Block 2830, lot 033
771 Elizabeth St
- City’s use
- Single Family Residential
- Built
- 1905
- Stories
- 2
- Units
- 1
- Rooms
- 4 bedrooms, 4 bathrooms
- Building
- 1,895 sq ft
- Lot
- 2,962 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
13 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 3, 2026 | In progress issued Aug 2026 | 771 Elizabeth St | Make It Right Carpentry Inc | (1) bathroom remodel, like for like. no relocation of plumbing or electrical.Details
(1) bathroom remodel, like for like. no relocation of plumbing or electrical. | $15,000 |
| Jul 20, 2023 | Completed final sign-off Oct 2023 | 771 Elizabeth St | Mark Brockley Construction | remodel 1 bathroom in kind- same fixtures locations, new ceramic tile, tub, vanity, toilet.Details
remodel 1 bathroom in kind- same fixtures locations, new ceramic tile, tub, vanity, toilet. | $25,000 |
| Mar 24, 2021 | Never finaled issued Mar 2021, no final | 771 Elizabeth St | Andrew Gallagher Construction | kitchen remodel. replace cabinets, countertop, backspash, lights and paint.Details
kitchen remodel. replace cabinets, countertop, backspash, lights and paint. | $45,000 |
| Nov 25, 2020 | Completed final sign-off May 2021 | 771 Elizabeth St | Untitled Labs Inc Dba Made Renovation | bathroom remodel in-kind (38 sq ft) ground flr (n) walk-in shower (n) bidet (n) vanity (n) fixtures (n) floor & wall tileDetails
bathroom remodel in-kind (38 sq ft) ground flr (n) walk-in shower (n) bidet (n) vanity (n) fixtures (n) floor & wall tile | $14,500 |
| May 16, 2016 | Never finaled issued May 2016, no final | 771 Elizabeth St | Larry Guenther Construction | repair handrail base at front entrance steps. retain upper rail baulisters and newel post.Details
repair handrail base at front entrance steps. retain upper rail baulisters and newel post. | $2,500 |
| Mar 9, 2016 | Never finaled issued Mar 2016, no final | 771 Elizabeth St | street space permitDetails
street space permit | ||
| Apr 10, 2015 | Completed final sign-off Sep 2016 | 771 Elizabeth St | Dugarry Construction Inc | 1st fl-relocate ext. stairs to 2nd fl, deck, construct storage room under (n) 2nd fl. deck. 2nd fl- replace deck @ rear yard. 3rd fl-construct (n) deck over 2nd fl roof. remodel master. bath.Details
1st fl-relocate ext. stairs to 2nd fl, deck, construct storage room under (n) 2nd fl. deck. 2nd fl- replace deck @ rear yard. 3rd fl-construct (n) deck over 2nd fl roof. remodel master. bath. | $65,000 |
| Aug 13, 2009 | Never finaled issued Aug 2009, no final | 771 Elizabeth St | street space and sidewalk repairDetails
street space and sidewalk repair | ||
| Oct 5, 2007 | Never finaled issued Oct 2007, no final | 771 Elizabeth St | under pin 7 1/2 ft of existing foundationDetails
under pin 7 1/2 ft of existing foundation | $3,500 | |
| Oct 5, 2004 | Completed final sign-off Nov 2004 | 771 Elizabeth St | repace front deteriorated stairs same location and size per planDetails
repace front deteriorated stairs same location and size per plan | $8,800 | |
| Aug 17, 2004 | Completed final sign-off Nov 2004 | 771 Elizabeth St | Manuel Galvez Construction | upgrade exist foundation, new laundry rm gr floor, new side stairs 7'6 to grade, new bath gr flrDetails
upgrade exist foundation, new laundry rm gr floor, new side stairs 7'6 to grade, new bath gr flr | $18,000 |
| Aug 5, 2004 | Completed final sign-off Nov 2004 | 771 Elizabeth St | new bathrooms in second and 3rd fl. new skilight (flat). kitchen bathrooms-hollway. new none veringDetails
new bathrooms in second and 3rd fl. new skilight (flat). kitchen bathrooms-hollway. new none vering | $30,000 | |
| Jul 8, 2004 | Completed final sign-off Nov 2004 | 771 Elizabeth St | repair roof, rmodel bath, replace damaged sheet rock and ceiling and walls, replace side and back wiDetails
repair roof, rmodel bath, replace damaged sheet rock and ceiling and walls, replace side and back wi | $30,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Andrew Gallagher Construction, Dugarry Construction Inc, Larry Guenther Construction, Make It Right Carpentry Inc, Manuel Galvez Construction, Mark Brockley Construction, Untitled Labs Inc Dba Made Renovation
- Architects
- William Egan
- Authorized agent-otherss
- Harvey Wong
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.