Andes General Construction
- Based in
- Greenbrae
- On San Francisco permits
- Sep 2007 to Apr 2015
- Last 24 months
- 0 permits filed
33 permits since 2000: 31 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
6 stairs permits: 6 completed. Typically 10 days from filing to permit and 96 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 10, 2015 | Completed final sign-off Apr 2015 | 2854 25th St | to comply with physical inspection #cc7883 item #4, provide an approved path of travel from the rear stairs. addition to pa#201501276808Details
to comply with physical inspection #cc7883 item #4, provide an approved path of travel from the rear stairs. addition to pa#201501276808 | $750 |
| Jun 30, 2014 | Completed final sign-off Jul 2014 | 991 Valencia St | repair 'notice of violation" compliant 3 201479041 item #2 repair stairs (1001 (b) (13) hc < than 50%. rear egess gate repair.Details
repair 'notice of violation" compliant 3 201479041 item #2 repair stairs (1001 (b) (13) hc < than 50%. rear egess gate repair. | $1,500 |
| May 4, 2010 | Completed final sign-off Oct 2010 | 164 Otsego Av | revision to previous permit #200907011767. increase (e) stair width each level to 3'-0" wide.Details
revision to previous permit #200907011767. increase (e) stair width each level to 3'-0" wide. | $3,000 |
| Jul 1, 2009 | Completed final sign-off Oct 2010 | 164 Otsego Av | addition to rear of residence (120 sq.ft.) at living level, new rear deck (130 sq. ft.) to be added. kitchen + bath remodel on living level. new dormer on rear upper level-remodel bath + bedrooms, new interior stair to connect to ground level.Details
addition to rear of residence (120 sq.ft.) at living level, new rear deck (130 sq. ft.) to be added. kitchen + bath remodel on living level. new dormer on rear upper level-remodel bath + bedrooms, new interior stair to connect to ground level. | $150,000 |
| Sep 22, 2008 | Completed final sign-off Aug 2009 | 336 Day St | two story rear addition to (e) dwelling w/ interior stair & exterior stairs, deck and patio, lower level bedroom & study rm, upper level family room.Details
two story rear addition to (e) dwelling w/ interior stair & exterior stairs, deck and patio, lower level bedroom & study rm, upper level family room. | $130,000 |
| Apr 16, 2008 | Completed final sign-off May 2008 | 665 Fell St | replace (e) 3 level wood exterior stairway.Details
replace (e) 3 level wood exterior stairway. | $8,500 |