Permit GraphShortlistSan Francisco building permits since 2000

Andrew Gallagher Construction

Contractor license
1071921
State license record
Based in
Novato
On San Francisco permits
Sep 2019 to Jul 2026
Last 24 months
9 permits filed

41 permits since 2000: 30 completed, 4 in progress, 5 never finaled, 2 expired or cancelled.

Of the 5 never-finaled permits, 3 are 3 to 5 years old, 2 are 5 to 10 years old. 1 was filed but never issued.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Stairs permits

AllRoof deck 2Deck 3Stairs 10Kitchen remodel 12Bathroom remodel 20

10 stairs permits: 9 completed, 1 in progress. Typically 264 days from filing to permit and 464 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Jun 5, 2025Completed
final sign-off Sep 2026
20 Alton Avhorizontal addition for new stairs at 3rd fl. interior remodel. lower floor at media room at ground level to create more ceiling height. 9 (n) windows and 1 (n) sliding door. removal of (e) rear deck
Details
Permit
202506058067
Status
complete
Filed
Jun 5, 2025
Permit issued
Jul 1, 2025
Final sign-off
Sep 29, 2026
Declared cost
$300,000
Address
20 Alton Av

horizontal addition for new stairs at 3rd fl. interior remodel. lower floor at media room at ground level to create more ceiling height. 9 (n) windows and 1 (n) sliding door. removal of (e) rear deck

Open the permit page

$300,000
Sep 26, 2024Completed
final sign-off Mar 2026
55 San Buenaventura Wyin kind window & door replacements (all sides) (n) doors at rear of home. bathroom remodels. alterd space at basement level. new interior stairs replacing existing from 1st to basement. new wet bar at first fl, select (n) lighting & electrical throughout. (e) chimney at rear to be removed.
Details
Permit
202409261734
Status
complete
Filed
Sep 26, 2024
Permit issued
Oct 7, 2024
Final sign-off
Mar 10, 2026
Declared cost
$371,458
Address
55 San Buenaventura Wy

in kind window & door replacements (all sides) (n) doors at rear of home. bathroom remodels. alterd space at basement level. new interior stairs replacing existing from 1st to basement. new wet bar at first fl, select (n) lighting & electrical throughout. (e) chimney at rear to be removed.

Open the permit page

$371,458
Aug 29, 2023In progress
issued Nov 2025
1027 Hayes Stpartial renovation of 2 story, 3 unit building. add storage space at sidwalk level below entry stairs.
Details
Permit
202308295507
Status
issued
Filed
Aug 29, 2023
Permit issued
Nov 17, 2025
Declared cost
$487,433
Address
1027 Hayes St

partial renovation of 2 story, 3 unit building. add storage space at sidwalk level below entry stairs.

Open the permit page

$487,433
Oct 11, 2022Completed
final sign-off Jul 2023
764 Faxon Avrevision to 202203150021 & 202206136167: reconstruct (e) front stairs & landing in-kind.
Details
Permit
202210114078
Status
complete
Filed
Oct 11, 2022
Permit issued
Oct 13, 2022
Final sign-off
Jul 19, 2023
Declared cost
$10,000
Address
764 Faxon Av

revision to 202203150021 & 202206136167: reconstruct (e) front stairs & landing in-kind.

Open the permit page

$10,000
Mar 15, 2022Completed
final sign-off Jul 2023
764 Faxon Avrenovation of 2 story house to include: kitchen, aster bath, master baedroom, library, bath #1, (n) powder room and replace (e) windows. reconstruct interior and exterior stairs.
Details
Permit
202203150021
Status
complete
Filed
Mar 15, 2022
Permit issued
Apr 11, 2022
Final sign-off
Jul 19, 2023
Declared cost
$200,000
Address
764 Faxon Av

renovation of 2 story house to include: kitchen, aster bath, master baedroom, library, bath #1, (n) powder room and replace (e) windows. reconstruct interior and exterior stairs.

Open the permit page

$200,000
Dec 28, 2021Completed
final sign-off Oct 2024
4043 19th Stexcavate under bldg for new basement & garage. add 10'-0" curb cut at new garage entry. reconstruct front stair. renovate interior. add residential elevator.
Details
Permit
202112285077
Status
complete
Filed
Dec 28, 2021
Permit issued
Apr 14, 2023
Final sign-off
Oct 17, 2024
Declared cost
$650,000
Address
4043 19th St

excavate under bldg for new basement & garage. add 10'-0" curb cut at new garage entry. reconstruct front stair. renovate interior. add residential elevator.

Open the permit page

$650,000
Sep 20, 2021Completed
final sign-off May 2025
457 Diamond Stone story horizontal addition. (n) bedrooms (2) ground floor level 1. addition of interior stair from level to level 2.(n) bathroom @ level 1.
Details
Permit
202109208778
Status
complete
Filed
Sep 20, 2021
Permit issued
Jul 9, 2024
Final sign-off
May 23, 2025
Declared cost
$500,000
Address
457 Diamond St

one story horizontal addition. (n) bedrooms (2) ground floor level 1. addition of interior stair from level to level 2.(n) bathroom @ level 1.

Open the permit page

$500,000
Oct 20, 2020Completed
final sign-off Apr 2022
132 Marview Wyinterior remodel not visible from street: 1/f reconfig (e) interior open stair connecting two floors. enlarge and reconfigure (e) bedroom, relocate bathroom and laundry room. 2/f: remodel kitchen , bathroom & bedroom.
Details
Permit
202010206939
Status
complete
Filed
Oct 20, 2020
Permit issued
Feb 9, 2021
Final sign-off
Apr 26, 2022
Declared cost
$140,000
Address
132 Marview Wy

interior remodel not visible from street: 1/f reconfig (e) interior open stair connecting two floors. enlarge and reconfigure (e) bedroom, relocate bathroom and laundry room. 2/f: remodel kitchen , bathroom & bedroom.

Open the permit page

$140,000
Aug 10, 2020Completed
final sign-off Jul 2023
311 Jersey Stvertical addition to include a roof deck above and a stair penthouse structure for access. no alteration of front facade.project to include new interior stair, 3 bedrooms + 2 bathrooms @ new 2nd floor, & remodeled laundry area @ 1st floor.new windows, doors, electrical / enwork as req'd.
Details
Permit
202008101497
Status
complete
Filed
Aug 10, 2020
Permit issued
Feb 17, 2022
Final sign-off
Jul 18, 2023
Declared cost
$288,000
Address
311 Jersey St

vertical addition to include a roof deck above and a stair penthouse structure for access. no alteration of front facade.project to include new interior stair, 3 bedrooms + 2 bathrooms @ new 2nd floor, & remodeled laundry area @ 1st floor.new windows, doors, electrical / enwork as req'd.

Open the permit page

$288,000
Sep 20, 2019Completed
final sign-off Dec 2022
580 Hill Stnew garage and relocation of entry stairs at property front.
Details
Permit
201909202222
Status
complete
Filed
Sep 20, 2019
Permit issued
Nov 10, 2020
Final sign-off
Dec 5, 2022
Declared cost
$50,000
Address
580 Hill St

new garage and relocation of entry stairs at property front.

Open the permit page

$50,000