Back to kitchen remodel contractors
Andes General Construction
- Based in
- Greenbrae
- On San Francisco permits
- Sep 2007 to Apr 2015
- Last 24 months
- 0 permits filed
33 permits since 2000: 31 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
10 kitchen remodel permits: 9 completed, 1 never finaled. Typically 6 days from filing to permit and 117 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 23, 2015 | Completed final sign-off Aug 2015 | 2055 Polk St | remodel interior of apt 3. remove wall, install beam and post, add wall for new bedroom. relocate kitchenDetails
remodel interior of apt 3. remove wall, install beam and post, add wall for new bedroom. relocate kitchen | $25,000 |
| Sep 26, 2014 | Completed final sign-off Dec 2014 | 2055 Polk St | revision to pa# 2014 0630 0018. revise footing design & kitchen layout in apt 5. reduce extent of work.Details
revision to pa# 2014 0630 0018. revise footing design & kitchen layout in apt 5. reduce extent of work. | |
| Jun 30, 2014 | Completed final sign-off Dec 2014 | 2055 Polk St | remodel apartment 5 on 2nd floor. remove wall, add beams. relocate kitchen.Details
remodel apartment 5 on 2nd floor. remove wall, add beams. relocate kitchen. | $20,000 |
| Jun 9, 2014 | Completed final sign-off Dec 2014 | 811 14th St | remodel in apt #1: divide living room studio into (2) new bedrooms and remodel kitchen.Details
remodel in apt #1: divide living room studio into (2) new bedrooms and remodel kitchen. | $30,000 |
| Jun 6, 2014 | Never finaled issued Jun 2014, no final | 811 14th St | unit 9. complete remodeling of kitchen & bathroom. no window, no doors.Details
unit 9. complete remodeling of kitchen & bathroom. no window, no doors. | $19,500 |
| Jun 18, 2013 | Completed final sign-off Jun 2013 | 336 Day St | minor revisions to permit #201303081800; adding a skylight, enlarging an attic access hatch, in (e) kitchen ceiling-adding a 4x4 post in (e) wall minor enlargement of (e) opening in interior wall from 1'-o" wide to 1'-8" wideDetails
minor revisions to permit #201303081800; adding a skylight, enlarging an attic access hatch, in (e) kitchen ceiling-adding a 4x4 post in (e) wall minor enlargement of (e) opening in interior wall from 1'-o" wide to 1'-8" wide | $3,000 |
| Mar 8, 2013 | Completed final sign-off Jul 2013 | 336 Day St | renovation of a kitchen & bath within a single family home, removal of one existing side window (facing lightwell), electricla & plumbing involved.Details
renovation of a kitchen & bath within a single family home, removal of one existing side window (facing lightwell), electricla & plumbing involved. | $75,000 |
| Jun 30, 2011 | Completed final sign-off Jul 2012 | 49 Clayton St | remodel kitchen & bathroom, removal of non bearing ktichen wall, add new bathroom & 5 skylights, rewire electrical, replace (5) windows in kind (same size and location), one new window (not facing street). all walls non structural, verify before removal.Details
remodel kitchen & bathroom, removal of non bearing ktichen wall, add new bathroom & 5 skylights, rewire electrical, replace (5) windows in kind (same size and location), one new window (not facing street). all walls non structural, verify before removal. | $65,000 |
| Sep 1, 2009 | Completed final sign-off Dec 2009 | 89 Chattanooga St | renovation of 2nd fl apt in a 2 story bldg w/commercial below. renovate kitchen and bath. remove 2 non bearing interior partition walls. remove dropped ceiling. add recessed cans.Details
renovation of 2nd fl apt in a 2 story bldg w/commercial below. renovate kitchen and bath. remove 2 non bearing interior partition walls. remove dropped ceiling. add recessed cans. | $23,000 |
| Jul 1, 2009 | Completed final sign-off Oct 2010 | 164 Otsego Av | addition to rear of residence (120 sq.ft.) at living level, new rear deck (130 sq. ft.) to be added. kitchen + bath remodel on living level. new dormer on rear upper level-remodel bath + bedrooms, new interior stair to connect to ground level.Details
addition to rear of residence (120 sq.ft.) at living level, new rear deck (130 sq. ft.) to be added. kitchen + bath remodel on living level. new dormer on rear upper level-remodel bath + bedrooms, new interior stair to connect to ground level. | $150,000 |