Ben Rogne Construction
- Based in
- San Anselmo
- On San Francisco permits
- May 2001 to Nov 2022
- Last 24 months
- 0 permits filed
41 permits since 2000: 39 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
5 stairs permits: 5 completed. Typically 0 days from filing to permit and 204 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 21, 2017 | Completed final sign-off Feb 2018 | 2825 Bryant St | repair dry rot at front entry stairs . less than 50%. no change to original design.Details
repair dry rot at front entry stairs . less than 50%. no change to original design. | $8,000 |
| Aug 7, 2013 | Completed final sign-off Jul 2015 | 2460 Green St | at 2nd flr, convert (e) deck to living space (+ 28 sf, add 22 sf )at (e) solarium. provide new roof @ (e) solarium @ 2nd flr. provide new windows, remove (e) stair entry court. create (n) terrace at 2nd flr in it's place.Details
at 2nd flr, convert (e) deck to living space (+ 28 sf, add 22 sf )at (e) solarium. provide new roof @ (e) solarium @ 2nd flr. provide new windows, remove (e) stair entry court. create (n) terrace at 2nd flr in it's place. | $120,000 |
| Jul 29, 2013 | Completed final sign-off Nov 2013 | 4248 Cesar Chavez St | replace 2 roof decks orginally approved in 1986. work includes new roofing, membrane, new decking, new railings & repair e stairs. all new work is replacing (e) constructionDetails
replace 2 roof decks orginally approved in 1986. work includes new roofing, membrane, new decking, new railings & repair e stairs. all new work is replacing (e) construction | $45,000 |
| Sep 2, 2005 | Completed final sign-off Jun 2006 | 323 Montcalm St | voluntary latheral upgrade in garage,small rear retaining wall repair rear of yard&frt stairs(>50%).Details
voluntary latheral upgrade in garage,small rear retaining wall repair rear of yard&frt stairs(>50%). | $40,000 |
| May 7, 2001 | Completed final sign-off Nov 2001 | 81 25th Av | engineering revision to 2001/03/13/4120. change rear stairs to platform and return 3' from propertyDetails
engineering revision to 2001/03/13/4120. change rear stairs to platform and return 3' from property |