Back to bathroom remodel contractors
Andrew Gallagher Construction
- Based in
- Novato
- On San Francisco permits
- Sep 2019 to Jul 2026
- Last 24 months
- 9 permits filed
41 permits since 2000: 30 completed, 4 in progress, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 3 are 3 to 5 years old, 2 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
20 bathroom remodel permits: 16 completed, 2 in progress, 1 never finaled, 1 expired or cancelled. Typically 48 days from filing to permit and 400 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 25, 2026 | Completed final sign-off Jun 2026 | 2611 California St | replace in kind remodel of 2 bathrooms.Details
replace in kind remodel of 2 bathrooms. | $54,789 |
| Aug 13, 2025 | In progress issued May 2026 | 1516 Shrader St | renovation to (e) ground floor & increase in habitable space which includes an art studio, bedroom & bathroom. demo (e) 95 sf wood deck. rebuild new 68 sf deck. remodel of primary bathroom & addition of bay window at primary bedroom.Details
renovation to (e) ground floor & increase in habitable space which includes an art studio, bedroom & bathroom. demo (e) 95 sf wood deck. rebuild new 68 sf deck. remodel of primary bathroom & addition of bay window at primary bedroom. | $135,000 |
| Jan 27, 2025 | Completed final sign-off May 2025 | 457 Diamond St | revision 202109208778- remodel bathroom at 1st floor to change layout. no structural workDetails
revision 202109208778- remodel bathroom at 1st floor to change layout. no structural work | $15,252 |
| Dec 17, 2024 | Completed final sign-off Feb 2026 | 152 Collins St | 3/f: renovate 3/f and rebuild rear roof. replace 3/f powder room with full bathroom. new egress window for 3/f bedrooms. add 3 bedrooms by reallocating (e) rooms on 3/f.Details
3/f: renovate 3/f and rebuild rear roof. replace 3/f powder room with full bathroom. new egress window for 3/f bedrooms. add 3 bedrooms by reallocating (e) rooms on 3/f. | $67,300 |
| Sep 26, 2024 | Completed final sign-off Mar 2026 | 55 San Buenaventura Wy | in kind window & door replacements (all sides) (n) doors at rear of home. bathroom remodels. alterd space at basement level. new interior stairs replacing existing from 1st to basement. new wet bar at first fl, select (n) lighting & electrical throughout. (e) chimney at rear to be removed.Details
in kind window & door replacements (all sides) (n) doors at rear of home. bathroom remodels. alterd space at basement level. new interior stairs replacing existing from 1st to basement. new wet bar at first fl, select (n) lighting & electrical throughout. (e) chimney at rear to be removed. | $371,458 |
| Jun 28, 2024 | Expired or cancelled expired Dec 2025 | 1 Presidio Tr | master bathroom remodel in kind, guest bathroom remodel in kind, partial kitchen remodeled cabinet faces and countersDetails
master bathroom remodel in kind, guest bathroom remodel in kind, partial kitchen remodeled cabinet faces and counters | $90,250 |
| Nov 3, 2023 | In progress issued Feb 2025 | 763 Kansas St | 3 story horizontal rear addition to n.east and s.east corners of front bldg, incl interior remodel at all floors for (n) media rm & office at 1st fl, (n) kitchen & pwdr rm @ 2nd fl, 2(n) baths, 1(n) bdrm, & (n) lndry rm @ 3rd fl. (n) roof deck at lvl 4. no work at (e) r-3 cottage @ rear of lot.Details
3 story horizontal rear addition to n.east and s.east corners of front bldg, incl interior remodel at all floors for (n) media rm & office at 1st fl, (n) kitchen & pwdr rm @ 2nd fl, 2(n) baths, 1(n) bdrm, & (n) lndry rm @ 3rd fl. (n) roof deck at lvl 4. no work at (e) r-3 cottage @ rear of lot. | $540,000 |
| Oct 10, 2023 | Completed final sign-off Mar 2025 | 1263 Stanyan St | revision to pa# 202108176540, relocation of 1st flr bathroom, change 1 partition wall, change location of 1 exterior side door. not visible from street.Details
revision to pa# 202108176540, relocation of 1st flr bathroom, change 1 partition wall, change location of 1 exterior side door. not visible from street. | $27,500 |
| Oct 3, 2023 | Completed final sign-off Mar 2024 | 2410 Steiner St | replace in kind primary bathroom remodel. change counter tops in kitchen.Details
replace in kind primary bathroom remodel. change counter tops in kitchen. | $37,542 |
| Aug 24, 2023 | Completed final sign-off Jan 2024 | 67 Pond St | interior remodel of bathroom and bedroom, upper unit only (1 story)Details
interior remodel of bathroom and bedroom, upper unit only (1 story) | $39,500 |
| Jul 31, 2023 | Completed final sign-off Oct 2024 | 4043 19th St | revision to pa202112285077. revise framing above garage to accommodate garage overhead door, vaulted ceiling @ 3/f master bedroom, revised window @ 3/f master bath, & revised skylights on roof.Details
