Back to bathroom remodel contractors
Andes General Construction
- Based in
- Greenbrae
- On San Francisco permits
- Sep 2007 to Apr 2015
- Last 24 months
- 0 permits filed
33 permits since 2000: 31 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 5 completed, 1 never finaled. Typically 2 days from filing to permit and 129 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 6, 2014 | Never finaled issued Jun 2014, no final | 811 14th St | unit 9. complete remodeling of kitchen & bathroom. no window, no doors.Details
unit 9. complete remodeling of kitchen & bathroom. no window, no doors. | $19,500 |
| Mar 8, 2013 | Completed final sign-off Jul 2013 | 336 Day St | renovation of a kitchen & bath within a single family home, removal of one existing side window (facing lightwell), electricla & plumbing involved.Details
renovation of a kitchen & bath within a single family home, removal of one existing side window (facing lightwell), electricla & plumbing involved. | $75,000 |
| Jun 30, 2011 | Completed final sign-off Jul 2012 | 49 Clayton St | remodel kitchen & bathroom, removal of non bearing ktichen wall, add new bathroom & 5 skylights, rewire electrical, replace (5) windows in kind (same size and location), one new window (not facing street). all walls non structural, verify before removal.Details
remodel kitchen & bathroom, removal of non bearing ktichen wall, add new bathroom & 5 skylights, rewire electrical, replace (5) windows in kind (same size and location), one new window (not facing street). all walls non structural, verify before removal. | $65,000 |
| May 7, 2010 | Completed final sign-off Aug 2010 | 19 Alpine Tr | renovation of an existing bathroom on the 2nd floor. no structural work.Details
renovation of an existing bathroom on the 2nd floor. no structural work. | $13,000 |
| Sep 1, 2009 | Completed final sign-off Dec 2009 | 89 Chattanooga St | renovation of 2nd fl apt in a 2 story bldg w/commercial below. renovate kitchen and bath. remove 2 non bearing interior partition walls. remove dropped ceiling. add recessed cans.Details
renovation of 2nd fl apt in a 2 story bldg w/commercial below. renovate kitchen and bath. remove 2 non bearing interior partition walls. remove dropped ceiling. add recessed cans. | $23,000 |
| Jul 1, 2009 | Completed final sign-off Oct 2010 | 164 Otsego Av | addition to rear of residence (120 sq.ft.) at living level, new rear deck (130 sq. ft.) to be added. kitchen + bath remodel on living level. new dormer on rear upper level-remodel bath + bedrooms, new interior stair to connect to ground level.Details
addition to rear of residence (120 sq.ft.) at living level, new rear deck (130 sq. ft.) to be added. kitchen + bath remodel on living level. new dormer on rear upper level-remodel bath + bedrooms, new interior stair to connect to ground level. | $150,000 |