Bay Marin Construction
- Based in
- San Rafael
- On San Francisco permits
- Feb 2001 to Jun 2016
- Last 24 months
- 0 permits filed
27 permits since 2000: 25 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
3 deck permits: 3 completed. Typically 0 days from filing to permit and 260 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 18, 2008 | Completed final sign-off Aug 2009 | 1810 Green St | remove and replace existing deck in front and back on 3rd level of building. demolish plant shelf on rear deck and extend deck into shelf area. add crickets to divert flow of water on roof, check exterior for leaks and replace rotted or damage siding.reroof under separate permitDetails
remove and replace existing deck in front and back on 3rd level of building. demolish plant shelf on rear deck and extend deck into shelf area. add crickets to divert flow of water on roof, check exterior for leaks and replace rotted or damage siding.reroof under separate permit | $50,000 |
| Jun 17, 2008 | Completed final sign-off Aug 2008 | 7 Laurel St | remove rotted decking above detached garage, replace decking with i p e decking, replace broken glass roof panels above green house at end of deck with plexi glass, repair or replace any rotDetails
remove rotted decking above detached garage, replace decking with i p e decking, replace broken glass roof panels above green house at end of deck with plexi glass, repair or replace any rot | $25,000 |
| Nov 1, 2006 | Completed final sign-off Jul 2007 | 2460 Broadway | remove (e) deck and build new one story deck at rear yard.Details
remove (e) deck and build new one story deck at rear yard. | $30,000 |