revision to pa202112285077. revise framing above garage to accommodate garage overhead door, vaulted ceiling @ 3/f master bedroom, revised window @ 3/f master bath, & revised skylights on roof. | |
| Mar 15, 2022 | Completed final sign-off Jul 2023 | 764 Faxon Av | renovation of 2 story house to include: kitchen, aster bath, master baedroom, library, bath #1, (n) powder room and replace (e) windows. reconstruct interior and exterior stairs.Details
renovation of 2 story house to include: kitchen, aster bath, master baedroom, library, bath #1, (n) powder room and replace (e) windows. reconstruct interior and exterior stairs. | $200,000 |
| Feb 10, 2022 | Completed final sign-off Jan 2024 | 844 Clayton St | revision to pa 202104208922 1/f interior remodel: remove wall b/t hall and media room, remove laundry closet, show elec and lighting layout in hall, media rm and office. revision to pa 202111222912 in-kind kitchen remodel: reconfigure kitchen layout, remove wall b/t dining and kitchen, new half bathDetails
revision to pa 202104208922 1/f interior remodel: remove wall b/t hall and media room, remove laundry closet, show elec and lighting layout in hall, media rm and office. revision to pa 202111222912 in-kind kitchen remodel: reconfigure kitchen layout, remove wall b/t dining and kitchen, new half bath | $35,231 |
| Sep 20, 2021 | Completed final sign-off May 2025 | 457 Diamond St | one story horizontal addition. (n) bedrooms (2) ground floor level 1. addition of interior stair from level to level 2.(n) bathroom @ level 1.Details
one story horizontal addition. (n) bedrooms (2) ground floor level 1. addition of interior stair from level to level 2.(n) bathroom @ level 1. | $500,000 |
| Apr 20, 2021 | Completed final sign-off Jan 2024 | 844 Clayton St | add new media room, office, laundry closet & bath at 1st fl. new concrete slab @ 1st fl except garage; excavate approx. 24 cu. yard of soil.Details
add new media room, office, laundry closet & bath at 1st fl. new concrete slab @ 1st fl except garage; excavate approx. 24 cu. yard of soil. | $65,000 |
| Feb 1, 2021 | Completed final sign-off Apr 2022 | 2537 Chestnut St | interior renovation of (e) 1/f & 2/f: partial conversion of 1/f floor area from non-habitable to habitable including new rec room, laundry, storage and bathroom. 2/f: new bathrooms, kitchen remodel, remove walls. no increase in gross sf.Details
interior renovation of (e) 1/f & 2/f: partial conversion of 1/f floor area from non-habitable to habitable including new rec room, laundry, storage and bathroom. 2/f: new bathrooms, kitchen remodel, remove walls. no increase in gross sf. | $150,000 |
| Nov 20, 2020 | Completed final sign-off Jan 2022 | 137 03rd Av | remove (e) wall between kitchen and dining room, new kitchen island, lighting and gfci receptacles, relocate hvac air register, new sliding patio doors to rear deck, replce bath vanity & sinks.Details
remove (e) wall between kitchen and dining room, new kitchen island, lighting and gfci receptacles, relocate hvac air register, new sliding patio doors to rear deck, replce bath vanity & sinks. | $45,000 |
| Oct 20, 2020 | Completed final sign-off Apr 2022 | 132 Marview Wy | interior remodel not visible from street: 1/f reconfig (e) interior open stair connecting two floors. enlarge and reconfigure (e) bedroom, relocate bathroom and laundry room. 2/f: remodel kitchen , bathroom & bedroom.Details
interior remodel not visible from street: 1/f reconfig (e) interior open stair connecting two floors. enlarge and reconfigure (e) bedroom, relocate bathroom and laundry room. 2/f: remodel kitchen , bathroom & bedroom. | $140,000 |
| Oct 10, 2020 | Never finaled issued Jan 2021, no final | 2537 Chestnut St | interior renovation of (e) upper level master closet and master bathroom. no increase in sq ft.Details
interior renovation of (e) upper level master closet and master bathroom. no increase in sq ft. | $43,000 |
| Aug 10, 2020 | Completed final sign-off Jul 2023 | 311 Jersey St | vertical addition to include a roof deck above and a stair penthouse structure for access. no alteration of front facade.project to include new interior stair, 3 bedrooms + 2 bathrooms @ new 2nd floor, & remodeled laundry area @ 1st floor.new windows, doors, electrical / enwork as req'd.Details
vertical addition to include a roof deck above and a stair penthouse structure for access. no alteration of front facade.project to include new interior stair, 3 bedrooms + 2 bathrooms @ new 2nd floor, & remodeled laundry area @ 1st floor.new windows, doors, electrical / enwork as req'd. | $288,000 |