Andrew Gallagher Construction
- Based in
- Novato
- On San Francisco permits
- Sep 2019 to Jul 2026
- Last 24 months
- 9 permits filed
41 permits since 2000: 30 completed, 4 in progress, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 3 are 3 to 5 years old, 2 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
3 deck permits: 2 completed, 1 in progress. Typically 69 days from filing to permit and 402 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 13, 2025 | In progress issued May 2026 | 1516 Shrader St | renovation to (e) ground floor & increase in habitable space which includes an art studio, bedroom & bathroom. demo (e) 95 sf wood deck. rebuild new 68 sf deck. remodel of primary bathroom & addition of bay window at primary bedroom.Details
renovation to (e) ground floor & increase in habitable space which includes an art studio, bedroom & bathroom. demo (e) 95 sf wood deck. rebuild new 68 sf deck. remodel of primary bathroom & addition of bay window at primary bedroom. | $135,000 |
| Jun 5, 2025 | Completed final sign-off Sep 2026 | 20 Alton Av | horizontal addition for new stairs at 3rd fl. interior remodel. lower floor at media room at ground level to create more ceiling height. 9 (n) windows and 1 (n) sliding door. removal of (e) rear deckDetails
horizontal addition for new stairs at 3rd fl. interior remodel. lower floor at media room at ground level to create more ceiling height. 9 (n) windows and 1 (n) sliding door. removal of (e) rear deck | $300,000 |
| Nov 20, 2020 | Completed final sign-off Jan 2022 | 137 03rd Av | remove (e) wall between kitchen and dining room, new kitchen island, lighting and gfci receptacles, relocate hvac air register, new sliding patio doors to rear deck, replce bath vanity & sinks.Details
remove (e) wall between kitchen and dining room, new kitchen island, lighting and gfci receptacles, relocate hvac air register, new sliding patio doors to rear deck, replce bath vanity & sinks. | $45,000 |