Back to kitchen remodel contractors
Ben Rogne Construction
- Based in
- San Anselmo
- On San Francisco permits
- May 2001 to Nov 2022
- Last 24 months
- 0 permits filed
41 permits since 2000: 39 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
9 kitchen remodel permits: 9 completed. Typically 0 days from filing to permit and 107 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 24, 2019 | Completed final sign-off Aug 2019 | 626 Haight St | kitchen remodel new cabines, new counter tile backsplash, tile floor, reuse (e) appliances same location no structural workDetails
kitchen remodel new cabines, new counter tile backsplash, tile floor, reuse (e) appliances same location no structural work | $50,000 |
| Aug 28, 2017 | Completed final sign-off Apr 2018 | 628 Haight St | alterations to kitchen, family room, dining room, master bedroom & bath; alteration to building rear, door and (2) windows at exterior dining room.Details
alterations to kitchen, family room, dining room, master bedroom & bath; alteration to building rear, door and (2) windows at exterior dining room. | $45,000 |
| Feb 13, 2017 | Completed final sign-off Aug 2017 | 59 07th Av | kitchen remodel - no structural work, new cabinets and appliances.Details
kitchen remodel - no structural work, new cabinets and appliances. | $80,000 |
| May 18, 2010 | Completed final sign-off Jan 2012 | 3050 Lyon St | 2 floor rear addition. remodel kitchen, powder room at level 2. add guest bedroom/study, office & bathroom at level 1.Details
2 floor rear addition. remodel kitchen, powder room at level 2. add guest bedroom/study, office & bathroom at level 1. | $200,000 |
| Apr 16, 2008 | Completed final sign-off Apr 2009 | 620 El Camino Del Mar | complete 1 story garage begin for pa #200603066073 w/ dcp variance #2005.0004v. extend kitchen 6ft onto existing deck and remodel kitchen, deck off kitchen extends into side yard under variance 2005.0004v. the 3rd fl master bath is expanded 215 sq ft and remodeled. 311 notification sent in 2005.Details
complete 1 story garage begin for pa #200603066073 w/ dcp variance #2005.0004v. extend kitchen 6ft onto existing deck and remodel kitchen, deck off kitchen extends into side yard under variance 2005.0004v. the 3rd fl master bath is expanded 215 sq ft and remodeled. 311 notification sent in 2005. | $225,000 |
| Dec 17, 2007 | Completed final sign-off Mar 2008 | 720 Lake St | work on apt#4.kitchen remodel: cabinets, insulation, sheetrock, small dryrot repair counter, sink, appliances, fan hood stove, kick space heater under cabinet. new lighting fluorescent, no structrual.Details
work on apt#4.kitchen remodel: cabinets, insulation, sheetrock, small dryrot repair counter, sink, appliances, fan hood stove, kick space heater under cabinet. new lighting fluorescent, no structrual. | $10,000 |
| May 25, 2007 | Completed final sign-off Aug 2007 | 531 10th Av | revision to app #200503308777:reduce scope of work. eliminate roof alterations, rear additon, kitchen remodel 2nd floor powder room, bathroom #3. ground floor slab will not be replaced with new dropped slab. no changes to sunrom or bedroom #3Details
revision to app #200503308777:reduce scope of work. eliminate roof alterations, rear additon, kitchen remodel 2nd floor powder room, bathroom #3. ground floor slab will not be replaced with new dropped slab. no changes to sunrom or bedroom #3 | |
| Feb 23, 2006 | Completed final sign-off May 2006 | 720 Lake St | install kickspace heater under kitchen cabinetDetails
install kickspace heater under kitchen cabinet | $300 |
| Jan 24, 2006 | Completed final sign-off May 2006 | 720 Lake St | kitchen remodel. cabinets, counter, sink, new appliances, fan, hood, stove. no new walls. new lightingDetails
kitchen remodel. cabinets, counter, sink, new appliances, fan, hood, stove. no new walls. new lighting | $10,000 |