Andes General Construction
- Based in
- Greenbrae
- On San Francisco permits
- Sep 2007 to Apr 2015
- Last 24 months
- 0 permits filed
33 permits since 2000: 31 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
3 deck permits: 3 completed. Typically 160 days from filing to permit and 249 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 6, 2010 | Completed final sign-off Sep 2011 | 160 Otsego Av | expansion of (e) rear yard deck. addition of an open sided roof, glazed, over (e) & new deck. installation of outside gas fed fireplace & bbq counter with grille & smoker. no increase in height, no alteration to front, no interior changes.Details
expansion of (e) rear yard deck. addition of an open sided roof, glazed, over (e) & new deck. installation of outside gas fed fireplace & bbq counter with grille & smoker. no increase in height, no alteration to front, no interior changes. | $15,000 |
| Jul 1, 2009 | Completed final sign-off Oct 2010 | 164 Otsego Av | addition to rear of residence (120 sq.ft.) at living level, new rear deck (130 sq. ft.) to be added. kitchen + bath remodel on living level. new dormer on rear upper level-remodel bath + bedrooms, new interior stair to connect to ground level.Details
addition to rear of residence (120 sq.ft.) at living level, new rear deck (130 sq. ft.) to be added. kitchen + bath remodel on living level. new dormer on rear upper level-remodel bath + bedrooms, new interior stair to connect to ground level. | $150,000 |
| Sep 22, 2008 | Completed final sign-off Aug 2009 | 336 Day St | two story rear addition to (e) dwelling w/ interior stair & exterior stairs, deck and patio, lower level bedroom & study rm, upper level family room.Details
two story rear addition to (e) dwelling w/ interior stair & exterior stairs, deck and patio, lower level bedroom & study rm, upper level family room. | $130,000 |