Back to kitchen remodel contractors
Bay Marin Construction
- Based in
- San Rafael
- On San Francisco permits
- Feb 2001 to Jun 2016
- Last 24 months
- 0 permits filed
27 permits since 2000: 25 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
6 kitchen remodel permits: 6 completed. Typically 0 days from filing to permit and 193 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 26, 2015 | Completed final sign-off Jul 2015 | 75 Folsom St | #1700 - demo existing kitchen & bath. install new ktichen & bath. install new flooring throughout unit, remove 1/2 wall between kitchen & living room. add pony wall between tub & counter in bath, create niche in entry foyer. n/a maher ordinanceDetails
#1700 - demo existing kitchen & bath. install new ktichen & bath. install new flooring throughout unit, remove 1/2 wall between kitchen & living room. add pony wall between tub & counter in bath, create niche in entry foyer. n/a maher ordinance | $65,000 |
| Jul 19, 2007 | Completed final sign-off Jan 2008 | 3755 Jackson St | kitchen & bath remodel - kitchen-enlarge doors, some new cabinetry, new countertops & flooring. top floor: bath - replace tile & fixtures, add steam unit to enlarged shsower. remove brick flue chimney inside of pantry kitchen.Details
kitchen & bath remodel - kitchen-enlarge doors, some new cabinetry, new countertops & flooring. top floor: bath - replace tile & fixtures, add steam unit to enlarged shsower. remove brick flue chimney inside of pantry kitchen. | $80,000 |
| Oct 25, 2005 | Completed final sign-off Dec 2006 | 200 Brannan St | convert 2 tubs into shoer stalls, replace all bath room tiling, replace kitchen counter tops, replace master bath tub with a smaller jacuzzi tub, install new vanity cabinets, new showr plumbing, including shower heads drains.Details
convert 2 tubs into shoer stalls, replace all bath room tiling, replace kitchen counter tops, replace master bath tub with a smaller jacuzzi tub, install new vanity cabinets, new showr plumbing, including shower heads drains. | $50,000 |
| Jun 29, 2004 | Completed final sign-off Jan 2005 | 1201 California St | remove one wall in kitchen to make new entrance close in other end of kitchen make one column removeDetails
remove one wall in kitchen to make new entrance close in other end of kitchen make one column remove | $5,000 |
| May 18, 2004 | Completed final sign-off Oct 2004 | 333 Bush St | replace kitchen cabs, countertop etc. add new entrance to master bedroom, add soffit arear + cabs,Details
replace kitchen cabs, countertop etc. add new entrance to master bedroom, add soffit arear + cabs, | $80,000 |
| May 14, 2003 | Completed final sign-off Mar 2004 | 2462 Broadway | remodel kitchens & baths throughout apt. relocate elct. service panel; enlarge upper hallway-enlargeDetails
remodel kitchens & baths throughout apt. relocate elct. service panel; enlarge upper hallway-enlarge | $200,000 |