Back to bathroom remodel contractors
Bay Marin Construction
- Based in
- San Rafael
- On San Francisco permits
- Feb 2001 to Jun 2016
- Last 24 months
- 0 permits filed
27 permits since 2000: 25 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
16 bathroom remodel permits: 14 completed, 2 expired or cancelled. Typically 0 days from filing to permit and 164 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 10, 2016 | Completed final sign-off Nov 2016 | 142 Arguello Bl | 3rd flr: gut & replace all fixtures & surfaces inmaster bath keeping same layout; add pocket door to master bth entry; in family room add outlets & wiring for new tv location. 2nd (main) flr: in sun rm insulate walls only, add new sheetrock, replace 4 windows with same size dual glazed,low e at rearDetails
3rd flr: gut & replace all fixtures & surfaces inmaster bath keeping same layout; add pocket door to master bth entry; in family room add outlets & wiring for new tv location. 2nd (main) flr: in sun rm insulate walls only, add new sheetrock, replace 4 windows with same size dual glazed,low e at rear | $100,000 |
| Nov 13, 2015 | Completed final sign-off Apr 2016 | 200 Brannan St | complete remodel of master bath - remove non-bearing walls near tub and vanity; replace floor tile in guest bath, vanity and toilet plus light fixtures. repair sheetrock damaged from water leak above unit. replace all fixtures in master bathDetails
complete remodel of master bath - remove non-bearing walls near tub and vanity; replace floor tile in guest bath, vanity and toilet plus light fixtures. repair sheetrock damaged from water leak above unit. replace all fixtures in master bath | $80,000 |
| Oct 27, 2015 | Completed final sign-off Apr 2016 | 142 Arguello Bl | remodel 2 bathrooms on top floor. relocate toilets and sinks. remove closet in bath 2.Details
remodel 2 bathrooms on top floor. relocate toilets and sinks. remove closet in bath 2. | $65,000 |
| Sep 8, 2015 | Completed final sign-off Dec 2015 | 250 Laurel St | unit 102: remodel bathroom in common area (managers unit), no walls moved, removed, added, or infilled. sink to move to foot of shower, remove tub & replace with shower, toilet location to remain unchanged.Details
unit 102: remodel bathroom in common area (managers unit), no walls moved, removed, added, or infilled. sink to move to foot of shower, remove tub & replace with shower, toilet location to remain unchanged. | $30,000 |
| Feb 26, 2015 | Completed final sign-off Jul 2015 | 75 Folsom St | #1700 - demo existing kitchen & bath. install new ktichen & bath. install new flooring throughout unit, remove 1/2 wall between kitchen & living room. add pony wall between tub & counter in bath, create niche in entry foyer. n/a maher ordinanceDetails
#1700 - demo existing kitchen & bath. install new ktichen & bath. install new flooring throughout unit, remove 1/2 wall between kitchen & living room. add pony wall between tub & counter in bath, create niche in entry foyer. n/a maher ordinance | $65,000 |
| Oct 5, 2009 | Completed final sign-off Dec 2009 | 200 Brannan St | remove tub and tile and replace with shower and steam unit of (e) master bath unit 208 on 2nd fl. add new tile, medicine cab and lighting.Details
remove tub and tile and replace with shower and steam unit of (e) master bath unit 208 on 2nd fl. add new tile, medicine cab and lighting. | $40,000 |
| Jul 19, 2007 | Completed final sign-off Jan 2008 | 3755 Jackson St | kitchen & bath remodel - kitchen-enlarge doors, some new cabinetry, new countertops & flooring. top floor: bath - replace tile & fixtures, add steam unit to enlarged shsower. remove brick flue chimney inside of pantry kitchen.Details
kitchen & bath remodel - kitchen-enlarge doors, some new cabinetry, new countertops & flooring. top floor: bath - replace tile & fixtures, add steam unit to enlarged shsower. remove brick flue chimney inside of pantry kitchen. | $80,000 |
| Jul 18, 2006 | Completed final sign-off Jan 2007 | 250 Laurel St | complete remodel of master bathroom, relocate shower drain, upgrade plumbing, add gas line to rear porch.Details
complete remodel of master bathroom, relocate shower drain, upgrade plumbing, add gas line to rear porch. | $25,000 |
| Oct 25, 2005 | Completed final sign-off Dec 2006 | 200 Brannan St | convert 2 tubs into shoer stalls, replace all bath room tiling, replace kitchen counter tops, replace master bath tub with a smaller jacuzzi tub, install new vanity cabinets, new showr plumbing, including shower heads drains.Details
convert 2 tubs into shoer stalls, replace all bath room tiling, replace kitchen counter tops, replace master bath tub with a smaller jacuzzi tub, install new vanity cabinets, new showr plumbing, including shower heads drains. | $50,000 |
| Oct 3, 2005 | Completed final sign-off Apr 2006 | 200 Brannan St | replace all tile in master bath; replace doors in master bath. lower bath & bedrooms. in lower bath: replace tile, pull tub and make shower stall;Details
replace all tile in master bath; replace doors in master bath. lower bath & bedrooms. in lower bath: replace tile, pull tub and make shower stall; | $75,000 |
| May 11, 2005 | Completed final sign-off Oct 2005 | 200 Brannan St | demolish stone counter tops and replace demolish tile in master bath guest bath and powder room replDetails
demolish stone counter tops and replace demolish tile in master bath guest bath and powder room repl | $60,000 |
| Jul 9, 2003 | Expired or cancelled expired Mar 2004 | 2462 Broadway | add skylight to master bath and replace existing window in master bath showerDetails
add skylight to master bath and replace existing window in master bath shower | $4,000 |
| May 14, 2003 | Completed final sign-off Mar 2004 | 2462 Broadway | remodel kitchens & baths throughout apt. relocate elct. service panel; enlarge upper hallway-enlargeDetails
remodel kitchens & baths throughout apt. relocate elct. service panel; enlarge upper hallway-enlarge | $200,000 |
| Oct 22, 2002 | Completed final sign-off Jul 2003 | 2134 Pierce St | remodel bathroom, add shower, install cabinetry/ltg. & upgrade outlets in sitting room, add pocketDetails
remodel bathroom, add shower, install cabinetry/ltg. & upgrade outlets in sitting room, add pocket | $42,000 |
| Feb 27, 2002 | Completed final sign-off Jul 2002 | 7 Laurel St | enlarge opening to bath double sliding door, relocate new plumbing fixtures,vanity, tub, tile, shwrDetails
enlarge opening to bath double sliding door, relocate new plumbing fixtures,vanity, tub, tile, shwr | $30,000 |
| Feb 13, 2001 | Expired or cancelled expired Feb 2002 | 3481 Washington St | remove fireplace in foyer;remove chimney to fireplace;demolish shower in bath 1 on 2nd flr;add new sDetails
remove fireplace in foyer;remove chimney to fireplace;demolish shower in bath 1 on 2nd flr;add new s | $30,000 |