. unit 2 to be on 2nd and 3rd floor. new roof deck. no horizontal or vertical expansion. update facede design.Details
level out rearyard with basement level. interior remodel on all floors. unit 1 to be on basement and ground floor. unit 2 to be on 2nd and 3rd floor. new roof deck. no horizontal or vertical expansion. update facede design. | $1,500,000 |
| Sep 14, 2021 | Completed final sign-off May 2023 | 851 27th St | addition to 182 sf roof deck and exterior spiral stairs access roof deck at rear yardDetails
addition to 182 sf roof deck and exterior spiral stairs access roof deck at rear yard | $70,000 |
| Jul 3, 2019 | Expired or cancelled withdrawn Feb 2023 | 2717 Union St | addition of 491 sq ft roof deck with internal access from 4th fl unit only.Details
addition of 491 sq ft roof deck with internal access from 4th fl unit only. | $105,000 |
| Aug 21, 2018 | Never finaled issued Sep 2020, no final | 3444 21st St | new private roof deck (access from top unit only). new stair access to roof deck. expansion of balcony. no other work proposed.Details
new private roof deck (access from top unit only). new stair access to roof deck. expansion of balcony. no other work proposed. | $26,000 |
| May 30, 2018 | Completed final sign-off Jan 2020 | 2720 Vallejo St | construct new stair and roof deck maher naDetails
construct new stair and roof deck maher na | $75,000 |
| Dec 14, 2016 | Expired or cancelled expired Apr 2024 | 3442 21st St | exterior & interior renovation of 2 units residence. excavation of the lowest level to allow compliant headroom. adjusting location of floor above new foundation. replacement of glazing on rear facade with new windows. new roof deck. legalize 3rd unit per ord 43-14.Details
exterior & interior renovation of 2 units residence. excavation of the lowest level to allow compliant headroom. adjusting location of floor above new foundation. replacement of glazing on rear facade with new windows. new roof deck. legalize 3rd unit per ord 43-14. | $425,000 |
| Apr 28, 2014 | Completed final sign-off Jun 2014 | 179 Oak St | to comply w/nov #200227496 - repair handrails, remove roof deck ropes/wires or raise ti 8' min. soft story retrofit per sfbc 34b, other rational design. compliance with ordinance #155-13 not requiredDetails
to comply w/nov #200227496 - repair handrails, remove roof deck ropes/wires or raise ti 8' min. soft story retrofit per sfbc 34b, other rational design. compliance with ordinance #155-13 not required | $65,000 |