Back to bathroom remodel contractors
Ben Rogne Construction
- Based in
- San Anselmo
- On San Francisco permits
- May 2001 to Nov 2022
- Last 24 months
- 0 permits filed
41 permits since 2000: 39 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 10 completed. Typically 0 days from filing to permit and 170 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 21, 2022 | Completed final sign-off Jun 2022 | 156 08th Av | bathroom remodel- demo (e) fixtures, plaster, lath and tile. install new electrical, plumbing, fixtures, and tile. no change to floor plan. in kind.Details
bathroom remodel- demo (e) fixtures, plaster, lath and tile. install new electrical, plumbing, fixtures, and tile. no change to floor plan. in kind. | $35,000 |
| Aug 28, 2017 | Completed final sign-off Apr 2018 | 628 Haight St | alterations to kitchen, family room, dining room, master bedroom & bath; alteration to building rear, door and (2) windows at exterior dining room.Details
alterations to kitchen, family room, dining room, master bedroom & bath; alteration to building rear, door and (2) windows at exterior dining room. | $45,000 |
| Sep 23, 2014 | Completed final sign-off May 2015 | 101 Montcalm St | remodeling of ground floor bathroom, reduction of the height of a window for privacy reason. conversion of an extg storage area into a bedroom on the ground floor.Details
remodeling of ground floor bathroom, reduction of the height of a window for privacy reason. conversion of an extg storage area into a bedroom on the ground floor. | $4,800 |
| Aug 18, 2014 | Completed final sign-off Jan 2015 | 2295 Vallejo St | unit 501: replace bathroom fixtures & sheetrock patching & tilingDetails
unit 501: replace bathroom fixtures & sheetrock patching & tiling | $16,000 |
| May 18, 2010 | Completed final sign-off Jan 2012 | 3050 Lyon St | 2 floor rear addition. remodel kitchen, powder room at level 2. add guest bedroom/study, office & bathroom at level 1.Details
2 floor rear addition. remodel kitchen, powder room at level 2. add guest bedroom/study, office & bathroom at level 1. | $200,000 |
| Apr 16, 2008 | Completed final sign-off Apr 2009 | 620 El Camino Del Mar | complete 1 story garage begin for pa #200603066073 w/ dcp variance #2005.0004v. extend kitchen 6ft onto existing deck and remodel kitchen, deck off kitchen extends into side yard under variance 2005.0004v. the 3rd fl master bath is expanded 215 sq ft and remodeled. 311 notification sent in 2005.Details
complete 1 story garage begin for pa #200603066073 w/ dcp variance #2005.0004v. extend kitchen 6ft onto existing deck and remodel kitchen, deck off kitchen extends into side yard under variance 2005.0004v. the 3rd fl master bath is expanded 215 sq ft and remodeled. 311 notification sent in 2005. | $225,000 |
| May 25, 2007 | Completed final sign-off Aug 2007 | 531 10th Av | revision to app #200503308777:reduce scope of work. eliminate roof alterations, rear additon, kitchen remodel 2nd floor powder room, bathroom #3. ground floor slab will not be replaced with new dropped slab. no changes to sunrom or bedroom #3Details
revision to app #200503308777:reduce scope of work. eliminate roof alterations, rear additon, kitchen remodel 2nd floor powder room, bathroom #3. ground floor slab will not be replaced with new dropped slab. no changes to sunrom or bedroom #3 | |
| Jan 24, 2007 | Completed final sign-off Mar 2007 | 1177 California St | remove bath tub, install a shower with new plumbing fixtures and tile. master bath only.Details
remove bath tub, install a shower with new plumbing fixtures and tile. master bath only. | $9,000 |
| Jun 2, 2006 | Completed final sign-off Nov 2006 | 2485 Union St | remove + replace dryrot on wall. in bathroom. remodel bathroom, new tub, toiler, sink, fixtures and tile. all plumbing fixtures replaced into (e) locations. no structural work. no walls moved or added unite #3. for work.Details
remove + replace dryrot on wall. in bathroom. remodel bathroom, new tub, toiler, sink, fixtures and tile. all plumbing fixtures replaced into (e) locations. no structural work. no walls moved or added unite #3. for work. | $16,000 |
| Nov 4, 2003 | Completed final sign-off Oct 2004 | 620 El Camino Del Mar | remodel (e) bathroom, combine 2 bedrooms into master bedroomDetails
remodel (e) bathroom, combine 2 bedrooms into master bedroom | $40,000 |