Back to kitchen remodel contractors
Andrew Gallagher Construction
- Based in
- Novato
- On San Francisco permits
- Sep 2019 to Jul 2026
- Last 24 months
- 9 permits filed
41 permits since 2000: 30 completed, 4 in progress, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 3 are 3 to 5 years old, 2 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
12 kitchen remodel permits: 8 completed, 1 in progress, 1 never finaled, 2 expired or cancelled. Typically 7 days from filing to permit and 407 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 10, 2024 | Expired or cancelled expired Dec 2025 | 1 Presidio Tr | revision to pa #202406285462. full replace in kind kitchen remodel, powder room replace in kind remodel, and replace in kind master closet remodel.Details
revision to pa #202406285462. full replace in kind kitchen remodel, powder room replace in kind remodel, and replace in kind master closet remodel. | $27,541 |
| Jun 28, 2024 | Expired or cancelled expired Dec 2025 | 1 Presidio Tr | master bathroom remodel in kind, guest bathroom remodel in kind, partial kitchen remodeled cabinet faces and countersDetails
master bathroom remodel in kind, guest bathroom remodel in kind, partial kitchen remodeled cabinet faces and counters | $90,250 |
| Jan 17, 2024 | Completed final sign-off Mar 2024 | 3020 Clay St | replace in kind wood kitchen sashes for 4 windows at the front facade of the building hung and integrated ogsDetails
replace in kind wood kitchen sashes for 4 windows at the front facade of the building hung and integrated ogs | $8,250 |
| Nov 3, 2023 | In progress issued Feb 2025 | 763 Kansas St | 3 story horizontal rear addition to n.east and s.east corners of front bldg, incl interior remodel at all floors for (n) media rm & office at 1st fl, (n) kitchen & pwdr rm @ 2nd fl, 2(n) baths, 1(n) bdrm, & (n) lndry rm @ 3rd fl. (n) roof deck at lvl 4. no work at (e) r-3 cottage @ rear of lot.Details
3 story horizontal rear addition to n.east and s.east corners of front bldg, incl interior remodel at all floors for (n) media rm & office at 1st fl, (n) kitchen & pwdr rm @ 2nd fl, 2(n) baths, 1(n) bdrm, & (n) lndry rm @ 3rd fl. (n) roof deck at lvl 4. no work at (e) r-3 cottage @ rear of lot. | $540,000 |
| Oct 3, 2023 | Completed final sign-off Mar 2024 | 2410 Steiner St | replace in kind primary bathroom remodel. change counter tops in kitchen.Details
replace in kind primary bathroom remodel. change counter tops in kitchen. | $37,542 |
| Mar 15, 2022 | Completed final sign-off Jul 2023 | 764 Faxon Av | renovation of 2 story house to include: kitchen, aster bath, master baedroom, library, bath #1, (n) powder room and replace (e) windows. reconstruct interior and exterior stairs.Details
renovation of 2 story house to include: kitchen, aster bath, master baedroom, library, bath #1, (n) powder room and replace (e) windows. reconstruct interior and exterior stairs. | $200,000 |
| Feb 10, 2022 | Completed final sign-off Jan 2024 | 844 Clayton St | revision to pa 202104208922 1/f interior remodel: remove wall b/t hall and media room, remove laundry closet, show elec and lighting layout in hall, media rm and office. revision to pa 202111222912 in-kind kitchen remodel: reconfigure kitchen layout, remove wall b/t dining and kitchen, new half bathDetails
revision to pa 202104208922 1/f interior remodel: remove wall b/t hall and media room, remove laundry closet, show elec and lighting layout in hall, media rm and office. revision to pa 202111222912 in-kind kitchen remodel: reconfigure kitchen layout, remove wall b/t dining and kitchen, new half bath | $35,231 |
| Nov 22, 2021 | Completed final sign-off Aug 2023 | 844 Clayton St | replace in kind kitchen. new cabinets, counters and electrical. replace in kind 2 doors and 1 window at rear of building.Details
replace in kind kitchen. new cabinets, counters and electrical. replace in kind 2 doors and 1 window at rear of building. | $55,000 |
| Mar 24, 2021 | Never finaled issued Mar 2021, no final | 771 Elizabeth St | kitchen remodel. replace cabinets, countertop, backspash, lights and paint.Details
kitchen remodel. replace cabinets, countertop, backspash, lights and paint. | $45,000 |
| Feb 1, 2021 | Completed final sign-off Apr 2022 | 2537 Chestnut St | interior renovation of (e) 1/f & 2/f: partial conversion of 1/f floor area from non-habitable to habitable including new rec room, laundry, storage and bathroom. 2/f: new bathrooms, kitchen remodel, remove walls. no increase in gross sf.Details
interior renovation of (e) 1/f & 2/f: partial conversion of 1/f floor area from non-habitable to habitable including new rec room, laundry, storage and bathroom. 2/f: new bathrooms, kitchen remodel, remove walls. no increase in gross sf. | $150,000 |
| Nov 20, 2020 | Completed final sign-off Jan 2022 | 137 03rd Av | remove (e) wall between kitchen and dining room, new kitchen island, lighting and gfci receptacles, relocate hvac air register, new sliding patio doors to rear deck, replce bath vanity & sinks.Details
remove (e) wall between kitchen and dining room, new kitchen island, lighting and gfci receptacles, relocate hvac air register, new sliding patio doors to rear deck, replce bath vanity & sinks. | $45,000 |
| Oct 20, 2020 | Completed final sign-off Apr 2022 | 132 Marview Wy | interior remodel not visible from street: 1/f reconfig (e) interior open stair connecting two floors. enlarge and reconfigure (e) bedroom, relocate bathroom and laundry room. 2/f: remodel kitchen , bathroom & bedroom.Details
interior remodel not visible from street: 1/f reconfig (e) interior open stair connecting two floors. enlarge and reconfigure (e) bedroom, relocate bathroom and laundry room. 2/f: remodel kitchen , bathroom & bedroom. | $140,000 |