Andrew Gallagher Construction
- Based in
- Novato
- On San Francisco permits
- Sep 2019 to Jul 2026
- Last 24 months
- 9 permits filed
41 permits since 2000: 30 completed, 4 in progress, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 3 are 3 to 5 years old, 2 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
10 stairs permits: 9 completed, 1 in progress. Typically 264 days from filing to permit and 464 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 5, 2025 | Completed final sign-off Sep 2026 | 20 Alton Av | horizontal addition for new stairs at 3rd fl. interior remodel. lower floor at media room at ground level to create more ceiling height. 9 (n) windows and 1 (n) sliding door. removal of (e) rear deckDetails
horizontal addition for new stairs at 3rd fl. interior remodel. lower floor at media room at ground level to create more ceiling height. 9 (n) windows and 1 (n) sliding door. removal of (e) rear deck | $300,000 |
| Sep 26, 2024 | Completed final sign-off Mar 2026 | 55 San Buenaventura Wy | in kind window & door replacements (all sides) (n) doors at rear of home. bathroom remodels. alterd space at basement level. new interior stairs replacing existing from 1st to basement. new wet bar at first fl, select (n) lighting & electrical throughout. (e) chimney at rear to be removed.Details
in kind window & door replacements (all sides) (n) doors at rear of home. bathroom remodels. alterd space at basement level. new interior stairs replacing existing from 1st to basement. new wet bar at first fl, select (n) lighting & electrical throughout. (e) chimney at rear to be removed. | $371,458 |
| Aug 29, 2023 | In progress issued Nov 2025 | 1027 Hayes St | partial renovation of 2 story, 3 unit building. add storage space at sidwalk level below entry stairs.Details
partial renovation of 2 story, 3 unit building. add storage space at sidwalk level below entry stairs. | $487,433 |
| Oct 11, 2022 | Completed final sign-off Jul 2023 | 764 Faxon Av | revision to 202203150021 & 202206136167: reconstruct (e) front stairs & landing in-kind.Details
revision to 202203150021 & 202206136167: reconstruct (e) front stairs & landing in-kind. | $10,000 |
| Mar 15, 2022 | Completed final sign-off Jul 2023 | 764 Faxon Av | renovation of 2 story house to include: kitchen, aster bath, master baedroom, library, bath #1, (n) powder room and replace (e) windows. reconstruct interior and exterior stairs.Details
renovation of 2 story house to include: kitchen, aster bath, master baedroom, library, bath #1, (n) powder room and replace (e) windows. reconstruct interior and exterior stairs. | $200,000 |
| Dec 28, 2021 | Completed final sign-off Oct 2024 | 4043 19th St | excavate under bldg for new basement & garage. add 10'-0" curb cut at new garage entry. reconstruct front stair. renovate interior. add residential elevator.Details
excavate under bldg for new basement & garage. add 10'-0" curb cut at new garage entry. reconstruct front stair. renovate interior. add residential elevator. | $650,000 |
| Sep 20, 2021 | Completed final sign-off May 2025 | 457 Diamond St | one story horizontal addition. (n) bedrooms (2) ground floor level 1. addition of interior stair from level to level 2.(n) bathroom @ level 1.Details
one story horizontal addition. (n) bedrooms (2) ground floor level 1. addition of interior stair from level to level 2.(n) bathroom @ level 1. | $500,000 |
| Oct 20, 2020 | Completed final sign-off Apr 2022 | 132 Marview Wy | interior remodel not visible from street: 1/f reconfig (e) interior open stair connecting two floors. enlarge and reconfigure (e) bedroom, relocate bathroom and laundry room. 2/f: remodel kitchen , bathroom & bedroom.Details
interior remodel not visible from street: 1/f reconfig (e) interior open stair connecting two floors. enlarge and reconfigure (e) bedroom, relocate bathroom and laundry room. 2/f: remodel kitchen , bathroom & bedroom. | $140,000 |
| Aug 10, 2020 | Completed final sign-off Jul 2023 | 311 Jersey St | vertical addition to include a roof deck above and a stair penthouse structure for access. no alteration of front facade.project to include new interior stair, 3 bedrooms + 2 bathrooms @ new 2nd floor, & remodeled laundry area @ 1st floor.new windows, doors, electrical / enwork as req'd.Details
vertical addition to include a roof deck above and a stair penthouse structure for access. no alteration of front facade.project to include new interior stair, 3 bedrooms + 2 bathrooms @ new 2nd floor, & remodeled laundry area @ 1st floor.new windows, doors, electrical / enwork as req'd. | $288,000 |
| Sep 20, 2019 | Completed final sign-off Dec 2022 | 580 Hill St | new garage and relocation of entry stairs at property front.Details
new garage and relocation of entry stairs at property front. | $50,000 |