Ben Rogne Construction
- Based in
- San Anselmo
- On San Francisco permits
- May 2001 to Nov 2022
- Last 24 months
- 0 permits filed
41 permits since 2000: 39 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
4 deck permits: 4 completed. Typically 115 days from filing to permit and 313 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 8, 2015 | Completed final sign-off Jul 2015 | 2460 Green St | revision appl. 2013.0807.3757. total 5 decks at the rear. remove one upper east deck and door. install window into existing opening. repair dry rot in four existing decks. maher n/a. no expansion of existing foot print.Details
revision appl. 2013.0807.3757. total 5 decks at the rear. remove one upper east deck and door. install window into existing opening. repair dry rot in four existing decks. maher n/a. no expansion of existing foot print. | $8,000 |
| Aug 7, 2013 | Completed final sign-off Jul 2015 | 2460 Green St | at 2nd flr, convert (e) deck to living space (+ 28 sf, add 22 sf )at (e) solarium. provide new roof @ (e) solarium @ 2nd flr. provide new windows, remove (e) stair entry court. create (n) terrace at 2nd flr in it's place.Details
at 2nd flr, convert (e) deck to living space (+ 28 sf, add 22 sf )at (e) solarium. provide new roof @ (e) solarium @ 2nd flr. provide new windows, remove (e) stair entry court. create (n) terrace at 2nd flr in it's place. | $120,000 |
| Jun 14, 2013 | Completed final sign-off Jul 2015 | 1953 Webster St | const. a new deck above (e)roof at rear of house/replace window w/a door for access to deck/this project does not involve any changes to to the bldg depth height or width or the conditioned envelopeDetails
const. a new deck above (e)roof at rear of house/replace window w/a door for access to deck/this project does not involve any changes to to the bldg depth height or width or the conditioned envelope | $10,000 |
| Apr 16, 2008 | Completed final sign-off Apr 2009 | 620 El Camino Del Mar | complete 1 story garage begin for pa #200603066073 w/ dcp variance #2005.0004v. extend kitchen 6ft onto existing deck and remodel kitchen, deck off kitchen extends into side yard under variance 2005.0004v. the 3rd fl master bath is expanded 215 sq ft and remodeled. 311 notification sent in 2005.Details
complete 1 story garage begin for pa #200603066073 w/ dcp variance #2005.0004v. extend kitchen 6ft onto existing deck and remodel kitchen, deck off kitchen extends into side yard under variance 2005.0004v. the 3rd fl master bath is expanded 215 sq ft and remodeled. 311 notification sent in 2005. | $225,000 |